Proposed and contested sites are where public decisions are still moving. This view separates confirmed proposal records from inferred city-level leads, then marks whether NDA, funding, water, and power records have been attached yet.
1,418proposal-watch records
1,140proposed project records
134under construction
144blocked or paused
3fuel-cell source leads
Status Confidence
Confirmed/imported status
955
Inferred backlog leads
463
Record Backlog
NDA or secrecy leads
29
Money leads attached
292
Water details attached
212
Power details attached
451
Fuel-cell leads
3
Power source leads
We track fuel-cell and onsite generation mentions separately from the core power field. Operator-level energy deals are useful context, but site-level claims need project-specific source links before they count as verified evidence.
Open Powerutility / power1,071approval / land-use57under construction134blocked / paused143proposal11inferred lead0
How to read proposal scale
Scale labels preserve what a source reported about a project, but they are not one interchangeable capacity measure. A reported MW figure may describe requested load, approved or energized load, IT load, generation, or an ultimate buildout scenario. Check the attached source and the Power section before comparing records.
Backfill Triage
Use this to decide what to work next: fully documented records can be monitored, while records missing three or four fields should usually go to FOIA or local-source review first.
Fully documented24
All four tracking fields have attached evidence flags. Keep monitoring for status changes.
Showing all 1,418 current proposal-watch records by priority. Missing badges mean the item is explicitly backlogged for NDA, funding, water, or power research.
ProjectStatusStageTrackingScale / power
Project LibertyMarion, South Carolina · StreamBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 2,000,000 sq ft; 400 acres; expected online 2027Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Project JupiterSanta Teresa, Doña Ana County, New Mexico · Open AI/OracleUnder constructionconfirmedunder constructionNDAMoneyWaterPowerFuel cells700 MW reported; Mega campus (>1,000 MW); 3,000,000 sq ft; 1400 acres; expected online 2026Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Beaver Dam data centerBeaver Dam, Wisconsin · Meta / Degas LLC / Balloonist LLCUnder constructionconfirmedunder constructionNDAMoneyWaterPower$1B, 520-acre project reported by Wisconsin WatchProject-scale context · Site area · Investment context
Project MarvelBessemer, Jefferson County, Alabama · Logistic Land Investments LLCProposedconfirmedapproval / land-useNDAMoneyWaterPower1200 MW reported; Mega campus (>1,000 MW); 4,500,000 sq ft; 1600 acres; expected online 2032Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Quantica LLC Big Sky CampusBroadview, Yellowstone County, Montana · Quantica / Big Sky Digital InfrastructureProposedconfirmedapproval / land-useNDAMoneyWaterPower1100 MW reported; Mega campus (>1,000 MW); 6,000,000 sq ft; about 5,100 acres; first building expected 2029Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Pumpkin Tech CampusHarlem, Columbia County, Georgia · Cloverleaf InfrastructureProposedconfirmedapproval / land-useNDAMoneyWaterPower500 MW reported; Hyperscale (100-999 MW); 2,870,400 sq ft; 420 acresProject-scale context · MW type not established · Proposed floor area · Site area
Kenosha Microsoft Data CenterKenosha, Wisconsin · MicrosoftProposedconfirmedapproval / land-useNDAMoneyWaterPowerHyperscale (100-999 MW); 1,000,000 sq ft; 240 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project BoarLittle Rock, Pulaski County, Arkansas · Willowbend Capital LLCProposedconfirmedapproval / land-useNDAMoneyWaterPowerUnknownProject-scale context
Northwest Louisiana AI campusesShreveport / Bossier City, Louisiana · Amazon / STACK InfrastructureUnder constructionconfirmedunder constructionNDAMoneyWaterPower$18B planned private investment across three campuses (Amazon company guidance, August 2026; not recorded spending)Project-scale context · Investment context
Talen data center rezoningAnthony Township, Montour County, Pennsylvania · Talen EnergyBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerRezoning-connected proposalProject-scale context
Deep Meadow Ventures campusFranklin Township, Indianapolis, Indiana · Deep Meadow Ventures (Google-linked proposal)Blocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerNearly 468 acresProject-scale context · Site area
Project SpringbankAdairsville, Bartow County, Georgia · Atlas DevelopmentBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower78 MW reported; Large (51-99 MW); 2,270,000 sq ftProject-scale context · MW type not established · Proposed floor area
Wildcat Ridge Data CenterArchbald, Lackawanna County, Pennsylvania · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerMega campus (>1,000 MW); 17,200,000 sq ft; 574 acresProject-scale context · MW type not established · Proposed floor area · Site area
Butte Data CenterButte, Silver Bow County, Montana · Sabey Data CentersBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower50-250 MW reported; Hyperscale (100-999 MW); 1,000,000 sq ft; 600 acres; expected online 2026Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Driftless Area Data CenterCassville, Grant County, Wisconsin · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower400 MW reported; Hyperscale (100-999 MW); 500 acresProject-scale context · MW type not established · Site area
Pittsylvania County Data CenterChatham, Pittsylvania County, Virginia · Balico LLCBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower3500 MW reported; Mega campus (>1,000 MW); 4,752,000 sq ft; 763 acresProject-scale context · MW type not established · Proposed floor area · Site area
Lakeland Equity Group Data CenterCleveland, Cuyahoga County, Ohio · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower150 MW reported; Hyperscale (100-999 MW); 300,000 sq ft; 35 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project AggieCollege Station, Brazos County, Texas · Priority Power ManagementBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower600 MW reported; Hyperscale (100-999 MW); 200 acresProject-scale context · MW type not established · Site area
DeForest QTS Data CenterDeForest, Dane County, Wisconsin · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 1400 acresProject-scale context · MW type not established · Site area
Howell Data CenterFowlerville, Livingston County, Michigan · Santec Consulting/MetaBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 1077 acresProject-scale context · MW type not established · Site area
Project LoonHermantown, St. Louis County, Minnesota · GoogleBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 1,800,000 sq ft; 403 acresProject-scale context · MW type not established · Proposed floor area · Site area
Brightseat Tech Park Data CenterHyattsville, Prince George's County, Maryland · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower820 MW reported; Hyperscale (100-999 MW); 4,100,000 sq ftProject-scale context · MW type not established · Proposed floor area
Project Lincoln: OC Data CenterLa Grange, Oldham County, Kentucky · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower600 MW reported; Hyperscale (100-999 MW); 267 acresProject-scale context · MW type not established · Site area
La Pine Data CenterLa Pine, Deschutes County, Oregon · Box MinerBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower20 MW reported; Unknown; 20 acresProject-scale context · MW type not established · Site area
PrologisLeesburg, Kosciusko County, Indiana · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 550 acresProject-scale context · MW type not established · Site area
Tier III AI Data CenterLewiston, Androscoggin County, Maine · MillCompute LLCBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerProposed 85,000 sq ft in Bates Mill No. 3; two-floor data-center footprintProject-scale context · Proposed floor area
Project TangoLoxahatchee, Palm Beach County, Florida · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerApril 27, 2026 expansion request: 1,032,000 sq ft data-center use within a 3,594,564 sq ft mixed-use master plan on 202.67 acres; proposed floor area, not operating capacityProject-scale context · Proposed floor area · Site area
Project SperoMoore, Spartanburg County, South Carolina · TigerDCBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower100-500 MW reported; Hyperscale (100-999 MW); expected online 2027Project-scale context · MW type not established · Target online date
Mall-O-Manor LLC Data CenterNew Carlisle, St. Joseph County, Indiana · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 999 acresProject-scale context · MW type not established · Site area
Project HarperPeculiar, Cass County, Missouri · Diode VenturesBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 300,000 sq ftProject-scale context · MW type not established · Proposed floor area
Menomonie Data CenterRed Cedar/ Elk Mound, Dunn County, Wisconsin · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 324 acresProject-scale context · MW type not established · Site area
Kingsboro Data Center ProjectTarboro, Edgecombe County, North Carolina · Energy Storage SolutionsBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower900 MW reported; Hyperscale (100-999 MW); 155 acres; expected online Buildout by 2028Project-scale context · MW type not established · Site area · Target online date
Project BusTemple, Carroll and Haralson County, Georgia · Atlas DevelopmentBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 350 acres; expected online 2036Project-scale context · MW type not established · Site area · Target online date
Applied Digital Data CenterToronto, Deuel County, South Dakota · Applied DigitalBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower430 MW reported; Hyperscale (100-999 MW); 1,800,000 sq ft; 150 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project DeltaWalnut Cove, Stokes County, North Carolina · Engineered Land SolutionsBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 1800 acresProject-scale context · MW type not established · Site area
Stargate Data CenterWarren, Trumbull County, Ohio · Bristolville 25 Developer LLCBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower1,500 MW dataset lead; local reporting described a $3.6B, 1.65M sq ft Bristolville 25 proposal on about 133 acresProject-scale context · MW type not established · Proposed floor area · Site area · Investment context
Wilmington Data CenterWilmington, Clinton County, Ohio · AmazonBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower400-600 MW reported; Hyperscale (100-999 MW); 471 acresProject-scale context · MW type not established · Site area
Eneus EnergyHarlingen, Cameron County, Texas · Unknown operatorProposedconfirmedapproval / land-useNDAMoneyWaterPower2,000 MW reported; Mega campus (>1,000 MW); 1785 acresProject-scale context · MW type not established · Site area
Project BluePima County / Tucson, Arizona · Amazon Web Services / Beale InfrastructureProposedconfirmedapproval / land-useNDAMoneyWaterPower290-acre campus proposalProject-scale context · Site area
Google Winding Woods Data CenterSt. George, Dorchester County, North Carolina · GoogleUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 206 acresProject-scale context · Site area
Wilsonville Data CenterWilsonville, Shelby County, Alabama · Northpoint DevelopmentProposedconfirmedutility / powerNDAMoneyWaterPower1008 MW reported; Mega campus (>1,000 MW); 3,000,000 sq ft; 687 acresProject-scale context · MW type not established · Proposed floor area · Site area
Stratos ProjectBox Elder County, Utah · O'Leary Digital / O'Leary VenturesProposedconfirmedproposalNDAMoneyWaterPowerOriginally described as about 40,000 acres; later reduced to about 20,000 acres with roughly 10,000 developable acresProject-scale context · Site area
Project PeninsulaCedar Springs, Kent County, Michigan · Venerly LLC?Proposedconfirmedapproval / land-useNDAMoneyWaterPowerUnknown; 800,000 sq ft; 800 acresProject-scale context · Proposed floor area · Site area
Kline Township Amazon proposalKline Township, Schuylkill County, Pennsylvania · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerApproximately 380 acres; state Fast Track permitting; planning reviewProject-scale context · Site area
AVAIO DigitalBrandon, Rankin County, Mississippi · AVAIO Digital PartnersUnder constructionconfirmedunder constructionNDAMoneyWaterPower116 MW reported; Hyperscale (100-999 MW); 329 acresProject-scale context · MW type not established · Site area
Project ZodiacFort Waye, Allen County, Indiana · GoogleUnder constructionconfirmedunder constructionNDAMoneyWaterPower200-400 MW reported; Hyperscale (100-999 MW); 700 acresProject-scale context · MW type not established · Site area
Hobart Data CenterHobart, Lake County, Indiana · AmazonUnder constructionconfirmedunder constructionNDAMoneyWaterPower2400 MW reported; Mega campus (>1,000 MW); 900 acresProject-scale context · MW type not established · Site area
Homer City Energy CampusHomer City, Indiana County, Pennsylvania · Homer City Redevelopment (with Kiewit as contractor/partner)Under constructionconfirmedunder constructionNDAMoneyWaterPower4500 MW reported; Mega campus (>1,000 MW); 3200 acres; expected online 2027Project-scale context · MW type not established · Site area · Target online date
Skybox Hutto PowerCampus Data CenterHutto, Williamson County, Texas · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerHyperscale (100-999 MW); 160 acresProject-scale context · MW type not established · Site area
Imperial Data CenterImperial, California · Imperial Valley Computer Manufacturing, LLC/ Google (unconfirmed)Under constructionconfirmedunder constructionNDAMoneyWaterPower330 MW reported; Hyperscale (100-999 MW); 950,000 sq ft; 74 acres; expected online 2027Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Nebius Data CenterIndependence, Jackson County, Missouri · PatmosUnder constructionconfirmedunder constructionNDAMoneyWaterPower880 MW reported; Hyperscale (100-999 MW); 2,500,000 sq ftProject-scale context · MW type not established · Proposed floor area
Thunderbird Commerce Center ProjectIndianapolis, Marion County, Indiana · DC BloxUnder constructionconfirmedunder constructionNDAMoneyWaterPower100 MW reported; Hyperscale (100-999 MW); 320,000 sq ft; expected online 2028Project-scale context · MW type not established · Proposed floor area · Target online date
Fort Cherry Development DistrictMcDonald, Washington County, Pennsylvania · Liberty Energy/Imperial Land CorporationUnder constructionconfirmedunder constructionNDAMoneyWaterPower250-1000 MW reported; Mega campus (>1,000 MW); 6,000,000 sq ft; 875 acres; expected online 2027Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Project SailNewnan, Coweta County, Georgia · Atlas DevelopmentUnder constructionconfirmedunder constructionNDAMoneyWaterPower936 MW reported; Hyperscale (100-999 MW); 4,900,000 sq ft; 832 acresProject-scale context · MW type not established · Proposed floor area · Site area
Related Digital/The BarnSaline, Washtenaw County, Michigan · Related Digital/Open AI/OracleUnder constructionconfirmedunder constructionNDAMoneyWaterPower1400 MW reported; Mega campus (>1,000 MW); 2,200,000 sq ft; 575 acresProject-scale context · MW type not established · Proposed floor area · Site area
Shippingport Bruce Mansfield Data Center/ Project PhoenixShippingport, Beaver County, Pennsylvania · Aligned Data CentersUnder constructionconfirmedunder constructionNDAMoneyWaterPower2,550-3,600 MW reported; Mega campus (>1,000 MW); 2,000,000 sq ft; 543 acres; expected online 2029Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Project Blue TucsonTucson, Pima County, Arizona · Beale InfrastructureUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 290 acresProject-scale context · Site area
Salem Township Amazon Data CenterWapwallopen, Luzerne County, Pennsylvania · AmazonUnder constructionconfirmedunder constructionNDAMoneyWaterPower960 MW reported; Hyperscale (100-999 MW); 1582 acres; part of Amazon's $20B Pennsylvania investmentProject-scale context · MW type not established · Site area · Investment context
CyrusOneWaverly/ Talkington Twp, Sangamon County, Illinois · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower632 MW reported; Hyperscale (100-999 MW); 250,000 sq ft; 280 acres; expected online 2027Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Aberdeen Data CenterAberdeen, Adams County, Ohio · AmazonBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower400-1100 MW reported; Mega campus (>1,000 MW); expected online 2028Project-scale context · MW type not established · Target online date
Solstice Data CenterAllen Park, Wayne County, Michigan · SolsticeBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower26 MW reported; Medium (11-50 MW); 45,400 sq ftProject-scale context · MW type not established · Proposed floor area
Blakely Data CenterBlakely, Lackawanna County, Pennsylvania · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower1500 MW reported; Mega campus (>1,000 MW); 1,200,000 sq ft; 121 acresProject-scale context · MW type not established · Proposed floor area · Site area
Townsite Solar 2 LLC (same as Clearway project that is now canceled?)Boulder City, Clark County, Nevada · Townsite Solar 2 LLCBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower170 MW reported; Hyperscale (100-999 MW); 88 acresProject-scale context · MW type not established · Site area
Carlton Cloverleaf Data CenterCarlton, Kewaunee County, Wisconsin · CloverleafBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower100 MW reported; Hyperscale (100-999 MW); 800 acresProject-scale context · MW type not established · Site area
Kentucky Industrial Alliance LLC Data CenterCave City, Barren County, Kentucky · Kentucky Industrial Alliance LLCBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower1200 MW reported; Mega campus (>1,000 MW); 2,000,000 sq ft; 380 acresProject-scale context · MW type not established · Proposed floor area · Site area
Eight Form Data CenterEl Segundo, Los Angeles County, California · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower50 MW reported; Medium (11-50 MW); 230,780 sq ftProject-scale context · MW type not established · Proposed floor area
Irongate Data Center (Swervo)Elk River, Sherburne County, Minnesota · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower33 MW reported; Medium (11-50 MW); 60,000 sq ft; 3 acresProject-scale context · MW type not established · Proposed floor area · Site area
Logistix Data CenterFrankfort, Clinton County, Indiana · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower300 MW reported; Hyperscale (100-999 MW); 833 acresProject-scale context · MW type not established · Site area
Prince William Digital GatewayGainesville, Prince William County, Virginia · Compass, QTS Data CentersBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerMega campus (>1,000 MW); 22,000,000 sq ft; 1760 acresProject-scale context · MW type not established · Proposed floor area · Site area
Hunter Hawking Data CenterGlen Allen, Hanover County, Virginia · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower900 MW reported; Hyperscale (100-999 MW); 4,000,000 sq ft; 400 acresProject-scale context · MW type not established · Proposed floor area · Site area
Tract Data CenterGlen Allen, Hanover County, Virginia · TractBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower900 MW reported; Hyperscale (100-999 MW); 430 acresProject-scale context · MW type not established · Site area
Project HuttoHutto, Williamson County, Texas · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower70 MW reported; Large (51-99 MW); 950,000 sq ft; 40 acresProject-scale context · MW type not established · Proposed floor area · Site area
American Tower/ ATC Watertown LLC/ Edge Data CenterIndianapolis, Marion County, Indiana · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower4 MW reported; Small (0-10 MW); 20,000 sq ft; 7 acresProject-scale context · MW type not established · Proposed floor area · Site area
Eagle Rock Jones CountyJones County, Georgia · Eagle Rock Partners LLC and Thomas & Hutton EngineeringBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower900 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Kalkaska Data CenterKalkaska Township, Kalkaska County, Michigan · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower1000 MW reported; Mega campus (>1,000 MW); 1440 acresProject-scale context · MW type not established · Site area
Lowell Covenant Business Park Data CenterLowell, Kent County, Michigan · Franklin Partners/MicrosoftBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 237 acresProject-scale context · MW type not established · Site area
Bolingbroke Technology CampusMacon, Monroe County, Georgia · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower900 MW reported; Hyperscale (100-999 MW); 5,400,000 sq ftProject-scale context · MW type not established · Proposed floor area
Monterey Park Data CenterMonterey Park, Los Angeles County, California · HMC StratCorp and subsidiary DigiCo REITBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 247,000 sq ft; 16 acresProject-scale context · MW type not established · Proposed floor area · Site area
American Tower Data CenterMount Royal, New Jersey · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower4 MW reported; Small (0-10 MW); 15,895 sq ftProject-scale context · MW type not established · Proposed floor area
Karis Critical Data CenterNaperville, DuPage County, Illinois · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower36 MW reported; Medium (11-50 MW); 145,000 sq ftProject-scale context · MW type not established · Proposed floor area
Starwood Digital Ventures/ Project WashingtonNew Castle, Delaware · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower1200 MW reported; Mega campus (>1,000 MW); 6,000,000 sq ft; 570 acresProject-scale context · MW type not established · Proposed floor area · Site area
Oneonta Data CenterOneonta, Otsego County, New York · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerSmall (0-10 MW)Project-scale context · MW type not established
Lex Developments Data CenterPocatello, Bannock County, Idaho · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower100 MW reported; Hyperscale (100-999 MW); 700,000 sq ftProject-scale context · MW type not established · Proposed floor area
LFF IndustrialRochelle, Ogle County, Kansas · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower48 MW reported; Hyperscale (100-999 MW); 75 acresProject-scale context · MW type not established · Site area
Prologis Shelbyville DataCenterShelbyville, Shelby County, Indiana · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower5,200-10,000 MW reported; Mega campus (>1,000 MW); 576 acresProject-scale context · MW type not established · Site area
Green Data CenterSocorro, New Mexico · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower2000 MW reported; Mega campus (>1,000 MW); 10000 acres; expected online 2030Project-scale context · MW type not established · Site area · Target online date
Riverview Innovation & Technology CampusTonawanda, Erie County, New York · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower600 MW reported; Hyperscale (100-999 MW); 500,000 sq ft; 140 acresProject-scale context · MW type not established · Proposed floor area · Site area
Diode Ventures Data CenterTrinidad, Henderson County, Texas · Diode VenturesBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower150 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Vulcan Core LLC BitcoinTyler, Smith County, Texas · Vulcan Core LLCBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower12 MW reported; Medium (11-50 MW); 8,090 sq ft; 2 acresProject-scale context · MW type not established · Proposed floor area · Site area
Cetronia Road Data CenterUpper Macungie, Lehigh County, Pennsylvania · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 2,600,000 sq ft; 194 acresProject-scale context · MW type not established · Proposed floor area · Site area
Barrington Hills Data CenterBarrington Hills, Cook County, Illinois · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknownProject-scale context
Chandler Data CenterChandler, Maricopa County, Arizona · Active InfrastructureBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 400,000 sq ft; 40 acresProject-scale context · Proposed floor area · Site area
Crooked Creek Data CenterGray, Jones County, Georgia · Eagle Rock Partners LLC and Thomas & Hutton EngineeringBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 1,800,000 sq ft; 634 acresProject-scale context · Proposed floor area · Site area
Onmine Data CenterKillen, Bell County, Texas · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 3 acresProject-scale context · Site area
Amazon King George Data CenterKing George, Virginia · AmazonBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 7,250,000 sq ft; 869 acresProject-scale context · Proposed floor area · Site area
Tract Data CenterMooresville, Iredell County, North Carolina · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 1,500,000 sq ft; 400 acresProject-scale context · Proposed floor area · Site area
South Annville Data CenterSouth Annville Twp, Lebanon County, Pennsylvania · Inch & CompanyBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 640,000 sq ft; 100 acres; expected online 2027Project-scale context · Proposed floor area · Site area · Target online date
Kenosha data center siteKenosha, Wisconsin · MicrosoftProposedconfirmedproposalNDAMoneyWaterPowerBillion-dollar-scale development discussionsProject-scale context
Project Tiger ZouMoberly, Randolph County, Missouri · Unknown operatorProposedconfirmedapproval / land-useNDAMoneyWaterPowerUnknown; 1000 acresProject-scale context · Site area
Fermi America HyperGrid/ Project MatadorAmarillo, Carson County, Texas · Fermi America and Texas TechUnder constructionconfirmedunder constructionNDAMoneyWaterPower11,000-17,000 MW reported; Mega campus (>1,000 MW); 18,000,000 sq ft; 5769 acres; expected online 2026Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Antelope Data CenterCedar City, Iron County, Utah · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower1500 MW reported; Mega campus (>1,000 MW); 1,350,000 sq ft; 640 acresProject-scale context · MW type not established · Proposed floor area · Site area
Jailhouse Studios Data CenterChattanooga, Hamilton County, Tennessee · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerSmall (0-10 MW)Project-scale context · MW type not established
Project TaurusColorado Springs, El Paso County, Colorado · RaedenUnder constructionconfirmedunder constructionNDAMoneyWaterPower50 MW reported; Medium (11-50 MW); 451,217 sq ft; 22 acresProject-scale context · MW type not established · Proposed floor area · Site area
Ridgeline MicrogridDavis, Tucker County, West Virginia · Fundamental Data LLCUnder constructionconfirmedunder constructionNDAMoneyWaterPower1,656 MW reported; Mega campus (>1,000 MW); 10000 acresProject-scale context · MW type not established · Site area
CoreSite DE3 Data CenterElyria-Swansea (Denver), Denver County, Colorado · CoreSiteUnder constructionconfirmedunder constructionNDAMoneyWaterPower75 MW reported; Large (51-99 MW); 180,000 sq ft; expected online 2026Project-scale context · MW type not established · Proposed floor area · Target online date
CyrusOne/Eolian Data CenterFort Worth, Tarrant County, Texas · CyrusOne/EolianUnder constructionconfirmedunder constructionNDAMoneyWaterPower70 MW reported; Large (51-99 MW); 1,900,000 sq ft; expected online 2026Project-scale context · MW type not established · Proposed floor area · Target online date
AWS GilroyGilroy, Santa Clara County, California · AmazonUnder constructionconfirmedunder constructionNDAMoneyWaterPower49-98 MW reported; Large (51-99 MW); 438,500 sq ft; 56 acres; expected online 2026Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Project HummingbirdGreensboro, Greene County, Pennsylvania · Essential Utilities/ International Electric Power of PittsburghUnder constructionconfirmedunder constructionNDAMoneyWaterPower900-1000 MW reported; Mega campus (>1,000 MW); 1400 acres; expected online 2028Project-scale context · MW type not established · Site area · Target online date
Wildwood Ranch Data CenterJoplin, Jasper County, Missouri · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower200 MW reported; Hyperscale (100-999 MW); 600 acresProject-scale context · MW type not established · Site area
AVAIO Perseus Data CenterPittsburg, Contra Costa County, California · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower99 MW reported; Hyperscale (100-999 MW); 300,000 sq ft; 76 acres; expected online 2027Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Vantage Data Centers Lighthouse CampusPort Washington, Ozaukee County, Wisconsin · Vantage Data Centers/Open AI/Oracle/ Cloverleaf InfrastructureUnder constructionconfirmedunder constructionNDAMoneyWaterPower1,300-3,599 MW reported; Mega campus (>1,000 MW); 2000 acres; expected online 2028Project-scale context · MW type not established · Site area · Target online date
Skybox Round Rock Data CenterRound Rock, Williamson County, Texas · Skybox DatacentersUnder constructionconfirmedunder constructionNDAMoneyWaterPower40 MW reported; Medium (11-50 MW); 150,000 sq ft; 30 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project SpringSand Springs, Osage County, Oklahoma · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerHyperscale (100-999 MW); 565,000 sq ft; 827 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project Stratos WesternSnowville, Box Elder County, Utah · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerMega campus (>1,000 MW); 40000 acresProject-scale context · MW type not established · Site area
Springdale/ Dynamo Data CenterSpringdale, Allegheny County, Pennsylvania · Allegheny DC Property CoUnder constructionconfirmedunder constructionNDAMoneyWaterPower350 MW reported; Hyperscale (100-999 MW); 565,000 sq ft; 47 acresProject-scale context · MW type not established · Proposed floor area · Site area
Blueprint ProjectsTaylor, Williamson County, Texas · Blueprint ProjectUnder constructionconfirmedunder constructionNDAMoneyWaterPower30 MW reported; Large (51-99 MW); 135,000 sq ft; 52 acresProject-scale context · MW type not established · Proposed floor area · Site area
Comanche Circle Data CentersTolar, Hood County, Texas · Sailfish Digital VenturesUnder constructionconfirmedunder constructionNDAMoneyWaterPower600 MW reported; Mega campus (>1,000 MW); 5,500,000 sq ft; 2000 acresProject-scale context · MW type not established · Proposed floor area · Site area
Nebius Data CenterVineland, Cumberland County, New Jersey · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower300-2,000 MW reported; Mega campus (>1,000 MW); 2,600,000 sq ftProject-scale context · MW type not established · Proposed floor area
Brandy Station campusCulpeper County, Virginia · Culpeper Acquisitions / developer proposalBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower$12B, 4.6M-square-foot proposal reportedProject-scale context · Investment context
DeForest data center proposalDeForest, Wisconsin · Undisclosed / Vantage-linked reportingBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower$12B proposal reported by Wisconsin WatchProject-scale context · Investment context
Aliquippa Data Center Land AdvertisementAliquippa, Beaver County, Pennsylvania · Five 9s Digital/Fezzik EnergyProposedconfirmedutility / powerNDAMoneyWaterPower496 MW reported; Hyperscale (100-999 MW); 250,000 sq ft; 86 acresProject-scale context · MW type not established · Proposed floor area · Site area
QLevr Data CenterCharlestown, Clark County, Indiana · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower3 MW reported; Small (0-10 MW); 60,000 sq ft; 12 acresProject-scale context · MW type not established · Proposed floor area · Site area
Western Hospitality Partners Data CenterChildersburg, Talladega County, Alabama · Unknown operatorProposedconfirmedapproval / land-useNDAMoneyWaterPower500 MW reported; Hyperscale (100-999 MW); 486 acresProject-scale context · MW type not established · Site area
Project Gold Data CenterClifton Township / Covington Township, Lackawanna County, Pennsylvania · 1778 Rich Pike LLCProposedconfirmedapproval / land-useNDAMoneyWaterPower1500 MW reported; Mega campus (>1,000 MW); 9,400,000 sq ft; 1000 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project EagleDry Branch, Twiggs County, Georgia · Eagle Rock Partners LLC and Thomas & Hutton EngineeringProposedconfirmedutility / powerNDAMoneyWaterPower900 MW reported; Hyperscale (100-999 MW); 300 acresProject-scale context · MW type not established · Site area
DeepGreen Western Passage SPV LLC Data CenterEastport, Washington County, Maine · DeepGreen Western Passage SPV LLCProposedconfirmedapproval / land-useNDAMoneyWaterPower51 MW reported; Large (51-99 MW)Project-scale context · MW type not established
Festus Data CenterFestus, Jefferson County, Missouri · CRGProposedconfirmedapproval / land-useNDAMoneyWaterPower600 MW reported; Hyperscale (100-999 MW); 360 acresProject-scale context · MW type not established · Site area
Jumping Bison LLC Data CenterGreensburg, Decatur County, Indiana · Jumping Bison LLCProposedconfirmedapproval / land-useNDAMoneyWaterPowerHyperscale (100-999 MW); 550 acresProject-scale context · MW type not established · Site area
Logistix Data CenterHamilton, Butler County, Ohio · Logistix Property GroupProposedconfirmedapproval / land-useNDAMoneyWaterPower200-240 MW reported; Hyperscale (100-999 MW); about 310,640-320,000 sq ft; 29 acresProject-scale context · MW type not established · Proposed floor area · Site area
Sentinel Data Center: Project ShirleyHebron, Lake County, Indiana · SentinelProposedconfirmedapproval / land-useNDAMoneyWaterPower500 MW reported; Hyperscale (100-999 MW); 160 acresProject-scale context · MW type not established · Site area
Tuckahoe Technology Park Data CentersHenrico, Goochland County, Virginia · Tract/ VALCO Goochland, LLCProposedconfirmedapproval / land-useNDAMoneyWaterPower900 MW reported; Hyperscale (100-999 MW); 872 acresProject-scale context · MW type not established · Site area
Former Remington Gun Factory Data CenterIlion, Herkimer County, New York · Unknown operatorProposedconfirmedapproval / land-useNDAMoneyWaterPower200-500 MW reported; Hyperscale (100-999 MW); 250,000-500,000 sq ft; 32 acresProject-scale context · MW type not established · Proposed floor area · Site area
Joliet Technology CenterJackson Twp/ Joliet, Will County, Illinois · PowerHouseProposedconfirmedapproval / land-useNDAMoneyWaterPower1800 MW reported; Mega campus (>1,000 MW); 3,468,000 sq ft; 795 acresProject-scale context · MW type not established · Proposed floor area · Site area
Jarrell Data CenterJarrell, Williamson County, Texas · Prominent Property Group / Savannah Developers / Power Infrastructure PartnersProposedconfirmedutility / powerNDAMoneyWaterPower200 MW reported; Hyperscale (100-999 MW); 151 acresProject-scale context · MW type not established · Site area
Lacy Lakeview Data CenterLacy Lakeview, McLennan County, Texas · InfraKey CapitalProposedconfirmedproposedNDAMoneyWaterPower1000 MW reported; Mega campus (>1,000 MW); 520 acres; expected online 2030Project-scale context · MW type not established · Site area · Target online date
CoreWeave Lancaster 1Lancaster, Pennsylvania · Chirisa Technology Parks and Machine Investment Group/CoreWeaveProposedconfirmedapproval / land-useNDAMoneyWaterPower100-300 MW reported; Hyperscale (100-999 MW); 450,000 sq ft; 78 acresProject-scale context · MW type not established · Proposed floor area · Site area
CoreWeave Lancaster 2Lancaster, Pennsylvania · Chirisa Technology Parks and Machine Investment Group/CoreWeaveProposedconfirmedapproval / land-useNDAMoneyWaterPower100-300 MW reported; Hyperscale (100-999 MW); 825,000 sq ft; 66 acresProject-scale context · MW type not established · Proposed floor area · Site area
Hut8 Data CenterLatham/ Laenna Twp, Logan County, Illinois · Hut 8Proposedconfirmedapproval / land-useNDAMoneyWaterPower500 MW reported; Hyperscale (100-999 MW); 1,000,000 sq ft; 250 acres; expected online 2029Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Project LeoLittle Rock, Pulaski County, Arkansas · Avaio DigitalProposedconfirmedapproval / land-useNDAMoneyWaterPower150-1070 MW reported; Hyperscale (100-999 MW); 296 acres on AVAIO project page / 760 acres in AEDC release; expected online 2027Project-scale context · MW type not established · Site area · Target online date
Ranalli Super DC, LLC Data CenterLysander, Onondaga County, New York · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower300 MW reported; Hyperscale (100-999 MW); 124 acresProject-scale context · MW type not established · Site area
ReLoad Data CenterMaryville, Nodaway County, Missouri · ReLoadProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW)Project-scale context · MW type not established
Eagle Rock Data CenterPalmer, Christian County, Illinois · Eagle RockBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower1000 MW reported; Mega campus (>1,000 MW); 475 acresProject-scale context · MW type not established · Site area
Edged Data Center \Prichard, Mobile County, Alabama · EdgedProposedconfirmedapproval / land-useNDAMoneyWaterPower8 MW reported; Small (0-10 MW); expected online 2026Project-scale context · MW type not established · Target online date
Project Stratos EasternSnowville, Box Elder County, Utah · Unknown operatorProposedconfirmedapproval / land-useNDAMoneyWaterPower9000 MW reported; Mega campus (>1,000 MW); 40000 acresProject-scale context · MW type not established · Site area
Atlas Industrial Data CenterSouth Whitehall Township, Lehigh County, Pennsylvania · EdgedProposedconfirmedutility / powerNDAMoneyWaterPower725-725 MW reported; Hyperscale (100-999 MW); 1,500,000 sq ft; 410 acresProject-scale context · MW type not established · Proposed floor area · Site area
Sterling Data CenterSterling, Logan County, Colorado · Granite RenewablesProposedconfirmedutility / powerNDAMoneyWaterPower2000 MW reported; Mega campus (>1,000 MW); 4198 acresProject-scale context · MW type not established · Site area
Sullivan County Data CenterSullivan, Indiana · FluidstackProposedconfirmedapproval / land-useNDAMoneyWaterPower430 MW reported; Hyperscale (100-999 MW); 1000 acres; expected online 2026?Project-scale context · MW type not established · Site area · Target online date
Project Bluestem (pre-proposal)Tonganoxie, Leavenworth County, Kansas · Cloverleaf InfrastructureProposedconfirmedapproval / land-useNDAMoneyWaterPower600-1200 MW reported; Mega campus (>1,000 MW); 3,000,000 sq ft; 2000 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project AlpacaUnion, South Carolina · Volt Edge EnergyProposedconfirmedutility / powerNDAMoneyWaterPower49 MW reported; Medium (11-50 MW); expected online 2027Project-scale context · MW type not established · Target online date
Urbana Technology HubUrbana, Champaign County, Ohio · Thor EquitiesProposedconfirmedutility / powerNDAMoneyWaterPower100 MW reported; Hyperscale (100-999 MW); 460,000 sq ft; 48 acresProject-scale context · MW type not established · Proposed floor area · Site area
Walterboro Data CenterWalterboro, Colleton County, South Carolina · Eagle Rock PartnersProposedconfirmedapproval / land-useNDAMoneyWaterPower1,000 MW reported; Mega campus (>1,000 MW); 859 acresProject-scale context · MW type not established · Site area
Roundhouse Data CenterCascade Locks, Hood River County, Oregon · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknownProject-scale context
Provident Realty AdvisorsChesteron, Porter County, Indiana · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknownProject-scale context
Karis Data CenterDundee, Cook County, Illinois · KarisBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 186 acresProject-scale context · Site area
Cloverleaf Infrastructure Data CenterDundee, Monroe County, Michigan · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 750 acresProject-scale context · Site area
Ekron Data CenterEkron, Meade County, Kentucky · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 138 acresProject-scale context · Site area
Conley Creek Data CenterEllenwood, DeKalb County, Georgia · Telecad WirelessBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 1,000,000 sq ftProject-scale context · Proposed floor area
Jones Sausage Road Data CenterGarner, Wake County, North Carolina · BeaconBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 100,000 sq ft; 13 acresProject-scale context · Proposed floor area · Site area
Cloverleaf Data CenterGreenleaf, Brown County, Wisconsin · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 500 acresProject-scale context · Site area
Project HazelnutHazelton, Luzerne County, Pennsylvania · NorthPoint DevelopmentBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 1280 acres; expected online 2027Project-scale context · Site area · Target online date
Natelli Investments Data CenterHenderson, Vance County, North Carolina · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 40 acresProject-scale context · Site area
Hernando Deltona Data CenterHernando, Citrus County, Florida · Deltona Corp.Blocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 1400 acresProject-scale context · Site area
Kalamazoo County Data CenterKalamazoo, Michigan · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknownProject-scale context
Amazon Louisa County Data CenterLouisa County, Louisa County, Virginia · AmazonBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 7,200,000 sq ft; 1374 acresProject-scale context · Proposed floor area · Site area
Markely Data CenterLowell, Middlesex County, Massachusetts · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 352,000 sq ft; 14 acresProject-scale context · Proposed floor area · Site area
Crystal Geyser location Data CenterMount Shasta, Siskiyou County, California · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknownProject-scale context
MS Solar Grid DataNew Orleans East, Orleans County, Louisiana · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknownProject-scale context
Newton Data CenterNewton, Sussex County, New Jersey · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 650,000 sq ft; 97 acresProject-scale context · Proposed floor area · Site area
Nottingham Data CenterNottingham, Rockingham County, New Hampshire · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 40 acresProject-scale context · Site area
Okee-OneOkeechobee, Florida · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 200 acresProject-scale context · Site area
BLE Landholdings Data CenterPacific, Franklin County, Missouri · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 490 acresProject-scale context · Site area
Project AtlasPorter, Wagoner County, Oklahoma · Beale InfrastructureBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknownProject-scale context
Caledonia Data CenterRacine/ Caledonia, Racine County, Wisconsin · MicrosoftBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 244 acresProject-scale context · Site area
Ransom Township Data CenterRansom Twp, Lackawanna County, Pennsylvania · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 251 acresProject-scale context · Site area
Voltcore Bitcoin MineSomerville, Morgan County, Alabama · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 15 acresProject-scale context · Site area
Montour County Amazon Data CenterWashingtonville, Montour County, Pennsylvania · Talen Energy/AmazonBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 800 acresProject-scale context · Site area
STAMP Data Center \Alabama, Genesee County, New York · Genesee County Economic Development Corporation (GCEDC)/Plug Power/Edwards VaccumProposedconfirmedapproval / land-useNDAMoneyWaterPower500 MW reported; Hyperscale (100-999 MW); 2,200,000 sq ft; 1263 acresProject-scale context · MW type not established · Proposed floor area · Site area
Kenwood CommonsAlbany, New York · EdgeProposedconfirmedutility / powerNDAMoneyWaterPower100 MW reported; Hyperscale (100-999 MW); 76 acresProject-scale context · MW type not established · Site area
West Emaus Avenue Data CenterAllentown, Lehigh County, Pennsylvania · Quantm Group, LLCProposedconfirmedutility / powerNDAMoneyWaterPower80 MW reported; Large (51-99 MW); 247,342 sq ftProject-scale context · MW type not established · Proposed floor area
Project Gravity Data CenterArchbald, Lackawanna County, Pennsylvania · Archbald 25 Developer LLCProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 1,600,000 sq ft; 186 acresProject-scale context · MW type not established · Proposed floor area · Site area
Muskie Data Campus Data CenterAshland, Boyd County, Kentucky · TeraWulfProposedconfirmedutility / powerNDAMoneyWaterPower500 MW reported; Mega campus (>1,000 MW); 285 acres; expected online 2028Project-scale context · MW type not established · Site area · Target online date
EdgeConneX Ashville Data CenterAshville, Pickaway County, Ohio · EdgeConneXProposedconfirmedutility / powerNDAMoneyWaterPower200 MW reported; Hyperscale (100-999 MW); 200 acresProject-scale context · MW type not established · Site area
Thor Equities Data CenterAugusta Township, Washtenaw County, Michigan · Unknown operatorProposedconfirmedapproval / land-useNDAMoneyWaterPowerHyperscale (100-999 MW); 822 acresProject-scale context · MW type not established · Site area
Project TritonBarberton, Summit County, Ohio · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 485,000 sq ft; 90 acresProject-scale context · MW type not established · Proposed floor area · Site area
Viridien Data CenterBrenham, Washington County, Texas · ViridienProposedconfirmedutility / powerNDAMoneyWaterPower45 MW reported; Medium (11-50 MW); 40,000 sq ft; 21 acresProject-scale context · MW type not established · Proposed floor area · Site area
Bristol Technology CenterBristol, Hartford County, Connecticut · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerFuel cells4 MW reported; Small (0-10 MW); 15,000 sq ft; 2 acresProject-scale context · MW type not established · Proposed floor area · Site area
Starpointe Industrial Park Data CenterBurgettstown, Washington County, Pennsylvania · Prime Data Centers LLCProposedconfirmedutility / powerNDAMoneyWaterPower450 MW reported; Hyperscale (100-999 MW); 500,000 sq ft; 152 acresProject-scale context · MW type not established · Proposed floor area · Site area
Global Stack Data CenterCalistoga, Napa County, California · Global Stack/ EdgeProposedconfirmedutility / powerNDAMoneyWaterPower10 MW reported; Small (0-10 MW); 70 acresProject-scale context · MW type not established · Site area
Warrenton Amazon Data CenterCatlett, Fauquier County, Virginia · AmazonUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 220,000 sq ft; 42 acresProject-scale context · Proposed floor area · Site area
Digital Realty Charlotte Data CenterCharlotte, Mecklenburg County, North Carolina · Unknown operatorProposedconfirmedapproval / land-useNDAMoneyWaterPower400 MW reported; Hyperscale (100-999 MW); 3,000,000 sq ft; 156 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project TemboCheyenne, Laramie County, Wyoming · Google / Black Hills (formerly Crusoe)Proposedconfirmedapproval / land-useNDAMoneyWaterPower1,800 MW proposed; scalable to 10,000 MW (company claim); Mega campus (>1,000 MW); 1375 acres; expected service 2028Project-scale context · MW type not established · Site area
Blue Fern Data CenterCle Elum, Kittitas County, Washington · Blue FernProposedconfirmedutility / powerNDAMoneyWaterPower20 MW reported; Medium (11-50 MW); 100,000 sq ft; 75 acresProject-scale context · MW type not established · Proposed floor area · Site area
Slavic Village Data CenterCleveland, Cuyahoga County, Ohio · Lakeland Equity GroupProposedconfirmedutility / powerNDAMoneyWaterPower150 MW reported; Hyperscale (100-999 MW); 300,000 sq ft; 35 acresProject-scale context · MW type not established · Proposed floor area · Site area
Coachella Valley Technology CampusCoachella, Riverside County, California · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower270-600 MW reported; Hyperscale (100-999 MW); 240 acresProject-scale context · MW type not established · Site area
Qumulus AIDenton, Texas · Qumulus AIProposedconfirmedutility / powerNDAMoneyWaterPower20 MW reported; Medium (11-50 MW); 4 acresProject-scale context · MW type not established · Site area
Dickerson Data CentersDickerson, Montgomery County, Maryland · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower300 MW reported; Mega campus (>1,000 MW); 110 acresProject-scale context · MW type not established · Site area
Smithfield Gateway Data CenterEast Stroudsburg, Monroe County, Pennsylvania · Gateway DevelopmentProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 500,000 sq ftProject-scale context · MW type not established · Proposed floor area
Southfield Data CenterFarmington Hills, Oakland County, Michigan · MetrobloksProposedconfirmedutility / powerNDAMoneyWaterPower100 MW reported; Hyperscale (100-999 MW); 110,000 sq ftProject-scale context · MW type not established · Proposed floor area
Fort Meade Data CenterFort Meade, Polk County, Florida · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 4,400,000 sq ft; 1163 acresProject-scale context · Proposed floor area · Site area
TenKey LandCoFranklin, Simpson County, Kentucky · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 600,000 sq ftProject-scale context · Proposed floor area
Quantum FrederickFrederick, Maryland · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower264-2,400 MW reported; Mega campus (>1,000 MW); 1,100,000 sq ft; 2100 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project TurboGainesville, Hall County, Georgia · Project Turbo, IncProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 900,000 sq ft; 145 acres; expected online 2027-28Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Mercer County Data CenterHarrodsburg, Mercer County, Kentucky · Jones Lang Sallee (Gray Construction?)Proposedconfirmedutility / powerNDAMoneyWaterPower645 MW reported; Hyperscale (100-999 MW); 555 acres; expected online 2030Project-scale context · MW type not established · Site area · Target online date
Panattoni Data Center \Harrodsburg/ Burgin, Mercer County, Kentucky · PanattoniProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 900 acresProject-scale context · MW type not established · Site area
Project Aquilla: Abbott Holding Data CenterHill County, Hill County, Texas · RCM HillProposedconfirmedutility / powerNDAMoneyWaterPower1,235 MW reported; Mega campus (>1,000 MW); 800 acresProject-scale context · MW type not established · Site area
Adams Fork Harless Data CenterHolden, Mingo County, West Virginia · TransGas Development, LLCProposedconfirmedapproval / land-useNDAMoneyWaterPower2398.5 MW reported; Mega campus (>1,000 MW)Project-scale context · MW type not established
Deep Atomic Data CenterIdaho Falls, Bonneville County, Idaho · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower60 MW reported; Large (51-99 MW)Project-scale context · MW type not established
Brightwood Data CenterIndianapolis, Marion County, Indiana · MetrobloksUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 14 acresProject-scale context · Site area
Inyokern Data CenterInyokern, Kern County, California · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower99 MW reported; Large (51-99 MW); 238,000 sq ft; 50 acres; expected online 2028Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Janesville Data CenterJanesville, Rock County, Wisconsin · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower25-200 MW reported; Hyperscale (100-999 MW); 4,800,000 sq ft; 240 acresProject-scale context · MW type not established · Proposed floor area · Site area
Red Wolf PropertiesKansas City, Wyandotte County, Kansas · Unknown operatorProposedconfirmedapproval / land-useNDAMoneyWaterPower600 MW reported; Hyperscale (100-999 MW); 1,980,000 sq ft; 540 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project Lincoln: OC Data Center (second version)La Grange, Oldham County, Kentucky · WHPProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 2,500,000 sq ftProject-scale context · MW type not established · Proposed floor area
Lake Hawkeye Data CenterLansing, Tompkins County, New York · TeraWulfProposedconfirmedutility / powerNDAMoneyWaterPower150 MW reported; Hyperscale (100-999 MW); 1,360,000 sq ft; 183 acresProject-scale context · MW type not established · Proposed floor area · Site area
Cloud Centers Data CenterLisle, DuPage County, Illinois · Cloud CentersProposedconfirmedutility / powerNDAMoneyWaterPower50 MW reported; Medium (11-50 MW); 256,000 sq ft; expected online 2027Project-scale context · MW type not established · Proposed floor area · Target online date
Project Blue MaranaMarana, Pima County, Arizona · Beale InfrastructureProposedconfirmedutility / powerNDAMoneyWaterPower250-600 MW reported; Hyperscale (100-999 MW); 610 acres; expected online 2027Project-scale context · MW type not established · Site area · Target online date
Lumon Solutions Data CenterMarshfield, Webster County, Missouri · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerSmall (0-10 MW); 4,800 sq ft; 5 acresProject-scale context · MW type not established · Proposed floor area · Site area
Northern DataMaysville, Jackson County, Georgia · RumbleProposedconfirmedutility / powerNDAMoneyWaterPower120-180 MW reported; Unknown; 57 acres; expected online 2027Project-scale context · MW type not established · Site area · Target online date
Joule Power AI Data Center CampusMillard County, Millard County, Utah · Joule PowerProposedconfirmedutility / powerNDAMoneyWaterPower455-12000 MW reported; Mega campus (>1,000 MW); 4000 acresProject-scale context · MW type not established · Site area
Dorrance Township Data CenterMountain Top, Luzerne County, Pennsylvania · Brewster Land Company, LLCProposedconfirmedapproval / land-useNDAMoneyWaterPowerHyperscale (100-999 MW); 918,000 sq ft; 155 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project GreenNew Florence, Montgomery County, Missouri · NorthPoint Development/AmazonProposedconfirmedapproval / land-useNDAMoneyWaterPowerHyperscale (100-999 MW); 3,740,000 sq ft; 1000 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project SpadeNew Florence, Montgomery County, Missouri · Related Digital/GoogleProposedconfirmedapproval / land-useNDAMoneyWaterPower1200 MW reported; Mega campus (>1,000 MW); 3,242,760 sq ft; 910 acresProject-scale context · MW type not established · Proposed floor area · Site area
Lyon Township Data Center/ Project FlexNew Hudson, Oakland County, Michigan · Verrus/AnthropicProposedconfirmedutility / powerNDAMoneyWaterPower200-525 MW reported; Hyperscale (100-999 MW); 1,800,000 sq ft; 172 acresProject-scale context · MW type not established · Proposed floor area · Site area
Morgantown Data CenterNewburg, Charles County, Maryland · TeraWulf, Inc.Proposedconfirmedutility / powerNDAMoneyWaterPower210-500 MW reported; Hyperscale (100-999 MW); 250 acresProject-scale context · MW type not established · Site area
Former Oakland Scientific FacilityOakland, Alameda County, California · Behring CompaniesProposedconfirmedutility / powerNDAMoneyWaterPower20 MW reported; Medium (11-50 MW); 83,000 sq ftProject-scale context · MW type not established · Proposed floor area
Page Data CenterPage, Coconino County, Arizona · Huntley LLCProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 500 acresProject-scale context · MW type not established · Site area
MD-PHX1 Data CenterPhoenix, Maricopa County, Arizona · Menlo DigitalProposedconfirmedutility / powerNDAMoneyWaterPower180 MW reported; Hyperscale (100-999 MW); 1,000,000 sq ft; 38 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project LaurelPottstown, Montgomery County, Pennsylvania · MCD 7 LLCProposedconfirmedutility / powerNDAMoneyWaterPower750 MW reported; Hyperscale (100-999 MW); 1,400,000 sq ftProject-scale context · MW type not established · Proposed floor area
Gigaland Remington Data CenterRemington, Fauquier County, Virginia · Gigaland Data CentersProposedconfirmedutility / powerNDAMoneyWaterPower136 MW reported; Hyperscale (100-999 MW); 847,400 sq ftProject-scale context · MW type not established · Proposed floor area
Atlas Battey Business ComplexRome, Floyd County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower500-900 MW reported; Hyperscale (100-999 MW); 114 acresProject-scale context · MW type not established · Site area
Drox Group Data CenterRural Hall, Forsyth County, North Carolina · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 1,300,000 sq ft; 129 acresProject-scale context · MW type not established · Proposed floor area · Site area
Grant County Data CenterSheridan, Grant County, Arkansas · Clean Cloud EnergyProposedconfirmedutility / powerNDAMoneyWaterPower500 MW reported; Hyperscale (100-999 MW); 1,000,000 sq ft; 753 acresProject-scale context · MW type not established · Proposed floor area · Site area
Gemini Data Center SD LLCSioux Falls, Minnehaha County, South Dakota · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower500 MW reported; Hyperscale (100-999 MW); 160 acresProject-scale context · MW type not established · Site area
Whiterose Partners LLC Data CenterSouth Elgin, Kane County, Illinois · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower48 MW reported; Medium (11-50 MW); 200,000 sq ft; 9 acresProject-scale context · MW type not established · Proposed floor area · Site area
Zediker Station Data Center Land AdvertisementSouth Strabane Township, Washington County, Pennsylvania · CNX Resources/Jones Lang LaSalle (JLL)Proposedconfirmedutility / powerNDAMoneyWaterPower400-700 MW reported; Hyperscale (100-999 MW); 400 acresProject-scale context · MW type not established · Site area
Pennhurst Data CenterSpring City (East Vincent Township), Chester County, Pennsylvania · Pennhurst Holdings LLCProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 1,300,000 sq ftProject-scale context · MW type not established · Proposed floor area
Project TallmadgeStrasburg, Shenandoah County, Virginia · TakanockProposedconfirmedutility / powerNDAMoneyWaterPower180 MW reported; Hyperscale (100-999 MW); 87 acres; expected online 2030Project-scale context · MW type not established · Site area · Target online date
Project MilaTrenton, Butler County, Ohio · PrologisProposedconfirmedutility / powerNDAMoneyWaterPower240 MW reported; Hyperscale (100-999 MW); 1,000,000 sq ft; 142 acresProject-scale context · MW type not established · Proposed floor area · Site area
Troy Cloverleaf Data CenterTroy, Madison County, Illinois · CloverleafProposedconfirmedutility / powerNDAMoneyWaterPower500 MW reported; Hyperscale (100-999 MW); 1,584,000 sq ft; 300 acres; expected online 2028Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Crusoe Data CenterUnknown (Northern Callaway Co), Callaway County, Missouri · CrusoeProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 800,000 sq ft; 14 acresProject-scale context · MW type not established · Proposed floor area · Site area
Panattoni Project CannoliVan Buren Township, Wayne County, Michigan · GoogleProposedconfirmedapproval / land-useNDAMoneyWaterPower1000-2700 MW reported; Mega campus (>1,000 MW); 800,000 sq ft; 282 acresProject-scale context · MW type not established · Proposed floor area · Site area
Provident Data Center/Gateway Digital CampusVilla Ridge, Franklin County, Missouri · ProvidentUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 575 acresProject-scale context · Site area
Takanock Data CenterWaddell, Maricopa County, Arizona · DigitalBridgeProposedconfirmedutility / powerNDAMoneyWaterPower700 MW reported; Hyperscale (100-999 MW); 2,000,000 sq ft; 160 acres; expected online 2028Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Waterville Data Center Land AdvertisementWaterville, Lucas County, Ohio · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW)Project-scale context · MW type not established
Adams Fork Wharncliffe Data CenterWharncliffe, Mingo County, West Virginia · TransGas Development, LLCProposedconfirmedapproval / land-useNDAMoneyWaterPower2398.5 MW reported; Mega campus (>1,000 MW)Project-scale context · MW type not established
Wyalusing Data CenterWyalusing, Bradford County, Pennsylvania · New Fortress EnergyProposedconfirmedutility / powerNDAMoneyWaterPower248 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Google Abernathy Data CenterAbernathy, Hale County, Texas · Fluidstack/TeraWulf/GoogleBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower168-240 MW reported; Hyperscale (100-999 MW); 120 acres; expected online 2026Project-scale context · MW type not established · Site area · Target online date
Archbald Data CenterEynon, Lackawanna County, Pennsylvania · PDC Realty LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 620,000 sq ft; 84 acresProject-scale context · Proposed floor area · Site area
Sentinel Grove Technology Park/ Project JarvisFort Pierce, St. Lucie County, Florida · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower1000 MW reported; Mega campus (>1,000 MW); 15,000,000 sq ft; 1218 acresProject-scale context · MW type not established · Proposed floor area · Site area
Franklin Furnace Data CenterFranklin Furnace, Scioto County, Ohio · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 500,000 sq ftProject-scale context · Proposed floor area
Deep Green Data CenterLansing, Ingham County, Michigan · Deep GreenBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower24 MW reported; Medium (11-50 MW); 25,000 sq ft; 3 acresProject-scale context · MW type not established · Proposed floor area · Site area
Stillwater Data Center CampusLovejoy, Clayton County, Georgia · StillwaterBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower1250 MW reported; Mega campus (>1,000 MW); 3,465,000 sq ft; 400 acres; expected online 2031Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Project CosmosMarysville, Union County, Ohio · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 55 acresProject-scale context · Site area
ForgeLight Ventures Data CenterMayflower/ Conway, Faulkner County, Arkansas · ForgeLight Ventures, LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 300,000 sq ft; 336 acresProject-scale context · Proposed floor area · Site area
Monitcello Data Center/Project GroundhogMonticello, Wright County, Minnesota · Monticello Tech, LLC, FrattaloneProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 3,000,000 sq ft; 550 acresProject-scale context · Proposed floor area · Site area
Mahoning Township Data CenterNew Castle, Lawrence County, Pennsylvania · StonebridgeProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 569 acresProject-scale context · Site area
Project WestNorwalk, Warren County, Iowa · Tract Data CentersProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 282 acresProject-scale context · Site area
Beltline Energy Data CenterPacific, Franklin County, Missouri · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 500 acresProject-scale context · MW type not established · Site area
Vermaland Data CenterRed Rock, Pinal County, Arizona · Vermaland LLCBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower3000 MW reported; Mega campus (>1,000 MW); 3300 acresProject-scale context · MW type not established · Site area
Apple Research Triangle Park Data CenterResearch Triangle Park, Wake County, North Carolina · AppleBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW)Project-scale context · MW type not established
AgincourtValparaiso, Porter County, Indiana · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 2,400,000 sq ft; 248 acresProject-scale context · MW type not established · Proposed floor area · Site area
Switch Pitt Race Data CenterWampum, Beaver County, Pennsylvania · Switch LTDProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 603,000 sq ft; 382 acresProject-scale context · Proposed floor area · Site area
Digital Power OptimizationWisconsin Rapids, Wood County, Wisconsin · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower20 MW reported; Medium (11-50 MW); 15 acresProject-scale context · MW type not established · Site area
Port Washington campusPort Washington, Wisconsin · Vantage Data Centers / OpenAI / Oracle reportingProposedconfirmedproposalNDAMoneyWaterPower$8B to $15B-scale proposal reported in 2026Project-scale context · Investment context
Frontier Vantage Data CenterAbilene, Shackelford County, Texas · Thor Equities / Form8tionUnder constructionconfirmedunder constructionNDAMoneyWaterPower1400 MW reported; Mega campus (>1,000 MW); 3,700,000 sq ft; 1200 acresProject-scale context · MW type not established · Proposed floor area · Site area
Edged DSM01-1 Data CenterAnkeny, Polk County, Iowa · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower13 MW reported; Medium (11-50 MW); 100,000 sq ft; 17 acresProject-scale context · MW type not established · Proposed floor area · Site area
Trammell Crow Company Data CenterBarnesville, Monroe County, Georgia · CBREUnder constructionconfirmedunder constructionNDAMoneyWaterPowerHyperscale (100-999 MW); 12,000,000 sq ft; 1630 acres; expected online Full buildout by 2037Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Open AI/ SoftBank \Burlington, Milam County, Texas · OpenAI / SB EnergyUnder constructionconfirmedunder constructionNDAMoneyWaterPower1,500 MW reported; initial 1,200 MW data-center site; Mega campus (>1,000 MW); 548,950 sq ft; 595 acresProject-scale context · MW type not established · Proposed floor area · Site area
Switch Pyramid Data CenterCaledonia, Kent County, Michigan · SwitchUnder constructionconfirmedunder constructionNDAMoneyWaterPower320 MW reported; Hyperscale (100-999 MW); 1,800,000 sq ftProject-scale context · MW type not established · Proposed floor area
PAX-1 Data CenterCarlisle, Cumberland County, Pennsylvania · PowerHouse Data Centers / Pennsylvania Data Center PartnersUnder constructionconfirmedunder constructionNDAMoneyWaterPower1350-1800 MW reported; Mega campus (>1,000 MW); 5,000,000 sq ft; 700 acresProject-scale context · MW type not established · Proposed floor area · Site area
Amazon Covington Data CenterCovington, Newton County, Georgia · AmazonUnder constructionconfirmedunder constructionNDAMoneyWaterPowerHyperscale (100-999 MW)Project-scale context · MW type not established
Meta Project SeafoxEl Paso, Texas · Wurldwide LLC/ Meta/ BlackrockUnder constructionconfirmedunder constructionNDAMoneyWaterPower1000 MW reported; Mega campus (>1,000 MW); 25,900,000 sq ft; 600 acres; expected online 2029Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
CyrusOneFairfield, Freestone County, Texas · CyrusOneUnder constructionconfirmedunder constructionNDAMoneyWaterPower380 MW reported; Hyperscale (100-999 MW); 918,650 sq ft; 506 acresProject-scale context · MW type not established · Proposed floor area · Site area
Blueprint ProjectGeorgetown, Williamson County, Texas · Blueprint ProjectUnder constructionconfirmedunder constructionNDAMoneyWaterPower35 MW reported; Medium (11-50 MW); 45,000 sq ft; 20 acres; expected online 2027Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Amazon Hamlet Data CenterHamlet, Richmond County, North Carolina · AmazonUnder constructionconfirmedunder constructionNDAMoneyWaterPowerHyperscale (100-999 MW); 4,000,000 sq ft; 672 acresProject-scale context · MW type not established · Proposed floor area · Site area
Applied Digital: Polaris Forge 2Harwood, Cass County, North Dakota · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower280 MW reported; Hyperscale (100-999 MW); 160 acresProject-scale context · MW type not established · Site area
Hogansville Data CenterHogansville, Troup County, Georgia · Unknown operatorProposedinferredapproval / land-useNDAMoneyWaterPower600 MW reported; Hyperscale (100-999 MW); 437 acresProject-scale context · MW type not established · Site area
PowerHouse Hillwood HoldingJoliet, Will County, Illinois · PowerHouse Hillwood HoldingUnder constructionconfirmedunder constructionNDAMoneyWaterPower1800 MW reported; Mega campus (>1,000 MW); 3,468,000 sq ft; 795 acresProject-scale context · MW type not established · Proposed floor area · Site area
Microsoft LaPorte Data CenterLaPorte, Indiana · MicrosoftUnder constructionconfirmedunder constructionNDAMoneyWaterPowerMega campus (>1,000 MW); 1,000,000 sq ft; 489 acres; expected online 2029Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Project DominoLebanon, Boone County, Indiana · MetaUnder constructionconfirmedunder constructionNDAMoneyWaterPower1000 MW reported; Mega campus (>1,000 MW); 1500 acresProject-scale context · MW type not established · Site area
PowerHouse Data CentersLouisville, Jefferson County, Kentucky · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower130 MW reported; Hyperscale (100-999 MW); 1,800,000 sq ft; 150 acres; expected online 2026Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
NTT Data CenterMesa, Maricopa County, Arizona · NTT Global Data CentersUnder constructionconfirmedunder constructionNDAMoneyWaterPower200 MW reported; Hyperscale (100-999 MW); 173 acresProject-scale context · MW type not established · Site area
AREP PowerHouse Grand PrairieMidlothian, Ellis County, Texas · PowerHouse Data CentersUnder constructionconfirmedunder constructionNDAMoneyWaterPower1800 MW reported; Mega campus (>1,000 MW); 8,500,000 sq ft; 810 acres; expected online 2027Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Niagara Digital CampusNiagara Falls, Niagara County, New York · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower140 MW reported; Hyperscale (100-999 MW); 600,000 sq ft; 53 acresProject-scale context · MW type not established · Proposed floor area · Site area
SoftBank Data Center/PORTS Technology CampusPiketon, Pike County, Ohio · Softbank/Open AI (unconfirmed)Under constructionconfirmedunder constructionNDAMoneyWaterPower9200 MW reported; Mega campus (>1,000 MW); 640 acres; expected online 2028Project-scale context · MW type not established · Site area · Target online date
CleanArc VA1 Data Center CampusRuther Glen, Caroline County, Virginia · CleanArcUnder constructionconfirmedunder constructionNDAMoneyWaterPower300-600 MW reported; Hyperscale (100-999 MW); 650 acres; expected online 2027Project-scale context · MW type not established · Site area · Target online date
River Bend CampusSt. Francisville, East Feliciana County, Louisiana · Hut 8Under constructionconfirmedunder constructionNDAMoneyWaterPower300 MW reported; Hyperscale (100-999 MW); 900,000 sq ft; 592 acres; expected online 2026Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Rowan Digital Infrastructure Data CenterTemple, Bell County, Texas · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower300 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Prime Data CenterTolleson, Maricopa County, Arizona · Prime Data CentersUnder constructionconfirmedunder constructionNDAMoneyWaterPower240 MW reported; Hyperscale (100-999 MW); 1,300,000 sq ft; 66 acresProject-scale context · MW type not established · Proposed floor area · Site area
Google Project PyramidWest Memphis/Proctor, Crittenden County, Arkansas · Google/Groot LLCUnder constructionconfirmedunder constructionNDAMoneyWaterPowerHyperscale (100-999 MW); 920 acresProject-scale context · MW type not established · Site area
Black Pearl Data CenterWink, Winkler County, Texas · Cipher/AmazonUnder constructionconfirmedunder constructionNDAMoneyWaterPower300 MW reported; Hyperscale (100-999 MW); 19,579 sq ft; expected online 2026Project-scale context · MW type not established · Proposed floor area · Target online date
Oppidan Data CenterApple Valley, Dakota County, Michigan · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower250-300 MW reported; Hyperscale (100-999 MW); 1,050,000 sq ft; 134 acresProject-scale context · MW type not established · Proposed floor area · Site area
Athens Studio Data CenterAthens, Clarke County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 185,000 sq ftProject-scale context · Proposed floor area
Maricopa Data CenterBuckeye, Maricopa County, Arizona · FortescueProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 158 acresProject-scale context · Site area
Simple MiningCedar Falls, Black Hawk County, Iowa · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 38 acresProject-scale context · Site area
Project MustangClaremore, Rogers County, Oklahoma · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; expected online 2028Project-scale context · Target online date
Columbia Data CenterColumbia, Boone County, Missouri · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 63 acresProject-scale context · Site area
Karis Data CenterDubuque, Iowa · KarisProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Project HorizonFort Stockton, Pecos County, Texas · Poolside/CoreWeaveBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower2000 MW reported; Mega campus (>1,000 MW); 568 acresProject-scale context · MW type not established · Site area
Cielo Haines City Data CenterHaines City, Polk County, Florida · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower300 MW reported; Hyperscale (100-999 MW); 74 acresProject-scale context · MW type not established · Site area
Hampton Data CenterHampton, Henry County, Georgia · Southeast Property Holdings LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 585,000 sq ftProject-scale context · Proposed floor area
Rocky CreekHampton, Henry County, Georgia · Red Wolf DCD Properties, LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,253,752 sq ftProject-scale context · Proposed floor area
Provident Data CenterHillsboro, Hill County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 300 acresProject-scale context · Site area
Treetop Development ProjectHopewell Junction, Dutchess County, New York · onovan Drive Holdings LLCBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower1000 MW reported; Mega campus (>1,000 MW); 800,000 sq ftProject-scale context · MW type not established · Proposed floor area
Ravel Data CenterIronton, Lawrence County, Ohio · StrataProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Project CornmazeJanesville, Rock County, Wisconsin · Cambrin LLC., Meta?Proposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 430 acresProject-scale context · Site area
Jim Thorpe Data CenterJim Thorpe, Carbon County, Pennsylvania · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 750 acresProject-scale context · Site area
Leesburg GatewayLeesburg, Loudoun County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 600,000 sq ftProject-scale context · Proposed floor area
Spring Valley Technology ParkLEESBURG, Loudoun County, Virginia · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 3,483,902 sq ft; 362 acresProject-scale context · MW type not established · Proposed floor area · Site area
Guernsey County Data CenterLore City, Guernsey County, Ohio · Smart Energy PartnersProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 425 acresProject-scale context · Site area
Amazon Lusby Data CenterLusby, Calvert County, Maryland · AmazonBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower500 MW reported; Hyperscale (100-999 MW); 2,460,000 sq ftProject-scale context · MW type not established · Proposed floor area
Luther Data CenterLuther, Oklahoma County, Oklahoma · Beltline EnergyProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 400 acresProject-scale context · Site area
New York State Artificial Intelligence Data CenterMassena, St. Lawrence County, New York · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower300 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
NorthPoint Data CenterModesto, Stanislaus County, California · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 45 acresProject-scale context · Site area
Monclova Data Center Land AdvertisementMonclova Township, Lucas County, Ohio · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Pacifico Data CenterMuhlenburg, Pickaway County, Ohio · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
DC Blox Data CenterNashville, Davidson County, Tennessee · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 69,220 sq ftProject-scale context · Proposed floor area
Aligned Data CenterPataskala, Licking County, Ohio · Aligned Data CentersProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 90 acresProject-scale context · Site area
Radius Data CenterPlainfield, Hendricks County, Indiana · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 201,000 sq ft; 31 acresProject-scale context · Proposed floor area · Site area
Provo Data CenterProvo, Utah County, Utah · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower5 MW reported; Medium (11-50 MW); 66,000 sq ftProject-scale context · MW type not established · Proposed floor area
Geronimo Power Data CenterReading, Murray County, Minnesota · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPower400-500 MW reported; Hyperscale (100-999 MW); expected online 2030Project-scale context · MW type not established · Target online date
MidAmerican Data CenterSalix, Woodbury County, Iowa · Google (potential)Proposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 900 acresProject-scale context · Site area
Sarcoxie Data CenterSarcoxie, Jasper County, Missouri · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
McKees Rocks Data CenterStowe Township, Allegheny County, Pennsylvania · SunCap Property GroupProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 72 acresProject-scale context · Site area
EdgeConneX Data Center/ Hickman PropertyVilla Rica, Douglas County, Georgia · East Village Donthan LLCBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerHyperscale (100-999 MW); 4,400,000 sq ft; 700 acresProject-scale context · MW type not established · Proposed floor area · Site area
Washington Township Data CenterWashington Township, Macomb County, Michigan · PrologisProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
NE Edge Groton Data CenterWaterford, New London County, Connecticut · Unknown operatorBlocked or pausedconfirmedidentity / status unresolvedNDAMoneyWaterPower1500 MW reported; Mega campus (>1,000 MW); 1,500,000 sq ft; 25 acresProject-scale context · MW type not established · Proposed floor area · Site area
Data Centric LLC Data CenterAllenwood, Union County, Pennsylvania · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 37 acresProject-scale context · Site area
Microsoft Licking County Data CenterColumbus, Franklin County, Ohio · MicrosoftBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknownProject-scale context
Project FloNew Bethel/ Indianapolis, Marion County, Indiana · Deep Meadow Ventures, LLC/GoogleBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 467 acresProject-scale context · Site area
San Marcos Data CenterSan Marcos, Hays County, Texas · Highlander SM One LLCBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 180 acresProject-scale context · Site area
Jeremiah A QTS Data CenterUnion Township, Porter County, Indiana · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 400 acresProject-scale context · Site area
Jeremiah B QTS Data CenterUnion Township, Porter County, Indiana · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 400 acresProject-scale context · Site area
Becker data centerBecker, Minnesota · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerLarge data center proposalProject-scale context
Chesterfield County campusChesterfield County, Virginia · GoogleProposedconfirmedproposalNDAMoneyWaterPowerGoogle-listed campus in developmentProject-scale context
Janesville data center prospectJanesville, Wisconsin · Undisclosed / Microsoft-linked reportingProposedconfirmedproposalNDAMoneyWaterPowerPotential billion-dollar projectProject-scale context
Menomonie data center prospectMenomonie, Wisconsin · UndisclosedProposedconfirmedproposalNDAMoneyWaterPowerPotential large campusProject-scale context
Project SkywayPine Island, Minnesota · GoogleProposedconfirmedutility / powerNDAMoneyWaterPower482-acre industrial projectProject-scale context · Site area
Beloit data center prospectTown of Beloit, Wisconsin · UndisclosedProposedconfirmedproposalNDAMoneyWaterPowerPossible data center developmentProject-scale context
Project Caprock Data CenterAbernathy, Hale County, Texas · AlignedUnder constructionconfirmedunder constructionNDAMoneyWaterPower540 MW reported; Hyperscale (100-999 MW); 1,650,000 sq ft; 313 acres; expected online 2027Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Denver 1 QTS Data CenterAurora, Arapahoe County, Colorado · QTSUnder constructionconfirmedunder constructionNDAMoneyWaterPower160-177 MW reported; Hyperscale (100-999 MW); 65 acresProject-scale context · MW type not established · Site area
Edged Data CenterAurora, DuPage County, Illinois · EdgedUnder constructionconfirmedunder constructionNDAMoneyWaterPower72 MW reported; Large (51-99 MW); expected online 2027Project-scale context · MW type not established · Target online date
Applied Digital Delta Forge 1Boyce, Rapides County, Louisiana · Applied DigitalUnder constructionconfirmedunder constructionNDAMoneyWaterPower430 MW reported; Hyperscale (100-999 MW); 500 acres; expected online 2027Project-scale context · MW type not established · Site area · Target online date
Microsoft Union City Data Center CampusCollege Park, Fulton County, Georgia · MicrosoftUnder constructionconfirmedunder constructionNDAMoneyWaterPower324 MW reported; Hyperscale (100-999 MW); 2,100,000 sq ftProject-scale context · MW type not established · Proposed floor area
DC BLOX Atlanta East Data Center CampusConyers, Rockdale County, Georgia · DC BLOXUnder constructionconfirmedunder constructionNDAMoneyWaterPower216 MW reported; Hyperscale (100-999 MW); 1,016,828 sq ft; 68 acresProject-scale context · MW type not established · Proposed floor area · Site area
MSP1 Data CenterEagan, Dakota County, Minnesota · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower12 MW reported; Medium (11-50 MW)Project-scale context · MW type not established
Wyoming Hyperscale WhiteboxEvanston, Uinta County, Wyoming · Prometheus HyperscaleUnder constructionconfirmedunder constructionNDAMoneyWaterPower1250 MW reported; Mega campus (>1,000 MW); 506 acres; expected online 2030Project-scale context · MW type not established · Site area · Target online date
Aligned IAD-06Frederick, Maryland · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower72 MW reported; Large (51-99 MW); 450,000 sq ft; 75 acresProject-scale context · MW type not established · Proposed floor area · Site area
Oasis Data CenterFredericksburg, King George County, Virginia · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower1200 MW reported; Mega campus (>1,000 MW); 6,800,000 sq ft; 485 acresProject-scale context · MW type not established · Proposed floor area · Site area
Vantage Data CenterGoodyear, Maricopa County, Arizona · Vantage Data CentersUnder constructionconfirmedunder constructionNDAMoneyWaterPower176 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Project SpaldingGriffin, Spalding County, Georgia · Montana Property Group LLCUnder constructionconfirmedunder constructionNDAMoneyWaterPowerHyperscale (100-999 MW); 2,550,000 sq ftProject-scale context · MW type not established · Proposed floor area
EdgeConneX New Albany Data CenterJohnstown, Licking County, Ohio · EdgeConneXUnder constructionconfirmedunder constructionNDAMoneyWaterPower120-766 MW reported; Hyperscale (100-999 MW); 1,225,000 sq ft; 270 acres; expected online 2026Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Project MicahKansas City, Clay County, Missouri · GoogleUnder constructionconfirmedunder constructionNDAMoneyWaterPower700 MW reported; Hyperscale (100-999 MW); 1,560,000 sq ft; 500 acresProject-scale context · MW type not established · Proposed floor area · Site area
STACK Atlanta ATL02Lithia Springs, Douglas County, Georgia · STACK InfrastructureUnder constructionconfirmedunder constructionNDAMoneyWaterPower160 MW reported; Hyperscale (100-999 MW); 300,000 sq ft; 64 acresProject-scale context · MW type not established · Proposed floor area · Site area
CyrusOne Data CenterLombard, DuPage County, Illinois · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower18 MW reported; Medium (11-50 MW); 500,000 sq ftProject-scale context · MW type not established · Proposed floor area
Keel Infrastucture Grant Node Data CenterMoses Lake, Grant County, Washington · Keel InfrastructureUnder constructionconfirmedunder constructionNDAMoneyWaterPower18 MW reported; Medium (11-50 MW); 60,000 sq ft; 6 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project Gladysnear Bishop?, Nueces County, Texas · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower150 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Project Feinear Childress, Childress County, Texas · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower100 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Project Hedynear Lyford, Willacy County, Texas · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower120 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Project Ellennear Rio Hondo, Cameron County, Texas · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower100 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Project Rosanear Santa Rosa, Cameron County, Texas · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower187 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Keel Infrastructure Panther CreekNesquehoning, Carbon County, Pennsylvania · Keel InfrastructureUnder constructionconfirmedunder constructionNDAMoneyWaterPower350 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Google Project ClydesdaleOwasso, Tulsa County, Oklahoma · Beale Infrastructure, GoogleUnder constructionconfirmedunder constructionNDAMoneyWaterPowerHyperscale (100-999 MW); 506 acresProject-scale context · MW type not established · Site area
Project AnnieParis, Lamar County, Texas · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower75 MW reported; Large (51-99 MW)Project-scale context · MW type not established
Menlo Equities MD-VA3 Data CenterPetersburg, Virginia · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower104 MW reported; Hyperscale (100-999 MW); 74 acresProject-scale context · MW type not established · Site area
Tract Phoenix Data CenterPhoenix, Maricopa County, Arizona · Tract Data CentersUnder constructionconfirmedunder constructionNDAMoneyWaterPowerMega campus (>1,000 MW); 2069 acresProject-scale context · MW type not established · Site area
IBM Data CenterPoughkeepsie, Dutchess County, New York · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower100 MW reported; Hyperscale (100-999 MW); 3,600,000 sq ft; 400 acresProject-scale context · MW type not established · Proposed floor area · Site area
CentraReno, Washoe County, Nevada · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower12 MW reported; Medium (11-50 MW)Project-scale context · MW type not established
Oppidan Data CenterReno, Washoe County, Nevada · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower8 MW reported; Small (0-10 MW)Project-scale context · MW type not established
Webb Data CenterReno, Washoe County, Nevada · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower28 MW reported; Medium (11-50 MW); 82,000 sq ftProject-scale context · MW type not established · Proposed floor area
Amazon RidgelandRidgeland, Madison County, Mississippi · AmazonUnder constructionconfirmedunder constructionNDAMoneyWaterPower1000 MW reported; Mega campus (>1,000 MW); expected online 2026Project-scale context · MW type not established · Target online date
Microsoft Alviso Data CenterSan Jose, Santa Clara County, California · MicrosoftUnder constructionconfirmedunder constructionNDAMoneyWaterPower48 MW reported; Medium (11-50 MW); 64 acres; expected online 2028Project-scale context · MW type not established · Site area · Target online date
Project Kati 1 and 2Santa Monica, Willacy County, Texas · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower166 MW reported; Hyperscale (100-999 MW); 50 acresProject-scale context · MW type not established · Site area
Sharon Data CenterSharon, Mercer County, Pennsylvania · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower30 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Project Dorothy 2Silverton, Briscoe County, Texas · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPower48 MW reported; Medium (11-50 MW)Project-scale context · MW type not established
Sweetwater 1 and 2Sweetwater, Fisher County, Texas · IRENUnder constructionconfirmedunder constructionNDAMoneyWaterPower2000 MW reported; Mega campus (>1,000 MW); 500 acres; expected online 2028Project-scale context · MW type not established · Site area · Target online date
Project ComalTaylor, Williamson County, Texas · KDCUnder constructionconfirmedunder constructionNDAMoneyWaterPower360 MW reported; Hyperscale (100-999 MW); 220 acresProject-scale context · MW type not established · Site area
Sabey Data CenterUmatilla, Oregon · SabeyUnder constructionconfirmedunder constructionNDAMoneyWaterPower120 MW reported; Hyperscale (100-999 MW); 60 acres; expected online 2027Project-scale context · MW type not established · Site area · Target online date
Aligned Data Centers Waddell CampusWaddell, Maricopa County, Arizona · Aligned Data CentersUnder constructionconfirmedunder constructionNDAMoneyWaterPowerHyperscale (100-999 MW); 1,000,000 sq ft; 100 acresProject-scale context · MW type not established · Proposed floor area · Site area
Crusoe Data CenterWarrenton, Warren County, Missouri · CrusoeUnder constructionconfirmedunder constructionNDAMoneyWaterPowerHyperscale (100-999 MW); 1,610,000 sq ft; 340 acresProject-scale context · MW type not established · Proposed floor area · Site area
CyrusOne: DFW10Whitney, Bosque County, Texas · CyrusOneUnder constructionconfirmedunder constructionNDAMoneyWaterPower400 MW reported; Hyperscale (100-999 MW); 700,000 sq ft; expected online 2026Project-scale context · MW type not established · Proposed floor area · Target online date
AWS Bridgefield Tech CenterAshburn, Loudoun County, Virginia · AWSProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 800,000 sq ft; 122 acresProject-scale context · MW type not established · Proposed floor area · Site area
QTS SalemBerwick, Luzerne County, Pennsylvania · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 1700 acresProject-scale context · MW type not established · Site area
BHM01 Nebius Data CenterBirmingham, Jefferson County, Alabama · NebiusProposedconfirmedutility / powerNDAMoneyWaterPower300 MW reported; Hyperscale (100-999 MW); 80 acresProject-scale context · MW type not established · Site area
Project RubyBox Springs, Muscogee County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 875 acresProject-scale context · MW type not established · Site area
Project BunkhouseCartersville, Bartow County, Georgia · Gaines Family Land LLCProposedconfirmedapproval / land-useNDAMoneyWaterPower1830 MW reported; Mega campus (>1,000 MW); 8,600,000 sq ftProject-scale context · MW type not established · Proposed floor area
Project IndoCartersville, Bartow County, Georgia · DataBankProposedconfirmedutility / powerNDAMoneyWaterPower200 MW reported; Hyperscale (100-999 MW); 1,000,000 sq ft; 69 acres; expected online 2032Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
EDCAUS11 and EDCAUS12Cedar Creek, Bastrop County, Texas · EdgeConneXProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 1,156,000 sq ft; 180 acresProject-scale context · MW type not established · Proposed floor area · Site area
Related Digital Cheyenne Data CenterCheyenne, Laramie County, Wyoming · Related Digital/CoreWeaveProposedconfirmedutility / powerNDAMoneyWaterPower250 MW reported; Hyperscale (100-999 MW); 113 acresProject-scale context · MW type not established · Site area
Project AgateConover, Catawba County, North Carolina · MicrosoftUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 157 acresProject-scale context · Site area
Project LighthouseCovington, Newton County, Georgia · Universal Planning and Development LLC, JBW Investments, LLC data centerProposedconfirmedutility / powerNDAMoneyWaterPower360 MW reported; Hyperscale (100-999 MW); 1,410,000 sq ft; 213 acres; expected online 2027Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Culpeper Data CenterCulpeper, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower215-432 MW reported; Hyperscale (100-999 MW); 1,400,000 sq ftProject-scale context · MW type not established · Proposed floor area
Equinix: DA12-1 and DA12-2Dallas, Texas · EquinixProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 600,000 sq ft; expected online 2027-28Project-scale context · MW type not established · Proposed floor area · Target online date
Stack Data CenterDanville, Pittsylvania County, Virginia · StackProposedconfirmedutility / powerNDAMoneyWaterPower299 MW reported; Hyperscale (100-999 MW); 2990 acres; expected online 2031Project-scale context · MW type not established · Site area · Target online date
Sabey Data CenterDecatur, Marion County, Indiana · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower250 MW reported; Hyperscale (100-999 MW); 900,000 sq ft; 138 acres; expected online 2028Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Energy Capital PartnersDelta, York County, Pennsylvania · Calpine (Energy Capital Parners)Proposedconfirmedutility / powerNDAMoneyWaterPower828 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Nixxy-Tachyon 9 Data CenterEpping, North Dakota · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower1000 MW reported; Mega campus (>1,000 MW); 620 acres; expected online 2027Project-scale context · MW type not established · Site area · Target online date
QTS Fairfax Data CenterFairfax, Linn County, Iowa · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 300,000 sq ft; 612 acresProject-scale context · Proposed floor area · Site area
Amazon/ Floydada Data CenterFloydada, Floyd County, Texas · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 567,180 sq ft; expected online 2027Project-scale context · MW type not established · Proposed floor area · Target online date
Black Mountain Data CenterFort Worth, Tarrant County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 419 acresProject-scale context · MW type not established · Site area
Cielo Digital InfrastructureGaffney, Cherokee County, South Carolina · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower300 MW reported; Hyperscale (100-999 MW); 1,600,000 sq ftProject-scale context · MW type not established · Proposed floor area
Amazon Sunbury Data CenterGalena, Delaware County, Ohio · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 450,000 sq ftProject-scale context · Proposed floor area
TAC Data Centers: Project CardinalGreat Falls, Cascade County, Montana · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower500-600 MW reported; Hyperscale (100-999 MW); 2,000,000 sq ft; 569 acresProject-scale context · MW type not established · Proposed floor area · Site area
Spalding Investments LLC Data CenterGriffin, Spalding County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 1,420,000 sq ft; 127 acresProject-scale context · MW type not established · Proposed floor area · Site area
CloudHQ Berks 61 Hyperscale CampusHamburg, Berks County, Pennsylvania · CloudHQProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW)Project-scale context · MW type not established
Nexus Data Center: Apex DFW HB1 and HB2Hubbard, Hill County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower600 MW reported; Mega campus (>1,000 MW); 983,000 sq ft; 2900 acres; expected online 2027Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Amazon Jeffersonville Data CenterJeffersonville, Fayette County, Ohio · AmazonProposedconfirmedutility / powerNDAMoneyWaterPower1184 MW reported; Mega campus (>1,000 MW); 590 acresProject-scale context · MW type not established · Site area
Brookfield Data CenterKevil, McCracken County, Kentucky · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower1200 MW reported; Mega campus (>1,000 MW); 750 acres; expected online 2032Project-scale context · MW type not established · Site area · Target online date
Metrobloks/ Lincoln Data CenterLiberty, Clay County, Missouri · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower150 MW reported; Hyperscale (100-999 MW); 568,000 sq ft; 30 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project AtlasMadison, Mississippi · AmazonProposedconfirmedutility / powerNDAMoneyWaterPower1,000 MW reported; Mega campus (>1,000 MW); 1700 acresProject-scale context · MW type not established · Site area
Enovum Data CenterMadison, Rockingham County, North Carolina · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower99-200 MW reported; Hyperscale (100-999 MW); 96 acresProject-scale context · MW type not established · Site area
Project YogaMaiden, Catawba County, North Carolina · MicrosoftUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 113 acresProject-scale context · Site area
Alterra Development Corporation Data CenterMarshall, Calhoun County, Michigan · Alterra DevelopmentProposedconfirmedutility / powerNDAMoneyWaterPowerMega campus (>1,000 MW); 112 acresProject-scale context · MW type not established · Site area
Penzance ManagementMartinsburg, Berkeley County, West Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower600 MW reported; Hyperscale (100-999 MW); 1,900,000 sq ft; 518 acresProject-scale context · MW type not established · Proposed floor area · Site area
Kline Township Data Center CampusMcAdoo/ Kline Twp, Schuylkill County, Pennsylvania · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 2,500,000 sq ft reported by DCD; Amazon project page describes an approximately 380-acre Kline Township campus under reviewProject-scale context · MW type not established · Proposed floor area · Site area
Mesa Amazon Data Center 1Mesa, Maricopa County, Arizona · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 71 acresProject-scale context · MW type not established · Site area
Project Sharka: Google Data CenterMidlothian, Ellis County, Texas · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 288,000 sq ft; expected online 2027Project-scale context · Proposed floor area · Target online date
Province Group @Powhatan Technology ParkMIDLOTHIAN, Powhatan County, Virginia · Province GroupProposedconfirmedapproval / land-useNDAMoneyWaterPower365-2,400 MW reported; Mega campus (>1,000 MW); 2,000,000 sq ft; 180 acresProject-scale context · MW type not established · Proposed floor area · Site area
Vantage Data CenterMillersport, Fairfield County, Ohio · VantageProposedconfirmedutility / powerNDAMoneyWaterPower800 MW reported; Hyperscale (100-999 MW); 500 acresProject-scale context · MW type not established · Site area
Quantum Leap Data Center/ Fisk UniversityNashville, Davidson County, Tennessee · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower30 MW reported; Medium (11-50 MW); 70,000 sq ftProject-scale context · MW type not established · Proposed floor area
Keel Infrastructure AINesquehoning, Carbon County, Pennsylvania · Keel InfrastructureProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 1,260,000 sq ft; expected online 2028Project-scale context · MW type not established · Proposed floor area · Target online date
Project ArrowheadOcilla, Irwin County, Georgia · Unknown operatorProposedconfirmedapproval / land-useNDAMoneyWaterPower1250 MW reported; Mega campus (>1,000 MW); 4,220,000 sq ft; 1066 acres; expected online 2030Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Alcove Development Data CenterOsawatomie, Miami County, Kansas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower50 MW reported; Hyperscale (100-999 MW); 600,000 sq ft; 115 acresProject-scale context · MW type not established · Proposed floor area · Site area
NuVu Data CenterPetersburg, Virginia · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknownProject-scale context
Mountaineer Gigasystem/ Monarch Cloud CampusPoint Pleasant, Mason County, West Virginia · Nscale (acquired American Intelligence & Power; site formerly associated with Fidelis)Proposedconfirmedapproval / land-useNDAMoneyWaterPower2000-8000 MW reported; Mega campus (>1,000 MW); 2250 acres; expected online 2028Project-scale context · MW type not established · Site area · Target online date
Databank: DFW11 and DFW12Red Oak, Ellis County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower480 MW reported; Hyperscale (100-999 MW); 950,000 sq ftProject-scale context · MW type not established · Proposed floor area
Atlas AgroRichland, Benton County, Washington · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 2,500,000 sq ft; 275 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project CamelliaRincon, Effingham County, Georgia · OpenAIProposedconfirmedapproval / land-useNDAMoneyWaterPower3200 MW reported; Mega campus (>1,000 MW); roughly 1,400-acre project site inside 2,600-acre Savannah Gateway Industrial Hub; phased 2028-2032Project-scale context · MW type not established · Site area
AWS Rockfish 1San Antonio, Bexar County, Texas · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 109,600 sq ftProject-scale context · Proposed floor area
AWS Rockfish 3San Antonio, Bexar County, Texas · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 109,600 sq ftProject-scale context · Proposed floor area
TX11: Vantage Data CenterSan Antonio, Bexar County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower32 MW reported; Medium (11-50 MW); 242,667 sq ft; 58 acres; expected online 2026Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Prologis Data CenterSan Jose, Santa Clara County, California · PrologisProposedconfirmedutility / powerNDAMoneyWaterPower99 MW reported; Large (51-99 MW); 516,000 sq ft; 15 acres; expected online 2028Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
CloudBurstSan Marcos, Guadalupe County, Texas · CloudBurstProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 3,000,000 sq ft; 706 acresProject-scale context · MW type not established · Proposed floor area · Site area
AWS Data CenterShreveport, Caddo County, Louisiana · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 313 acresProject-scale context · MW type not established · Site area
Oppidan Data CenterSocorro, El Paso County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower5 MW reported; Small (0-10 MW); 61,555 sq ftProject-scale context · MW type not established · Proposed floor area
NV11–NV14 Data Center CampusSparks, Storey County, Nevada · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower224 MW reported; Hyperscale (100-999 MW); 1,000,000 sq ft; 137 acresProject-scale context · MW type not established · Proposed floor area · Site area
River Bend Data Center CampusSt. Francisville, West Feliciana County, Louisiana · Fluidstack, Anthropic, GoogleProposedconfirmedutility / powerNDAMoneyWaterPower245 MW reported; Hyperscale (100-999 MW); 627 acres; expected online 2027Project-scale context · MW type not established · Site area · Target online date
MSB Global Services Matrix Data CenterSulphur Springs, Hopkins County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower3000 MW reported; Mega campus (>1,000 MW); 1677 acresProject-scale context · MW type not established · Site area
Rowan Data Center AUS02Temple, Bell County, Texas · RowanProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 500,000 sq ftProject-scale context · MW type not established · Proposed floor area
Arizona Land Consulting Co.Tonopah, Maricopa County, Arizona · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower1500 MW reported; Mega campus (>1,000 MW); 2100 acresProject-scale context · MW type not established · Site area
Google Botetourt County Data Center CampusTroutville (Botetourt County), Botetourt County, Virginia · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 900,000 sq ft; 344 acresProject-scale context · MW type not established · Proposed floor area · Site area
Rubix Data CenterWestwood, Boyd County, Kentucky · RubixProposedconfirmedapproval / land-useNDAMoneyWaterPower2000 MW reported; Mega campus (>1,000 MW); 450 acresProject-scale context · MW type not established · Site area
DFW-10 Data CenterWhitney, Bosque County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower190 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Global AIWindsor, Weld County, Colorado · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower24 MW reported; Medium (11-50 MW); 438 acresProject-scale context · MW type not established · Site area
WhiteFiber Data Centers, NC-2 and NC-3Yadkinville, Yadkin County, North Carolina · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower200 MW reported; Hyperscale (100-999 MW); 500,000 sq ft; 120 acresProject-scale context · MW type not established · Proposed floor area · Site area
Brookhaven Logistics CenterYaphank, Suffolk County, New York · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower176 MW reported; Hyperscale (100-999 MW); 549,000 sq ft; 79 acresProject-scale context · MW type not established · Proposed floor area · Site area
Western Hospitality Partners Data CenterBraidwood/ Braceville, Will County, Illinois · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknownProject-scale context
Unnamed Data CenterBrownsville, Cameron County, Texas · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknownProject-scale context
Tesla Dojo SupercomputerBuffalo, Erie County, New York · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknownProject-scale context
Dulles Cloud South Data CenterCatharpin, Prince William County, Virginia · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 43,000,000 sq ft; 1940 acresProject-scale context · Proposed floor area · Site area
Headwaters Site Development LLCCatlett, Fauquier County, Virginia · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknownProject-scale context
Diode Ventures Data CenterCharles City, Virginia · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 515 acresProject-scale context · Site area
Tract Data CenterChester, Chesterfield County, Virginia · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 744 acresProject-scale context · Site area
Microsoft Columbus Data CenterEaton, Franklin County, Ohio · MicrosoftBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknownProject-scale context
Crow Holdings DevelopmentFayetteville, Fayette County, Georgia · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 300,000 sq ft; 37 acresProject-scale context · Proposed floor area · Site area
Penzance Development Data CenterFredericksburg, Virginia · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 2,100,000 sq ftProject-scale context · Proposed floor area
Western Hospitality Partners Data CenterGroveland Twp, Tazewell County, Illinois · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 320 acresProject-scale context · Site area
Vintage PartnersLaveen, Phoenix, Maricopa County, Arizona · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 63 acresProject-scale context · Site area
Cabin Field Road Data CenterLynchburg, Campbell County, Virginia · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 450,000 sq ft; 57 acresProject-scale context · Proposed floor area · Site area
Potomac Technology Park/ Quantico RidgeManassas, Prince William County, Virginia · Plaza Realty Management IncBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 1,600,000 sq ft; 52 acresProject-scale context · Proposed floor area · Site area
Tower Gate ProjectMansfield Twp, Burlington County, New Jersey · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknownProject-scale context
Project AccelerateMatthews, Mecklenburg County, North Carolina · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 123 acresProject-scale context · Site area
Surge Development LLCMcCordsville, Hancock County, Indiana · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknownProject-scale context
AFS Milwaukee Midtown Data CenterMilwaukee, Wisconsin · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 19,000 sq ftProject-scale context · Proposed floor area
North Pekin Data CenterNorth Pekin, Tazewell County, Illinois · North 52Blocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknownProject-scale context
Wagner Urban Logistics LLC Data CenterRichmond, Henrico County, Virginia · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 195 acresProject-scale context · Site area
Verrus Data CenterSalem, Marion County, Oregon · Sidewalk Infrastructure PartnersBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 75 acresProject-scale context · Site area
Colossus Data CenterSpring Hill, Johnson County, Kansas · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 316 acresProject-scale context · Site area
STJ Data CenterSt Joseph, Buchanan County, Missouri · Unknown operatorBlocked or pausedconfirmedblocked / pausedNDAMoneyWaterPowerUnknown; 400 acresProject-scale context · Site area
Applied DigitalAdair, Iowa · QLevr LLCProposedconfirmedutility / powerNDAMoneyWaterPower200 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Project SassyAdairsville, Floyd County, Georgia · Atlas DevelopmentProposedconfirmedutility / powerNDAMoneyWaterPower200 MW reported; Hyperscale (100-999 MW); 2,000,000 sq ftProject-scale context · MW type not established · Proposed floor area
White Oak Technology Park/ Columbia County Data CenterAppling, Columbia County, Georgia · Trammell Crow CompanyProposedconfirmedutility / powerNDAMoneyWaterPowerMega campus (>1,000 MW); 8,076,687 sq ftProject-scale context · MW type not established · Proposed floor area
Avaio Digital PartnersAppomattox, Virginia · Avaio DigitalProposedconfirmedutility / powerNDAMoneyWaterPower300 MW reported; Hyperscale (100-999 MW); 250,000 sq ft; 450 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project ScottArchbald, Lackawanna County, Pennsylvania · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerMega campus (>1,000 MW); 2,592,000 sq ft; 474 acresProject-scale context · MW type not established · Proposed floor area · Site area
AID1 DataBankAshburn, Loudoun County, Virginia · GI TC ASHBURN LLCProposedconfirmedutility / powerNDAMoneyWaterPower70 MW reported; Large (51-99 MW); 355,330 sq ft; 18 acresProject-scale context · MW type not established · Proposed floor area · Site area
Tract Technology CampusAshland, Hanover County, Virginia · VALCO HANOVER COUNTYProposedconfirmedapproval / land-useNDAMoneyWaterPower2400 MW reported; Mega campus (>1,000 MW); 11,000,000 sq ft; 1212 acresProject-scale context · MW type not established · Proposed floor area · Site area
WestDulles Data CenterAshland, Hanover County, Virginia · WestDulles PropertiesProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 3,000,000 sq ft; 230 acresProject-scale context · MW type not established · Proposed floor area · Site area
DataBank ATL4 Data CenterAtlanta, Fulton County, Georgia · DataBankProposedconfirmedutility / powerNDAMoneyWaterPower40 MW reported; Medium (11-50 MW); 212,710 sq ftProject-scale context · MW type not established · Proposed floor area
T5: Project EisenhowerAugusta, Richmond County, Georgia · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 2,150,000 sq ftProject-scale context · Proposed floor area
CleanSpark Data CenterAustin County, Austin County, Texas · CleanSparkProposedconfirmedutility / powerNDAMoneyWaterPower285 MW reported; Hyperscale (100-999 MW); 271 acres; expected online 2027Project-scale context · MW type not established · Site area · Target online date
PowerBridge/LandBridgeBetween Odessa and Pecos, Reeves County, Texas · Unknown operatorProposedconfirmedapproval / land-useNDAMoneyWaterPower2000 MW reported; Mega campus (>1,000 MW); 3400 acresProject-scale context · MW type not established · Site area
Amazon Boardman Data CenterBoardman, Morrow County, Oregon · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 1300 acresProject-scale context · MW type not established · Site area
Project Eagle/ Amazon Data CenterBoling-Iago, Wharton County, Texas · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 1,323,420 sq ft; 2700 acres; expected online 2027Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
CleanSpark Data CenterBrazoria County, Brazoria County, Texas · CleanSparkProposedconfirmedutility / powerNDAMoneyWaterPower300-600 MW reported; Hyperscale (100-999 MW); 44 acresProject-scale context · MW type not established · Site area
Holtec Decommissioning International Data CenterBuchanan, Westchester County, New York · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower200 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Project AnthemCartoosa, Wagoner County, Oklahoma · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 340 acresProject-scale context · Site area
Chesterfield Google Data CenterChester, Chesterfield County, Virginia · GoogleProposedconfirmedutility / powerNDAMoneyWaterPower200 MW reported; Hyperscale (100-999 MW); 856,000 sq ft; 300 acresProject-scale context · MW type not established · Proposed floor area · Site area
Microsoft Cheyenne Data CenterCheyenne, Laramie County, Wyoming · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 3200 acresProject-scale context · MW type not established · Site area
Cielo Digital InfrastructureChisago, Minnesota · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower300 MW reported; Hyperscale (100-999 MW); 157 acresProject-scale context · MW type not established · Site area
DartPoints Data CenterCincinnati, Hamilton County, Ohio · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 15,000 sq ftProject-scale context · Proposed floor area
Cielo Digital InfrastructureClarksville, Montgomery County, Tennessee · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower350 MW reported; Hyperscale (100-999 MW); 107 acresProject-scale context · MW type not established · Site area
Amazon Clinton Data CenterClinton, Hinds County, Mississippi · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 730,000 sq ft; 99 acresProject-scale context · MW type not established · Proposed floor area · Site area
Rockdale Technology Park 1 Data CenterConyers, Rockdale County, Georgia · SDP Aquisitions LLCProposedconfirmedutility / powerNDAMoneyWaterPower126 MW reported; Hyperscale (100-999 MW); 837,500 sq ftProject-scale context · MW type not established · Proposed floor area
Edged Data CenterCouncil Bluffs, Pottawattamie County, Iowa · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower200 MW reported; Hyperscale (100-999 MW); 570,000 sq ftProject-scale context · MW type not established · Proposed floor area
Stemmons Corridor data campusDallas, Texas · CleanArcProposedconfirmedutility / powerNDAMoneyWaterPower70-245 MW reported; Hyperscale (100-999 MW); 40 acres; expected online 2027Project-scale context · MW type not established · Site area · Target online date
Dalton 3Dalton, Whitfield County, Georgia · Core ScientificProposedconfirmedutility / powerNDAMoneyWaterPower142 MW reported; Hyperscale (100-999 MW); 87,000 sq ftProject-scale context · MW type not established · Proposed floor area
BluSky AIDelta, Millard County, Utah · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower50 MW reported; Medium (11-50 MW); 25 acresProject-scale context · MW type not established · Site area
Fibernet MercuryDelta Campus/Delta GigasiteDelta, Millard County, Utah · Fibernet MercuryDeltaProposedconfirmedapproval / land-useNDAMoneyWaterPower2000-10000 MW reported; Mega campus (>1,000 MW); 20,000,000 sq ft; 1200 acresProject-scale context · MW type not established · Proposed floor area · Site area
Cielo Digital InfrastructureDes Moines, Polk County, Iowa · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower150 MW reported; Hyperscale (100-999 MW); 166 acresProject-scale context · MW type not established · Site area
Project PilotDeSoto, Johnson County, Kansas · Beale InfrastructureUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 290 acres; expected online 2027Project-scale context · Site area · Target online date
MRPDuncannon, Perry County, Pennsylvania · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 1,380,000 sq ftProject-scale context · MW type not established · Proposed floor area
Texas Critical Data CentersEctor County, Ector County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower250-1,000 MW reported; Mega campus (>1,000 MW); 235 acresProject-scale context · MW type not established · Site area
Clayton Commerce IIIEllenwood, Clayton County, Georgia · TA Realty/ EdgeconneXProposedconfirmedutility / powerNDAMoneyWaterPower180 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Flint Hills Digital CampusEmporia, Lyon County, Kansas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower1000 MW reported; Mega campus (>1,000 MW)Project-scale context · MW type not established
Hog Lick AggregatesFairmont, Marion County, West Virginia · Hog Lick AggregatesProposedconfirmedutility / powerNDAMoneyWaterPower200 MW reported; Hyperscale (100-999 MW); 3,220,000 sq ft; 277 acresProject-scale context · MW type not established · Proposed floor area · Site area
Crane Data CentersForest Grove, Washington County, Oregon · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 357,500 sq ft; 35 acresProject-scale context · Proposed floor area · Site area
Amazon Data Services: Carter's Store Tech CampusFredericksburg, Spotsylvania County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 2,600,000 sq ft; 315 acres; expected online 2035Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Amazon Data Services: Cosner Tech CampusFredericksburg, Spotsylvania County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 1,900,000 sq ft; 329 acresProject-scale context · MW type not established · Proposed floor area · Site area
Amazon Summit Crossing Data CenterFredericksburg, Spotsylvania County, Virginia · AmazonUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 2,100,000 sq ft; 231 acres; expected online 2026Project-scale context · Proposed floor area · Site area · Target online date
Hunters Ridge LLC Data CenterFredericksburg, Spotsylvania County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 300,000 sq ft; 127 acresProject-scale context · MW type not established · Proposed floor area · Site area
Hunters Ridge South Data Center (Amazon Data Services)Fredericksburg, Spotsylvania County, Virginia · AmazonUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 2,200,000 sq ftProject-scale context · Proposed floor area
Lone Star ProjectGlasscock County, Glasscock County, Texas · PaceProposedconfirmedutility / powerNDAMoneyWaterPower100 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Eagle Rock Partners LLC and Thomas & Hutton Engineering Data CenterGordon, Jones County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 1,800,000 sq ft; 634 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project SaltworksGraham, Young County, Texas · StreamProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 867 acresProject-scale context · MW type not established · Site area
DC Blox: High PointGreensboro, Guilford County, North Carolina · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower10 MW reported; Small (0-10 MW); 54,000 sq ftProject-scale context · MW type not established · Proposed floor area
75 South Data Center CampusGriffin, Spalding County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 2,200,000 sq ft; 291 acresProject-scale context · MW type not established · Proposed floor area · Site area
Wallace Jackson Data Center CampusGriffin, Spalding County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerMega campus (>1,000 MW); 4,986,000 sq ft; 190 acresProject-scale context · MW type not established · Proposed floor area · Site area
AWS Data CenterHamilton, Butler County, Ohio · AWSProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 3,960,000 sq ft; 601 acresProject-scale context · MW type not established · Proposed floor area · Site area
CoreWeaveHammond, Lake County, Indiana · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower180 MW reported; Hyperscale (100-999 MW); 450,000 sq ftProject-scale context · MW type not established · Proposed floor area
Hexa Data CenterHammonton, Atlantic County, New Jersey · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 1,000,000 sq ftProject-scale context · MW type not established · Proposed floor area
Mara HoldingsHannibal, Monroe County, Ohio · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower200 MW reported; Hyperscale (100-999 MW); 1600 acres; expected online 2027Project-scale context · MW type not established · Site area · Target online date
TeraWulf Data CenterHawesville, Hancock County, Kentucky · TeraWulfProposedconfirmedutility / powerNDAMoneyWaterPower480 MW reported; Hyperscale (100-999 MW); 250 acresProject-scale context · MW type not established · Site area
Stack Infrastructure POR01 and POR02Hillsboro, Washington County, Oregon · StackProposedconfirmedutility / powerNDAMoneyWaterPower108 MW reported; Hyperscale (100-999 MW)Project-scale context · MW type not established
Hopewell Data CenterHopewell, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower20 MW reported; Medium (11-50 MW); 70,000 sq ftProject-scale context · MW type not established · Proposed floor area
Cielo Hudson Data CenterHudson, Weld County, Colorado · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower750 MW reported; Hyperscale (100-999 MW); 500 acresProject-scale context · MW type not established · Site area
Alpha Technologies Data CenterHuntington, Cabell County, West Virginia · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 60,000 sq ftProject-scale context · Proposed floor area
Buena Vista Biomass Power site Data CenterIone, Amador County, California · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower41 MW reported; Medium (11-50 MW)Project-scale context · MW type not established
Powerhouse Data CenterIrving, Dallas County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower201 MW reported; Hyperscale (100-999 MW); 946,000 sq ft; 50 acresProject-scale context · MW type not established · Proposed floor area · Site area
Breaker Street Associates LLC Data CenterJessup, Lackawanna County, Pennsylvania · Breaker Street Associates LLCProposedconfirmedutility / powerNDAMoneyWaterPower600 MW reported; Hyperscale (100-999 MW); 1,100,000 sq ft; 131 acresProject-scale context · MW type not established · Proposed floor area · Site area
Harbor Farmz Data CenterKalamazoo, Michigan · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower1 MW reported; Small (0-10 MW)Project-scale context · MW type not established
Cielo Digital InfrastructureKansas City, Jackson County, Missouri · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower500 MW reported; Hyperscale (100-999 MW); 146 acresProject-scale context · MW type not established · Site area
QTS Kearneysville Data CenterKearneysville, Berkeley / Jefferson County, West Virginia · QTS Data CentersProposedconfirmedapproval / land-useNDAMoneyWaterPower202 MW reported; Hyperscale (100-999 MW); 1,143,188 sq ft; 300-308 acres; first phase on 90 acresProject-scale context · MW type not established · Proposed floor area · Site area
Project WestLaGrange, Troup County, Georgia · Economic Impact Group LLCProposedconfirmedutility / powerNDAMoneyWaterPower600 MW reported; Hyperscale (100-999 MW); 1,500,000 sq ftProject-scale context · MW type not established · Proposed floor area
Digital Bridge Data CenterLancaster, Dallas County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower550 MW reported; Hyperscale (100-999 MW); 163 acresProject-scale context · MW type not established · Site area
Project OrangerLancaster, Dallas County, Texas · Unknown operatorProposedconfirmedapproval / land-useNDAMoneyWaterPower252 MW reported; Hyperscale (100-999 MW); 1,500,000 sq ft; 116 acresProject-scale context · MW type not established · Proposed floor area · Site area
New Era Energy & Digital Data CenterLea County, New Mexico · New Era Energy & DigitalProposedconfirmedapproval / land-useNDAMoneyWaterPower7000 MW reported; Mega campus (>1,000 MW); 3500 acres; expected online 2028Project-scale context · MW type not established · Site area · Target online date
COL 5 (Cologix) Data CenterLewis Center, Delaware County, Ohio · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower25 MW reported; Medium (11-50 MW); 60,000 sq ftProject-scale context · MW type not established · Proposed floor area
BaRupOn Data CenterLiberty, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower240 MW reported; Mega campus (>1,000 MW); 4,500,000 sq ft; 701 acresProject-scale context · MW type not established · Proposed floor area · Site area
Loring Commerce Center Data centerLimestone, Aroostook County, Maine · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower6 MW reported; Medium (11-50 MW)Project-scale context · MW type not established
Google Lincoln Data CenterLincoln, Lancaster County, Nebraska · GoogleUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 2,000,000 sq ft; 600 acresProject-scale context · Proposed floor area · Site area
Data Bank ATL5 Data CenterLitha Springs, Fulton County, Georgia · DataBankProposedconfirmedutility / powerNDAMoneyWaterPower72 MW reported; Large (51-99 MW); 240,000 sq ftProject-scale context · MW type not established · Proposed floor area
Tract Data CentersLockhart, Caldwell County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower360-1600 MW reported; Mega campus (>1,000 MW); 3000 acres; expected online 2028Project-scale context · MW type not established · Site area · Target online date
Lower Peninsula Data CenterLower Peninsula, Isabella County, Michigan · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower1000 MW reported; Mega campus (>1,000 MW)Project-scale context · MW type not established
HyperDataGrid Data CenterLufkin, Angelina County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower20 MW reported; Medium (11-50 MW); 40 acres; expected online 2027Project-scale context · MW type not established · Site area · Target online date
Project LufKin: Amp Z Data CenterLufkin, Angelina County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower175-2100 MW reported; Mega campus (>1,000 MW); 1041 acres; expected online 2026Project-scale context · MW type not established · Site area · Target online date
North East Data Center LLCLytle, Medina County, Texas · RowanProposedconfirmedutility / powerNDAMoneyWaterPower300 MW reported; Hyperscale (100-999 MW); 440 acres; expected online 20027Project-scale context · MW type not established · Site area · Target online date
NVA15 LLCManassas, Prince William County, Virginia · STACK INFRASTRUCTUREProposedconfirmedutility / powerNDAMoneyWaterPower48 MW reported; Medium (11-50 MW); 24,000 sq ft; 32 acresProject-scale context · MW type not established · Proposed floor area · Site area
NVA16 LLCManassas, Prince William County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPower48 MW reported; Medium (11-50 MW); 24,000 sq ft; 31 acresProject-scale context · MW type not established · Proposed floor area · Site area
Bitdeer Technologies Data CenterMantua, Portage County, Ohio · BitdeerProposedconfirmedutility / powerNDAMoneyWaterPower150 MW reported; Hyperscale (100-999 MW); 720,000 sq ftProject-scale context · MW type not established · Proposed floor area
GrindcapMarietta, Cobb County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower108 MW reported; Hyperscale (100-999 MW); 31 acresProject-scale context · MW type not established · Site area
Marietta Data CenterMarietta, Cobb County, Georgia · MMM Acquisitions LLC/GrindcapProposedconfirmedutility / powerNDAMoneyWaterPower180 MW reported; Hyperscale (100-999 MW); 347,200 sq ft; 31 acresProject-scale context · MW type not established · Proposed floor area · Site area
Prime Storage Data CenterMarietta, Cobb County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower18 MW reported; Medium (11-50 MW); 37,000 sq ft; 11 acresProject-scale context · MW type not established · Proposed floor area · Site area
Legacy Data CenterMarion, Guadalupe County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower50 MW reported; Large (51-99 MW); 100,000 sq ft; 39 acres; expected online 2027Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Kahla ProjectMarquez, Leon County, Texas · Belltown PowerProposedconfirmedutility / powerNDAMoneyWaterPower1500 MW reported; Mega campus (>1,000 MW); 900 acresProject-scale context · MW type not established · Site area
Swarm Systems Data CenterMarshfield, Webster County, Missouri · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower20 MW reported; Medium (11-50 MW); expected online 2027Project-scale context · MW type not established · Target online date
St Lawrence Data and Agricultural CenterMassena, St. Lawrence County, New York · Petawatt HoldingsProposedconfirmedutility / powerNDAMoneyWaterPower200 MW reported; Hyperscale (100-999 MW); 14 acresProject-scale context · MW type not established · Site area
Matagorda County Data CentersMatagora County, Matagorda County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower20 MW reported; Medium (11-50 MW)Project-scale context · MW type not established
Fortune 500Maysville, Mason County, Kentucky · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower400 MW reported; Hyperscale (100-999 MW); 2000 acresProject-scale context · MW type not established · Site area
Galaxy Digital Data CenterMcGregor, McLennan County, Texas · Galaxy DigitalProposedconfirmedutility / powerNDAMoneyWaterPower75 MW reported; Large (51-99 MW); expected online 2028Project-scale context · MW type not established · Target online date
Hixson Data CenterMcMinnville, Warren County, Tennessee · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerFuel cells25 MW reported; Medium (11-50 MW); 96,065 sq ftProject-scale context · MW type not established · Proposed floor area
Cielo Digital InfrastructureMinooka, Grundy County, Illinois · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower500 MW reported; Hyperscale (100-999 MW); 159 acresProject-scale context · MW type not established · Site area
KrambuMissoula, Montana · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower10 MW reported; Small (0-10 MW)Project-scale context · MW type not established
Jet.AIMoapa, Clark County, Nevada · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower50 MW reported; Medium (11-50 MW); 20 acresProject-scale context · MW type not established · Site area
NETL’s Computational Science & Engineering CenterMorgantown, Monongalia County, West Virginia · National Energy Technology LaboratoryUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 50 acresProject-scale context · Site area
Tract Morris Data CenterMorris, Grundy County, Illinois · Tract Data CentersProposedconfirmedutility / powerNDAMoneyWaterPower1,000 MW reported; Mega campus (>1,000 MW); 2,900,000 sq ft; 343 acres; expected online 2028Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Amazon Falls Township Data CenterMorrisville, Bucks County, Pennsylvania · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW)Project-scale context · MW type not established
Slate Belt Data CentersMount Bethel, Northampton County, Pennsylvania · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 4,634,500 sq ft; 754 acresProject-scale context · MW type not established · Proposed floor area · Site area
Muncy Data CenterMuncy, Lycoming County, Pennsylvania · Danko Holdings II LP and Fishlips LLCUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 72 acresProject-scale context · Site area
Cielo Digital InfrastructureMustang Ridge, Travis County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower500 MW reported; Hyperscale (100-999 MW); 472 acresProject-scale context · MW type not established · Site area
Mudiita Infra Data Centernear Old Forge (Ransom Township), Lackawanna County, Pennsylvania · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower750 MW reported; Hyperscale (100-999 MW); 1460 acresProject-scale context · MW type not established · Site area
Project Big PineNew Boston, Bowie County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower300 MW reported; Hyperscale (100-999 MW); 450 acres; expected online 2032Project-scale context · MW type not established · Site area · Target online date
CloudBurst Data CenterNew Braunfels, Hays County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower1200 MW reported; Mega campus (>1,000 MW); 96 acresProject-scale context · MW type not established · Site area
Cielo Digital InfrastructureNew Lenox, Will County, Illinois · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower350 MW reported; Hyperscale (100-999 MW); 141 acresProject-scale context · MW type not established · Site area
TeraWulf Data CenterNewburg, Charles County, Maryland · TeraWulfProposedconfirmedutility / powerNDAMoneyWaterPower500-1,000 MW reported; Hyperscale (100-999 MW); 250 acresProject-scale context · MW type not established · Site area
9Lives Data CenterNiagara Falls, Erie County, New York · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower600 MW reported; Hyperscale (100-999 MW); 11 acresProject-scale context · MW type not established · Site area
Stak Energy Data CenterNorth Slope Borough, North Slope County, Alaska · StakProposedconfirmedutility / powerNDAMoneyWaterPower3000 MW reported; Mega campus (>1,000 MW); 715 acres; expected online 2028Project-scale context · MW type not established · Site area · Target online date
Project Rise 1A and Project Rise 2AOklaunion, Wilbarger County, Texas · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 1,982,000 sq ftProject-scale context · MW type not established · Proposed floor area
HyperDataGrid Data CenterParsons, Labette County, Kansas · HyperDataGridProposedconfirmedutility / powerNDAMoneyWaterPower20 MW reported; Medium (11-50 MW); 20 acresProject-scale context · MW type not established · Site area
GW Ranch Data Center CampusPecos County, Pecos County, Texas · AmazonProposedconfirmedapproval / land-useNDAMoneyWaterPower5,000 MW reported; Mega campus (>1,000 MW); 8000 acresProject-scale context · MW type not established · Site area
Core ScientificPecos, Reeves County, Texas · Core ScientificProposedconfirmedutility / powerNDAMoneyWaterPower300 MW reported; Mega campus (>1,000 MW); 200 acresProject-scale context · MW type not established · Site area
J5 LLC Data CenterPiqua, Miami County, Ohio · CleanviewProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 700,000 sq ft; 607 acres; expected online 2030Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Pottstown Data CenterPottstown, Chester County, Pennsylvania · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 2,250,000 sq ftProject-scale context · MW type not established · Proposed floor area
PRSM Data CenterPreble County, Ohio · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 300 acresProject-scale context · MW type not established · Site area
Core ScientificQuinlan, Hunt County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower285 MW reported; Hyperscale (100-999 MW); 265 acres; expected online 2027Project-scale context · MW type not established · Site area · Target online date
American Tower Edge Data CenterRaleigh, Wake County, North Carolina · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower4 MW reported; Small (0-10 MW)Project-scale context · MW type not established
Sequitor Edge Data CenterRapid City, Pennington County, South Dakota · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower2-15 MW reported; Medium (11-50 MW); 30,000 sq ft; 10 acresProject-scale context · MW type not established · Proposed floor area · Site area
Remington Technology ParkRemington, Fauquier County, Virginia · REMINGTON TECHNOLOGY PARK LTD PTNRSHPProposedconfirmedutility / powerNDAMoneyWaterPower300 MW reported; Hyperscale (100-999 MW); 1,700,000 sq ft; 234 acresProject-scale context · MW type not established · Proposed floor area · Site area
AzaleaRichmond, Henrico County, Virginia · BWS EnterprisesProposedconfirmedutility / powerNDAMoneyWaterPower10 MW reported; Small (0-10 MW); 456,108 sq ft; 31 acresProject-scale context · MW type not established · Proposed floor area · Site area
DC Blox: Camp HallRidgeville, Berkeley County, South Carolina · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower45 MW reported; Medium (11-50 MW); 200,000 sq ft; 28 acresProject-scale context · MW type not established · Proposed floor area · Site area
Cipher Data CenterRiesel, McLennan County, Texas · CipherProposedconfirmedutility / powerNDAMoneyWaterPower500 MW reported; Hyperscale (100-999 MW); expected online 2028Project-scale context · MW type not established · Target online date
Beacon Point Data CenterRobstown, Nueces County, Texas · Hut 8Proposedconfirmedutility / powerNDAMoneyWaterPower704 MW reported; Hyperscale (100-999 MW); 525 acres; expected online 2027Project-scale context · MW type not established · Site area · Target online date
Oakland University Data CenterRochester, Oakland County, Michigan · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower26 MW reported; Medium (11-50 MW)Project-scale context · MW type not established
Google Data Center: Summit View Business Park \Rocky Mount, Franklin County, Virginia · CrusoeProposedconfirmedutility / powerNDAMoneyWaterPower50-100 MW reported; Hyperscale (100-999 MW); 150 acresProject-scale context · MW type not established · Site area
Project SassyRome, Floyd County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower504 MW reported; Hyperscale (100-999 MW); 2,490,000 sq ftProject-scale context · MW type not established · Proposed floor area
Zenith Volts Data CenterRoswell, Chaves County, New Mexico · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower1240 MW reported; Hyperscale (100-999 MW); 300 acresProject-scale context · MW type not established · Site area
Person County Mega SiteRoxboro, Person County, North Carolina · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 1350 acresProject-scale context · MW type not established · Site area
VALCO Data Center ParkRuther Glen, Caroline County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 2,500,000 sq ft; 855 acresProject-scale context · MW type not established · Proposed floor area · Site area
Skybox Data CenterSan Angelo, Tom Green County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 1,488,000 sq ft; 350 acresProject-scale context · MW type not established · Proposed floor area · Site area
CloudHQ SAT CampusSan Antonio, Bexar County, Texas · CloudHQProposedconfirmedutility / powerNDAMoneyWaterPower84-600 MW reported; Hyperscale (100-999 MW); 3,023,300 sq ftProject-scale context · MW type not established · Proposed floor area
TX12: Vantage Data CenterSan Antonio, Medina County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower96 MW reported; Large (51-99 MW); 432,800 sq ft; expected online 2027Project-scale context · MW type not established · Proposed floor area · Target online date
Prologis Data CenterSan Jose, Santa Clara County, California · PrologisProposedconfirmedutility / powerNDAMoneyWaterPower396 MW reported; Hyperscale (100-999 MW); 1,684,000 sq ft; 159 acresProject-scale context · MW type not established · Proposed floor area · Site area
Summit Ridge Data CenterSantaquin, Utah County, Utah · Data Center Power CompanyProposedconfirmedutility / powerNDAMoneyWaterPower20 MW reported; Medium (11-50 MW)Project-scale context · MW type not established
Digital Realty Data CenterSeattle, King County, Washington · Digital RealtyProposedconfirmedutility / powerNDAMoneyWaterPowerSmall (0-10 MW); 58,000 sq ftProject-scale context · MW type not established · Proposed floor area
Starbucks Data CenterSeattle, King County, Washington · StarbucksProposedconfirmedutility / powerNDAMoneyWaterPower20 MW reported; Medium (11-50 MW); 20,000 sq ftProject-scale context · MW type not established · Proposed floor area
Tract Data CenterSilver Springs, Lyon County, Nevada · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower1600 MW reported; Mega campus (>1,000 MW); 1060 acresProject-scale context · MW type not established · Site area
Tract Data CenterSilver Springs, Storey County, Nevada · FleetProposedconfirmedapproval / land-useNDAMoneyWaterPower1200 MW reported; Mega campus (>1,000 MW); 1500 acresProject-scale context · MW type not established · Site area
Microsoft South Hill CampusSouth Hill, Mecklenburg County, Virginia · MicrosoftUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknownProject-scale context
Peru Ridge/ Peru Shelf Data CentersSparks, Storey County, Nevada · Tract/ FleetProposedconfirmedutility / powerNDAMoneyWaterPower810-2000 MW reported; Mega campus (>1,000 MW); 517 acresProject-scale context · MW type not established · Site area
South Valley Technology Park Data CenterSparks, Storey County, Nevada · TractProposedconfirmedutility / powerNDAMoneyWaterPower1200 MW reported; Mega campus (>1,000 MW); 1500 acresProject-scale context · MW type not established · Site area
SpotsyTech CampusSpotsylvania Courthouse, Spotsylvania County, Virginia · Unknown operatorProposedconfirmedapproval / land-useNDAMoneyWaterPower800 MW reported; Hyperscale (100-999 MW); 2,900,000 sq ft; 315 acres; expected online 2030Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Stack Data CenterStafford, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower1100 MW reported; Mega campus (>1,000 MW); 500 acresProject-scale context · MW type not established · Site area
Stafford Technology CampusStafford, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower1,000 MW reported; Mega campus (>1,000 MW); 5,500,000 sq ft; 524 acresProject-scale context · MW type not established · Proposed floor area · Site area
Starkville Crypto MineStarkville, Oktibbeha County, Mississippi · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower30 MW reported; Medium (11-50 MW)Project-scale context · MW type not established
Menlo Equities Data CentereSunnyvale, Santa Clara County, California · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower49 MW reported; Medium (11-50 MW); 244,215 sq ft; 9 acresProject-scale context · MW type not established · Proposed floor area · Site area
Polmer Data CenterTemple, Bell County, Texas · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknownProject-scale context
Project AzaleaThomson, McDuffie County, Georgia · Unknown operatorUnder constructionconfirmedunder constructionNDAMoneyWaterPowerUnknown; 200 acres; expected online 2029Project-scale context · Site area · Target online date
Beacon Data CenterTupman, Kern County, California · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower275 MW reported; Hyperscale (100-999 MW); 400,000 sq ft; 100 acresProject-scale context · MW type not established · Proposed floor area · Site area
PowerHouse Data CentersUhland, Caldwell County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 500 acresProject-scale context · MW type not established · Site area
ATL03/Red OakUnion City, Fulton County, Georgia · TA Realty LLC, Brightstar Commercial Properties LLCProposedconfirmedutility / powerNDAMoneyWaterPower150 MW reported; Hyperscale (100-999 MW); 1,000,000 sq ftProject-scale context · MW type not established · Proposed floor area
Digital Data CenterVernon, Los Angeles County, California · California Digital RealtyProposedconfirmedutility / powerNDAMoneyWaterPower32 MW reported; Medium (11-50 MW); 253,200 sq ft; 5 acresProject-scale context · MW type not established · Proposed floor area · Site area
Crusoe/ Blue Energy Data CenterVictoria, Texas · CrusoeProposedconfirmedutility / powerNDAMoneyWaterPower1500 MW reported; Mega campus (>1,000 MW); 1600 acres; expected online 2028Project-scale context · MW type not established · Site area · Target online date
Servistar Data CenterWestfield, Hampden County, Massachusetts · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower300 MW reported; Hyperscale (100-999 MW); 2,700,000 sq ft; 156 acresProject-scale context · MW type not established · Proposed floor area · Site area
Stokes Data CenterWheeling, Ohio County, West Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower100 MW reported; Hyperscale (100-999 MW); 60,000 sq ft; 15 acres; expected online 2026Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Amazon Web Services (AWS) Mattameade Tech CampusWoodford, Spotsylvania County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerHyperscale (100-999 MW); 4,500,000 sq ft; 920 acresProject-scale context · MW type not established · Proposed floor area · Site area
Security Land and Development LLC Data CenterWoodlawn, Baltimore County, Maryland · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower150 MW reported; Hyperscale (100-999 MW); 42 acresProject-scale context · MW type not established · Site area
Quantica Data CenterYellowstone County, Yellowstone County, Montana · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPower500-1,000 MW reported; Mega campus (>1,000 MW)Project-scale context · MW type not established
Project JGK (same project as Columbia County Data Center?)Appling, Columbia County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 8,000,000 sq ft; 2000 acresProject-scale context · Proposed floor area · Site area
Arlington Data CenterArlington, Gilliam County, Oregon · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 400 acresProject-scale context · Site area
Microsoft: Project FultonAtlanta, Fulton County, Georgia · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 250,000 sq ft; 125 acresProject-scale context · Proposed floor area · Site area
Barnesville Amazon Data CenterBarnesville, Lamar County, Georgia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 985 acresProject-scale context · Site area
AWS Data CenterBoling, Wharton County, Texas · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 756,000 sq ft; 2700 acres; expected online 2027Project-scale context · Proposed floor area · Site area · Target online date
PowerHouse Data CentersCarollton, Carroll County, Kentucky · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 550 acresProject-scale context · Site area
CyrusOne Data CenterCastroville, Medina County, Texas · CyrusOneProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 460,000 sq ft; expected online 2027Project-scale context · Proposed floor area · Target online date
Cedar Rapids Google Data CenterCedar Rapids, Linn County, Iowa · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Project SpliceCordele, Crisp County, Georgia · Red Wolf DCDProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,100,000 sq ftProject-scale context · Proposed floor area
Karis Critical Data CenterCrown Point, Lake County, Indiana · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 181 acresProject-scale context · Site area
Mount Sunflower Properties LLC Data CenterDeSoto, Johnson County, Kansas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,000,000 sq ftProject-scale context · Proposed floor area
NOAA Environmental Security Computing CenterFairmont, Marion County, West Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; expected online 2026Project-scale context · Target online date
Fairview Crossroads Data CenterFairview Township, York County, Pennsylvania · Fairview Crossroads LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 750,000 sq ft; 82 acresProject-scale context · Proposed floor area · Site area
Data centerFalls Church, Fairfax County, Virginia · Black Chamber Partners, LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 38 acresProject-scale context · Site area
Rumble Technology CampusForsyth, Monroe County, Georgia · Google/Cloverleaf InfrastructureProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 4,200,000 sq ft; 900 acresProject-scale context · Proposed floor area · Site area
Edged Energy Outpost Data CenterFort Worth, Tarrant County, Texas · EdgedProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 488,770 sq ft; 186 acres; expected online 2027Project-scale context · Proposed floor area · Site area · Target online date
Project RedlineHancock County, Hancock County, Indiana · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Harrisburg Data CenterHarrisburg, Dauphin County, Pennsylvania · Provident Realty (Harrisburg I, LLC)Proposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 250 acresProject-scale context · Site area
Journey 1A and 2A Data CentersHaskell, Texas · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 495,700 sq ft; expected online 2026Project-scale context · Proposed floor area · Target online date
Patmos Data CenterIndependence, Jackson County, Missouri · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Project KestrelKansas City, Platte County, Missouri · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,800,000 sq ft; 810 acresProject-scale context · Proposed floor area · Site area
Lamar County Amazon Data CenterLamar County, Lamar County, Georgia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 19,000,000 sq ft; 985 acresProject-scale context · Proposed floor area · Site area
Novva Data Center (site 2)Las Vegas, Clark County, Nevada · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 205 acresProject-scale context · Site area
Metrobloks data centerLiberty, Clay County, Missouri · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 568,800 sq ft; 29 acresProject-scale context · Proposed floor area · Site area
Bistrozzi LLC Data CenterLima, Allen County, Ohio · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 200 acresProject-scale context · Site area
Project BOSCLima, Allen County, Ohio · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; expected online 2030Project-scale context · Target online date
Edged AustinMaxwell, Caldwell County, Texas · EdgedProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 869,685 sq ft; expected online 2028Project-scale context · Proposed floor area · Target online date
Prime DC AUS01 and AUS02Maxwell, Caldwell County, Texas · Prime DCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 380,000 sq ft; expected online 2027Project-scale context · Proposed floor area · Target online date
Project MerlinMcGregor, McLennan County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 500 acresProject-scale context · Site area
Province Group Data CenterMerrillville, Lake County, Indiana · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,000,000 sq ftProject-scale context · Proposed floor area
Mesa Amazon Data Center 2Mesa, Maricopa County, Arizona · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 43 acresProject-scale context · Site area
Project Pumpkin 2AMiami, Roberts County, Texas · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 761,000 sq ft; expected online 2027Project-scale context · Proposed floor area · Target online date
Project MaizeMichigan City, LaPorte County, Indiana · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
MIlan County Data CenterMilam County, Milam County, Texas · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Newton Data CenterNewton, Catawba County, North Carolina · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 160 acresProject-scale context · Site area
AWSPasadena, Los Angeles County, California · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 168,000 sq ftProject-scale context · Proposed floor area
Project Firecracker (Microsoft)Rome, Floyd County, Georgia · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 350 acresProject-scale context · Site area
BT Gateway Data CenterRoyse City, Hunt County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 100,000 sq ft; expected online 2027Project-scale context · Proposed floor area · Target online date
LBT Investment Group LLC Data CenterSugarloaf, Luzerne County, Pennsylvania · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,200,000 sq ft; 185 acresProject-scale context · Proposed floor area · Site area
Project SteamboatVicksburg, Warren County, Mississippi · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Avemore GA LLC Data CenterVilla Rica, Carroll County, Georgia · Atlanta DevelopmentProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 350,000 sq ft; 428 acresProject-scale context · Proposed floor area · Site area
Willis Data CenterWillis, Montgomery County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 5,200 sq ftProject-scale context · Proposed floor area
Fairview Crossroads LLC Data CenterYork, Pennsylvania · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 750,000 sq ftProject-scale context · Proposed floor area
University of Michigan Los Alamos Data CenterYpsilanti, Washtenaw County, Michigan · Los Alamos National LaboratoryProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Allegro North CampusALDIE, Loudoun County, Virginia · Ranalli Super DC LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,260,000 sq ft; 49 acresProject-scale context · Proposed floor area · Site area
Plaza 500Alexandria, Fairfax County, Virginia · Red Wolf DCD Properties LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 461,444 sq ftProject-scale context · Proposed floor area
Project Green Mountain Data CenterArchbald, Lackawanna County, Pennsylvania · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 966,000 sq ft; 270 acresProject-scale context · Proposed floor area · Site area
Armstrong County campusArmstrong County, Texas · GoogleProposedconfirmedproposalNDAMoneyWaterPowerGoogle-listed campus in developmentProject-scale context
Belmont Innovation CampusAshburn, Loudoun County, Virginia · LOUDOUN GC LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,300,000 sq ft; 112 acresProject-scale context · Proposed floor area · Site area
BRAMBLETON SHREVEPORT SOUTH DATA CENTERAshburn, Loudoun County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,317,531 sq ft; 114 acresProject-scale context · Proposed floor area · Site area
JK Land Freedom Trail Road Data CenterAshburn, Loudoun County, Virginia · JK Land HoldingsProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,100,000 sq ft; 108 acresProject-scale context · Proposed floor area · Site area
Tech Park at BrambletonAshburn, Loudoun County, Virginia · BlackChamber GroupProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,700,000 sq ft; 89 acresProject-scale context · Proposed floor area · Site area
Brambleton Business Campus Data CenterASHBURN, Loudoun County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 936,191 sq ft; 48 acresProject-scale context · Proposed floor area · Site area
Hanover-Ashland Data CenterAshland, Hanover County, Virginia · Tradeport Ashland Land LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 78 acresProject-scale context · Site area
Ironhorse East AshlandAshland, Hanover County, Virginia · Harris and Douglass Properties, LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 3,300,000 sq ft; 234 acresProject-scale context · Proposed floor area · Site area
LS PowerAshland, Hanover County, Virginia · LS PowerProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 205 acresProject-scale context · Site area
Stonewall Tell Data CenterAtlanta, Fulton County, Georgia · RSC Investment Management LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,902,000 sq ftProject-scale context · Proposed floor area
Vantage Data Centers Stacks Road CampusAtlanta, Fulton County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 696,980 sq ftProject-scale context · Proposed floor area
Vantage: Westlake ProjectAtlanta, Fulton County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 750,000 sq ftProject-scale context · Proposed floor area
Edge Data CenterBeaver Dam, Dodge County, Wisconsin · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 90,000 sq ft; 13 acresProject-scale context · Proposed floor area · Site area
Camp Monterey Data CenterBeaver Dams, Schuyler County, New York · FLX GatewayProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Aurum Capital VenturesBismark, Burleigh County, North Dakota · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Project Blue HoleBlakely, Early County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 12,000,000 sq ft; expected online Full buildout by 2035Project-scale context · Proposed floor area · Target online date
State Line Project Data Center campusBlanchard, Caddo County, Louisiana · TXLAAR LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 810 acresProject-scale context · Site area
Atlas Capital GroupBloomfield, Hartford County, Connecticut · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,000,000 sq ftProject-scale context · Proposed floor area
TXLAAR LLC Data CenterBossier Parish, Bossier County, Louisiana · TXLAAR LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1080 acresProject-scale context · Site area
GotSpace Data CenterBozrah, New London County, Connecticut · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 980,000 sq ftProject-scale context · Proposed floor area
Guadalupe Quarry Redevelopment Project Data CenterBrisbane, San Mateo County, California · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 180,000 sq ft; 62 acresProject-scale context · Proposed floor area · Site area
Delvin Technology ParkBristow, Prince William County, Virginia · STANLEY MARTIN HOMES, LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 3,530,000 sq ft; 270 acresProject-scale context · Proposed floor area · Site area
Hunter PropertyBristow, Prince William County, Virginia · LHR GAINESVILLE LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 3,650,157 sq ft; 196 acresProject-scale context · Proposed floor area · Site area
Sharpless Enterprises LLCBristow, Prince William County, Virginia · Sharpless Enterprises LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,400,000 sq ft; 181 acresProject-scale context · Proposed floor area · Site area
Stack Infrastructure Bristow CampusBristow, Prince William County, Virginia · STACK INFRASTRUCTUREProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 637,282 sq ftProject-scale context · Proposed floor area
Broken Arrow Data CenterBroken Arrow, Wagoner County, Oklahoma · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Google Buffalo Data CenterBuffalo, Putnam County, West Virginia · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1700 acresProject-scale context · Site area
Compton Property SUPBull run, Prince William County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,062,000 sq ftProject-scale context · Proposed floor area
Microsoft Caledonia Data CenterCaledonia, Kent County, Michigan · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 414 acresProject-scale context · Site area
Data CenterCalhoun, Gordon County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 500,000 sq ft; 57 acresProject-scale context · Proposed floor area · Site area
Terra Nexus Ventures Data CenterCamden, Kershaw County, South Carolina · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 162 acresProject-scale context · Site area
TRACT Data CenterCannon Falls, Dakota County, Minnesota · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,750,000 sq ft; 253 acresProject-scale context · Proposed floor area · Site area
Bull Church Data CenterCaroline County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 792,000 sq ft; 88 acresProject-scale context · Proposed floor area · Site area
Ladysmith Technology ParkCaroline County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,684,480 sq ft; 165 acresProject-scale context · Proposed floor area · Site area
Simple MiningCascade, Dubuque County, Iowa · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 6,400 sq ftProject-scale context · Proposed floor area
Microsoft Castroville data centerCastroville, Medina County, Texas · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 489,400 sq ft; expected online 2028Project-scale context · Proposed floor area · Target online date
Catlett Data Center ParkCatlett, Fauquier County, Virginia · Catlett Station II LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,400,000 sq ft; 69 acresProject-scale context · Proposed floor area · Site area
Cedar Rapids campusCedar Rapids, Iowa · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerGoogle-listed campus in developmentProject-scale context
Chantilly Premier Data CenterChantilly, Fairfax County, Virginia · PDCREF 2 CHANTILLY LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 402,000 sq ft; 79 acresProject-scale context · Proposed floor area · Site area
Parkstone Tech ParkChantilly, Fairfax County, Virginia · PARKSTONE TECH PARK, LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 500,000 sq ft; 19 acresProject-scale context · Proposed floor area · Site area
LYH03 Bailey – MicrosoftChase City, Mecklenburg County, Virginia · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 369 acresProject-scale context · Site area
CoreWeaveChester, Chesterfield County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Project PeanutChester, Chesterfield County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 300 acresProject-scale context · Site area
Lancium ChildressChildress, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 3720 acresProject-scale context · Site area
Clarks Summit Data CenterClarks Summit, Lackawanna County, Pennsylvania · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 290,400 sq ft; 76 acresProject-scale context · Proposed floor area · Site area
Clarksville Data Center CampusClarksville, Mecklenburg County, Virginia · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 259 acresProject-scale context · Site area
Columbia County campusColumbia County, Georgia · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerGoogle-listed campus in developmentProject-scale context
Aligned Data CenterConesville, Coshocton County, Ohio · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 197 acresProject-scale context · Site area
Fort Hood data baseCoryell, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 207 acresProject-scale context · Site area
Wylie Capital Data CenterCrown Point, Lake County, Indiana · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,200,000 sq ftProject-scale context · Proposed floor area
Cielo Digital InfrastructureCulpeper, Virginia · Cielo Digital InfrastructureProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,400,000 sq ft; 121 acresProject-scale context · Proposed floor area · Site area
CloudHQCulpeper, Virginia · CloudHQProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,100,000 sq ft; 99 acresProject-scale context · Proposed floor area · Site area
Copper RidgeCulpeper, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,200,000 sq ft; 117 acresProject-scale context · Proposed floor area · Site area
Culpeper Technology CampusCulpeper, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,100,000 sq ft; 155 acresProject-scale context · Proposed floor area · Site area
Keyser Farm/ Blue Owl Data CenterCulpeper, Virginia · StackProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,506,582 sq ft; 62 acresProject-scale context · Proposed floor area · Site area
XX Tech ParkCulpeper, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 4,638,704 sq ft; 352 acresProject-scale context · Proposed floor area · Site area
GreenfieldDALEVILLE, Botetourt County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 312 acresProject-scale context · Site area
CORE DALTON 4Dalton, Whitfield County, Georgia · Core ScientificProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 435,600 sq ftProject-scale context · Proposed floor area
Karis Critical Data CenterDekalb, DeKalb County, Illinois · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,750,000 sq ft; 132 acresProject-scale context · Proposed floor area · Site area
Creekstone Gigasite Data CenterDelta, Millard County, Utah · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 4000 acresProject-scale context · Site area
Dorchester County campusDorchester County, South Carolina · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerGoogle-listed campus in developmentProject-scale context
Microsoft Dorr Data CenterDorr, Allegan County, Michigan · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 272 acresProject-scale context · Site area
Vantage Data CenterDouglasville, Douglas County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,700,000 sq ftProject-scale context · Proposed floor area
Scott County Regional Business & Technology ParkDuffield, Scott County, Virginia · SCOTT COUNTY INDUSTRIAL DEV.Proposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 55 acresProject-scale context · Site area
Dugway Proving Ground Data CenterDugway, Tooele County, Utah · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 3466 acresProject-scale context · Site area
Farah-Naples Data CenterDulles, Loudoun County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 100,000 sq ft; 11 acresProject-scale context · Proposed floor area · Site area
DAMAC Data CenterEdgerton, Johnson County, Kansas · DAMACProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Edwards AFB Data CenterEdwards, Kern County, California · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Gail Technology Data CenterEffingham, Illinois · Gail TechnologyProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; expected online 2027Project-scale context · Target online date
AlignedElk Grove Village, Cook County, Illinois · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 50,000 sq ftProject-scale context · Proposed floor area
Nexstar Media Group Data CenterElk Grove Village, Cook County, Illinois · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 700,000 sq ftProject-scale context · Proposed floor area
Bitter Blue Data CenterElmendorf, Bexar County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Mid-Atlantic Advanced Manufacturing CenterEmporia, Greensville County, Virginia · Arup Americas IncProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 930 acresProject-scale context · Site area
Sentinel Data CenterExton, Chester County, Pennsylvania · SentinelProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 887,000 sq ftProject-scale context · Proposed floor area
T5 ATL IVFairburn, Fulton County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,320,000 sq ftProject-scale context · Proposed floor area
TRACT Data CenterFarmington, Dakota County, Minnesota · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,600,000 sq ft; 342 acresProject-scale context · Proposed floor area · Site area
Heartland Innovative Technology (HIT) ParkFarmville, Prince Edward County, Virginia · Prince Edward County Industrial Development AuthorityProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,300,000 sq ft; 280 acresProject-scale context · Proposed floor area · Site area
Cawley PartnersFerris, Ellis County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 5200 acresProject-scale context · Site area
Digital Realty Fort Gillem CampusForest Park, Clayton County, Georgia · Digital RealtyProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,900,000 sq ftProject-scale context · Proposed floor area
Fort Bliss Data CenterFort Bliss, El Paso County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1384 acresProject-scale context · Site area
Fort Bragg Data CenterFort Bragg, Cumberland County, North Carolina · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Joint Base McGuire-Dix-LakehurstFort Dix, Burlington County, New Jersey · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 193 acresProject-scale context · Site area
Edged Fort Worth Data CenterFort Worth, Tarrant County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 186 acresProject-scale context · Site area
Amazon AWS IAD450 - Cosner Tech CampusFredericksburg, Spotsylvania County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Carter's Store Tech CampusFredericksburg, Spotsylvania County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,600,000 sq ft; 313 acresProject-scale context · Proposed floor area · Site area
Cosner Tech CampusFredericksburg, Spotsylvania County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,900,000 sq ft; 329 acresProject-scale context · Proposed floor area · Site area
Hunter's Ridge SouthFredericksburg, Spotsylvania County, Virginia · AREP SOF III HRS LLC C/O AMERICAN REAL ESTATE PARTNERS, LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,549,131 sq ft; 73 acresProject-scale context · Proposed floor area · Site area
Summit Crossing Tech CampusFredericksburg, Spotsylvania County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,100,000 sq ft; 231 acresProject-scale context · Proposed floor area · Site area
Summit Technology ParkFredericksburg, Spotsylvania County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,200,000 sq ft; 125 acresProject-scale context · Proposed floor area · Site area
Blaisdell Property Data CenterFredericksburg, Stafford County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,480,000 sq ft; 181 acresProject-scale context · Proposed floor area · Site area
Cranes Corner Data CenterFredericksburg, Stafford County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 900,000 sq ft; 46 acresProject-scale context · Proposed floor area · Site area
Enon Road Technology ParkFredericksburg, Stafford County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,000,000 sq ft; 162 acresProject-scale context · Proposed floor area · Site area
Forest Lane Data CenterFredericksburg, Stafford County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 7,068,000 sq ft; 850 acresProject-scale context · Proposed floor area · Site area
George Washington Village Data CenterFredericksburg, Stafford County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 7,900,000 sq ft; 1042 acresProject-scale context · Proposed floor area · Site area
Sisson NorthFredericksburg, Stafford County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,140,000 sq ft; 106 acresProject-scale context · Proposed floor area · Site area
Neon Project at Celebrate Virginia SouthFredericksburg, Virginia · STACK INFRASTRUCTUREProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 250 acresProject-scale context · Site area
Fredonia Data CenterFredonia, Ozaukee County, Wisconsin · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Gainsville EastGainesville, Prince William County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,200,000 sq ft; 117 acresProject-scale context · Proposed floor area · Site area
Gardner PropertyGainesville, Prince William County, Virginia · JK Land HoldingsProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,787,266 sq ft; 82 acresProject-scale context · Proposed floor area · Site area
John Marshall CommonsTech ParkGainesville, Prince William County, Virginia · CTP-1 LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 530,000 sq ft; 23 acresProject-scale context · Proposed floor area · Site area
NTT Gainesville Data Center CampusGainesville, Prince William County, Virginia · NTT Global Data CentersProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,957,680 sq ft; 102 acresProject-scale context · Proposed floor area · Site area
Village Place at Gainesville Technology ParkGainesville, Prince William County, Virginia · CTP-I LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,188,143 sq ft; 45 acresProject-scale context · Proposed floor area · Site area
Microsoft Grand Rapids Data CenterGrand Rapids, Kent County, Michigan · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 316 acresProject-scale context · Site area
Granger Data Center ExpansionGranger, St. Joseph County, Indiana · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 900 acresProject-scale context · Site area
Unnamed Data CenterGretna, Pittsylvania County, Virginia · BOLES, BRENDA ET ALS EAST, SHARON ET ALS BOLES, DOUGLAS ET ALS KELLEY, OTEY HARRIS III ET ALS KELLEY, CHARLES ET ALSProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,280,801 sq ft; 52 acresProject-scale context · Proposed floor area · Site area
Monolith-Olive Creek Data CenterHallam, Lancaster County, Nebraska · Crusoe?Proposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 10 acresProject-scale context · Site area
0 Rocky Creek Data Center CampusHampton, Henry County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,250,000 sq ftProject-scale context · Proposed floor area
Haskell County campusHaskell County, Texas · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerGoogle-listed campus in developmentProject-scale context
Renaissance Technology ParkHerndon, Fairfax County, Virginia · RP INDUSTRIAL OWNER II LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,136,040 sq ft; 13 acresProject-scale context · Proposed floor area · Site area
HCI DP Land Acquisition Data CenterHummelstown, Dauphin County, Pennsylvania · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 596,800 sq ft; 250 acresProject-scale context · Proposed floor area · Site area
Project RaptorHutto, Williamson County, Texas · ColovoreProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 180,000 sq ftProject-scale context · Proposed floor area
River ParkJackson, Butts County, Georgia · Interstate Health Systems, LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 11,000,000 sq ftProject-scale context · Proposed floor area
Jenkins KY Data Center (pre-proposal)Jenkins, Letcher County, Kentucky · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 100 acresProject-scale context · Site area
Catalyst Commercial Development LLCJessup, Lackawanna County, Pennsylvania · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 487,000 sq ft; 48 acresProject-scale context · Proposed floor area · Site area
Johnstown Data Center (Beech Rd NW)Johnstown, Licking County, Ohio · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 459,000 sq ft; 68 acresProject-scale context · Proposed floor area · Site area
Johnstown Data Center (Beech Rd)Johnstown, Licking County, Ohio · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 112 acresProject-scale context · Site area
Johnstown Data Center (Harrison Rd)Johnstown, Licking County, Ohio · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 170,000 sq ft; 100 acresProject-scale context · Proposed floor area · Site area
Shenandoah Computing Data CenterKansas City, Clay County, Missouri · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,435,000 sq ft; 315 acresProject-scale context · Proposed floor area · Site area
Kansas City campusKansas City, Missouri · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerGoogle-listed campus in developmentProject-scale context
Green Energy Ventures Data CenterKing George County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 6,500,000 sq ft; 352 acresProject-scale context · Proposed floor area · Site area
Dahlgren WestKing George, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 9,000,000 sq ft; 497 acresProject-scale context · Proposed floor area · Site area
LaGrange campusLaGrange, Georgia · GoogleProposedconfirmedproposalNDAMoneyWaterPowerGoogle-listed campus in developmentProject-scale context
Project SwanLakeland, Polk County, Florida · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 600,000 sq ft; 60 acresProject-scale context · Proposed floor area · Site area
Project LabradorLancaster, Dallas County, Texas · Unknown operatorProposedconfirmedapproval / land-useNDAMoneyWaterPowerUnknown; 1,040,000 sq ft; 419 acresProject-scale context · Proposed floor area · Site area
Eternal Rings Data CenterLaurel, Howard County, Maryland · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Cross Mill CenterLeesburg, Loudoun County, Virginia · Kuhn, Charles C/JK Holdings II LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 546,500 sq ft; 21 acresProject-scale context · Proposed floor area · Site area
Cross Mill Center Data CenterLeesburg, Loudoun County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 556,746 sq ft; 22 acresProject-scale context · Proposed floor area · Site area
Curata Partners Leesburg Data CenterLeesburg, Loudoun County, Virginia · Curata PartnersProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 87 acresProject-scale context · Site area
Greenlin ParkLeesburg, Loudoun County, Virginia · Charles S Kuhn/JK Landholdings II LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 3,702,600 sq ft; 85 acresProject-scale context · Proposed floor area · Site area
Leesburg Data CenterLeesburg, Loudoun County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 100 acresProject-scale context · Site area
Leesburg GatewayLeesburg, Loudoun County, Virginia · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 281,800 sq ft; 99 acresProject-scale context · Proposed floor area · Site area
OaklawnLeesburg, Loudoun County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 700,000 sq ft; 26 acresProject-scale context · Proposed floor area · Site area
Orme Farm RezoningLeesburg, Loudoun County, Virginia · Van Metre Communities LLC/Roy BarnettProposedconfirmedapproval / land-useNDAMoneyWaterPowerUnknown; 508,000 sq ft; 11 acresProject-scale context · Proposed floor area · Site area
Tuscarora Crossing Landbay 3Leesburg, Loudoun County, Virginia · BlackChamber GroupProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 701,400 sq ft; 38 acresProject-scale context · Proposed floor area · Site area
Twin Creeks Assemblage Data CenterLeesburg, Loudoun County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 811,129 sq ft; 53 acresProject-scale context · Proposed floor area · Site area
Villages at LeesburgLeesburg, Loudoun County, Virginia · STACK INFRASTRUCTUREProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 250,000 sq ft; 34 acresProject-scale context · Proposed floor area · Site area
PA Data Center PartnersLewistown, Mifflin County, Pennsylvania · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Lincoln campusLincoln, Nebraska · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerGoogle-listed campus in developmentProject-scale context
Microsoft: FTY101Lithia Springs, Douglas County, Georgia · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,000,000 sq ft; 160 acresProject-scale context · Proposed floor area · Site area
Rock House Road Data CenterLithia Springs, Douglas County, Georgia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,465,000 sq ftProject-scale context · Proposed floor area
Wilderness CrossingLocust Grove, Orange County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 5,000,000 sq ft; 2600 acresProject-scale context · Proposed floor area · Site area
Desper Creek Technology Campus - AWS Data CenterLouisa County, Louisa County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 140 acresProject-scale context · Site area
North Creek Tech CampusLouisa, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 8,700,000 sq ft; 1400 acresProject-scale context · Proposed floor area · Site area
Texas Solarworks LLCLubbock, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 936 acresProject-scale context · Site area
Data Center THM1ALueders, Haskell County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 280,000 sq ftProject-scale context · Proposed floor area
AWS Data CenterLusby, Calvert County, Maryland · AWS/ Natelli HoldingsProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Jefferson Proving Ground Data CenterMadison, Jefferson County, Indiana · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
HostDime Data CenterMaitland, Orange County, Florida · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 100,000 sq ftProject-scale context · Proposed floor area
Airport Gateway Commerce CenterManassas, Prince William County, Virginia · UNICORN INTERESTS LLC, PCL F1Proposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 369,600 sq ft; 36 acresProject-scale context · Proposed floor area · Site area
Airport Gateway Commerce CenterManassas, Prince William County, Virginia · UNICORN HOTEL LLC, C/O DUPONT FABROS DEVELOPMENT, PCL DProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 7 acresProject-scale context · Site area
Alexandria Technology CenterManassas, Prince William County, Virginia · QTS MANASSAS I LAND LLC C/O BLACKSTONE PROPERTY ADVISORSProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 12 acresProject-scale context · Site area
Aligned Manassas CampusManassas, Prince William County, Virginia · PROPCO LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,275,141 sq ft; 28 acresProject-scale context · Proposed floor area · Site area
Amazon - AWS Bethlehem Road CampusManassas, Prince William County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 10 acresProject-scale context · Site area
Amazon Data Center- Centuty Park CampusManassas, Prince William County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 17 acresProject-scale context · Site area
Cloud HQ MCC5 Data CenterManassas, Prince William County, Virginia · UNICORN INTERESTS LLC, CLOUD HQProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 400,000 sq ft; 24 acresProject-scale context · Proposed floor area · Site area
Digital Second ManassasManassas, Prince William County, Virginia · DIGITAL CARVER BRICKYARD LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,759,136 sq ft; 61 acresProject-scale context · Proposed floor area · Site area
Freedom I-66 Business Center (Parcel 8)Manassas, Prince William County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 11 acresProject-scale context · Site area
INNOVATION EXECUTIVE CENTER DC-3Manassas, Prince William County, Virginia · QTS MANASSAS I DC2 LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 174,719 sq ftProject-scale context · Proposed floor area
Iron Mountain Building 7Manassas, Prince William County, Virginia · IRON MOUNTAIN DATA CENTERS VA 7 LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 304,000 sq ft; 24 acresProject-scale context · Proposed floor area · Site area
Manassas Corporate Center MCC-7 PRAManassas, Prince William County, Virginia · UNICORN INTERESTS LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,082,231 sq ftProject-scale context · Proposed floor area
Mid-County Industrial ParkManassas, Prince William County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 664,715 sq ft; 64 acresProject-scale context · Proposed floor area · Site area
PARSONS BUSINESS PARK LLCManassas, Prince William County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,628,411 sq ft; 91 acresProject-scale context · Proposed floor area · Site area
South Point Phase II Data Center CampusManassas, Prince William County, Virginia · South Point Phase II LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 530,000 sq ft; 22 acresProject-scale context · Proposed floor area · Site area
Vulcan Data CenterManassas, Prince William County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,071,000 sq ft; 165 acresProject-scale context · Proposed floor area · Site area
Westview 66Manassas, Prince William County, Virginia · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 623,360 sq ft; 40 acresProject-scale context · Proposed floor area · Site area
Black Chamber Partners Data CenterManassas, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Arnold Air Force Base Data CenterManchester, Coffee County, Tennessee · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 274 acresProject-scale context · Site area
Former Sears Data CenterMassena, St. Lawrence County, New York · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Michigan City campusMichigan City, Indiana · GoogleProposedconfirmedproposalNDAMoneyWaterPowerGoogle-listed campus in developmentProject-scale context
Frightland Data CenterMiddletown, New Castle County, Delaware · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 6,482,000 sq ft; 1362 acresProject-scale context · Proposed floor area · Site area
FO Permian Partners and HiVolt Energy Data CenterMidland County, Midland County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 320 acresProject-scale context · Site area
Project LochMidlothian, Chesterfield County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 350 acresProject-scale context · Site area
Sharka Data CenterMidlothian, Ellis County, Texas · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Project LochMidloththian, Chesterfield County, Virginia · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 340 acresProject-scale context · Site area
Lake Anna Tech CampusMineral, Louisa County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,700,000 sq ft; 150 acresProject-scale context · Proposed floor area · Site area
US Internet Data CenterMinneapolis, Hennepin County, Minnesota · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 4,000 sq ftProject-scale context · Proposed floor area
Project LouieMonroe Township, Morgan County, Indiana · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 391 acresProject-scale context · Site area
Beacon Data CenterMontgomery, Mobile County, Alabama · BeaconProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 95 acresProject-scale context · Site area
Morgan County campusMorgan County, Indiana · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerGoogle-listed campus in developmentProject-scale context
Project SkyeMoseley, Chesterfield County, Virginia · GoogleProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 890 acresProject-scale context · Site area
Upper Magnolia Green EastMoseley, Chesterfield County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 744 acresProject-scale context · Site area
Upper Magnolia Green West Tract A and Tract BMoseley, Chesterfield County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 979 acresProject-scale context · Site area
Karis Data CenterNaperville, DuPage County, Illinois · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 168 acresProject-scale context · Site area
Project Pinenear Pringle, Catawba County, North Carolina · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
KRNL Data CenterNew Castle Twp, Schuylkill County, Pennsylvania · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 850,000 sq ftProject-scale context · Proposed floor area
New Hill Digital CampusNew Hill, Wake County, North Carolina · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 190 acresProject-scale context · Site area
The Newark ProjectNewark, New Castle County, Delaware · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 4 acresProject-scale context · Site area
Central Coweta Industrial Phase IINewnan, Coweta County, Georgia · Central Coweta Industrial LLC, Brent HoldingsProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 24,000,000 sq ftProject-scale context · Proposed floor area
Project RockforgeNewton, Catawba County, North Carolina · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Oregon Data CenterOregon, Lucas County, Ohio · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 20 acresProject-scale context · Site area
Gregory Road Data CenterOxford, Newton County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,400,000 sq ft; 213 acresProject-scale context · Proposed floor area · Site area
Project PeachPalmetto, Coweta County, Georgia · North Coweta Investors, LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,100,000 sq ftProject-scale context · Proposed floor area
APR Energy Data CenterPampa, Gray County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 800 acresProject-scale context · Site area
Mink East Data CenterPataskala, Licking County, Ohio · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,660,000 sq ft; 323 acresProject-scale context · Proposed floor area · Site area
Wagner Properties Data CenterPetersburg, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Warrenton Group Data CenterPetersburg, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 174 acresProject-scale context · Site area
Cloverleaf Data Center: Project Open SkyPiedmont, Canadian County, Texas · CloverleafProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,116,800 sq ft; 633 acresProject-scale context · Proposed floor area · Site area
Provident Realty Advisors Data CenterPorter, Indiana · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 102 acresProject-scale context · Site area
Convergent Technology ParkRemington, Fauquier County, Virginia · Convergent VA LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,056,000 sq ft; 139 acresProject-scale context · Proposed floor area · Site area
SAMX Data CenterRemington, Fauquier County, Virginia · SAMX DataProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,140,000 sq ft; 55 acresProject-scale context · Proposed floor area · Site area
Remington Innovation CampusREMINGTON, Fauquier County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,221,560 sq ft; 204 acresProject-scale context · Proposed floor area · Site area
Robbins Incinerator Data CenterRobbins, Cook County, Illinois · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 16 acresProject-scale context · Site area
Champion Data Center Land AdvertisementRobinson Township, Allegheny County, Pennsylvania · Next Generation Land CompanyProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1000 acresProject-scale context · Site area
Project Gracie (Atlas Development)Rome, Floyd County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,400,000 sq ftProject-scale context · Proposed floor area
Rome CampusRome, Floyd County, Georgia · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Green Energy CenterRushmere, Surry County, Virginia · Green Energy PartnersProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 641 acresProject-scale context · Site area
ADP Ladysmith Data HubRuther Glen, Caroline County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,600,000 sq ft; 140 acresProject-scale context · Proposed floor area · Site area
Airlee Industrial and Data Center SiteRuther Glen, Caroline County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,500,000 sq ft; 184 acresProject-scale context · Proposed floor area · Site area
Carmel Church Data HubRuther Glen, Caroline County, Virginia · W & F PARTNERSProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,600,000 sq ft; 97 acresProject-scale context · Proposed floor area · Site area
Carmel Technology & Enterprise CenterRuther Glen, Caroline County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 5,600,000 sq ft; 1196 acresProject-scale context · Proposed floor area · Site area
Caroline Center for InnovationRuther Glen, Caroline County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 3,000,000 sq ft; 278 acresProject-scale context · Proposed floor area · Site area
Caroline Center for Innovation - NorthRuther Glen, Caroline County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,500,000 sq ft; 95 acresProject-scale context · Proposed floor area · Site area
Thornberry Data Center CampusRuther Glen, Caroline County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 3,300,000 sq ft; 1002 acresProject-scale context · Proposed floor area · Site area
VALCO Data Center ParkRuther Glen, Caroline County, Virginia · VALCO CAROLINE COUNTYProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,216,000 sq ft; 855 acresProject-scale context · Proposed floor area · Site area
Atlantic CrossingSandston, Henrico County, Virginia · ATLANTIC CROSSING LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 662 acresProject-scale context · Site area
Aligned NEO-01Sandusky, Erie County, Ohio · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 130 acresProject-scale context · Site area
Deep River Data AI Data CenterSanford, Lee County, North Carolina · Deep River DataProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Dickson City Development LLC sScranton/ Dickson City, Lackawanna County, Pennsylvania · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 588,000 sq ftProject-scale context · Proposed floor area
Sandy Farms Data CenterSevern, Anne Arundel County, Maryland · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Athens Shoals Crossing Data CenterShoals Crossing, Clarke County, Georgia · Brasfield & GorrieProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 75,000 sq ftProject-scale context · Proposed floor area
Shreveport Data CenterShreveport, Caddo County, Louisiana · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,000,000 sq ftProject-scale context · Proposed floor area
0 Social Circle Parkway Data CenterSocial Circle, Walton County, Georgia · Sailfish Investors Acquisitions, LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Hillcrest Data CenterSouth Hill, Mecklenburg County, Virginia · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 153 acresProject-scale context · Site area
South Hill Data Center CampusSouth Hill, Mecklenburg County, Virginia · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 132 acresProject-scale context · Site area
Firefox Dulles Data CenterSouth Riding, Loudoun County, Virginia · Brian Clifford/DLA PIPER LLP (US)Proposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 641,451 sq ft; 18 acresProject-scale context · Proposed floor area · Site area
Gateway Commerce CenterSpotsylvania, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 2,200,000 sq ft; 203 acresProject-scale context · Proposed floor area · Site area
AWS Loisdale StationSpringfield, Fairfax County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 240,000 sq ft; 23 acresProject-scale context · Proposed floor area · Site area
Project CumulusSt Charles, St. Charles County, Missouri · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,500,000 sq ft; 440 acresProject-scale context · Proposed floor area · Site area
St Charles Data CenterSt Charles, St. Charles County, Missouri · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Accokeek CenterStafford, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 520,000 sq ft; 80 acresProject-scale context · Proposed floor area · Site area
Austin Ridge Logisitics CenterStafford, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,600,000 sq ft; 183 acresProject-scale context · Proposed floor area · Site area
Old Potomac Church Data CenterStafford, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 510,000 sq ft; 50 acresProject-scale context · Proposed floor area · Site area
Amazon AWS - Manekin Plaza Data CenterSterling, Loudoun County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 313,000 sq ft; 7 acresProject-scale context · Proposed floor area · Site area
DCT DULLES DOWNS Land Bay BSterling, Loudoun County, Virginia · DCT DULLES DOWNS LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 670,953 sq ftProject-scale context · Proposed floor area
Dulles 2000 RedevelopmentSterling, Loudoun County, Virginia · BCG JV Sterling LLC; Phil TagerProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 530,550 sq ft; 15 acresProject-scale context · Proposed floor area · Site area
Dulles 28 Technology ParkSterling, Loudoun County, Virginia · BlackChamber GroupProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 685,000 sq ft; 26 acresProject-scale context · Proposed floor area · Site area
DULLES NORTH CORPORATE PARK 8Sterling, Loudoun County, Virginia · John Collich/BF SAUL REAL ESTATE INVESTMENTProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 262,000 sq ft; 10 acresProject-scale context · Proposed floor area · Site area
Dulles Trade Center WestSterling, Loudoun County, Virginia · 10 Trade West Drive LLC/Charles S Kuhn ManagerProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 386,800 sq ft; 15 acresProject-scale context · Proposed floor area · Site area
EdgeCore Ashburn AS02 Data CenterSterling, Loudoun County, Virginia · EdgeCore Digital/Partners GroupProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 285,000 sq ft; 8 acresProject-scale context · Proposed floor area · Site area
JK Technology Park #3 Data Center CampusSterling, Loudoun County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 184,080 sq ft; 21 acresProject-scale context · Proposed floor area · Site area
Loudoun Commerce CenterSterling, Loudoun County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 311,670 sq ft; 14 acresProject-scale context · Proposed floor area · Site area
MECP 1 ASHBURN 2 LLCSterling, Loudoun County, Virginia · EdgeCore Digital/Partners GroupProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 348,000 sq ft; 10 acresProject-scale context · Proposed floor area · Site area
Paragon Park Lot 3BSterling, Loudoun County, Virginia · BlackChamber GroupProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 405,611 sq ft; 50 acresProject-scale context · Proposed floor area · Site area
Prologis Executive Dr Data Center CampusSterling, Loudoun County, Virginia · PrologisProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 8 acresProject-scale context · Site area
Prologis Executive Drive Data Center CampusSterling, Loudoun County, Virginia · PrologisProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 750,000 sq ft; 9 acresProject-scale context · Proposed floor area · Site area
PROLOGIS PARK GATEWAY IISterling, Loudoun County, Virginia · PrologisProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 294,000 sq ft; 11 acresProject-scale context · Proposed floor area · Site area
Marvell DevelopmentsStevensburg, Culpeper County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 445,000 sq ft; 223 acresProject-scale context · Proposed floor area · Site area
Amazon AWS IAD - 42090 Reeds Farm Ln Data CenterStone Ridge, Loudoun County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 429,213 sq ft; 90 acresProject-scale context · Proposed floor area · Site area
Sammis Power Plant Data CenterStratton, Jefferson County, Ohio · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Microsoft Fairwater CampusSturtevant, Racine County, Wisconsin · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 4,400,000 sq ft; 791 acresProject-scale context · Proposed floor area · Site area
Microsoft International Drive CampusSturtevant, Racine County, Wisconsin · MicrosoftProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 230 acresProject-scale context · Site area
Huge Data Center developmentTexas panhandle, location unknown, Carson County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 5000 acresProject-scale context · Site area
Upson County MegasiteThomaston, Upson County, Georgia · Dominion CapitalProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 3,250,000 sq ftProject-scale context · Proposed floor area
Soltier CryptomineTowanda, Bradford County, Pennsylvania · SoltierProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 3 acresProject-scale context · Site area
Data center: Davis-Monthan Air Force BaseTucson, Pima County, Arizona · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 300 acresProject-scale context · Site area
Union City Data CenterUnion City, Fulton County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Valdosta Data CenterValdosta, Lowndes County, Georgia · Langdale Capital AssetsProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Black Mountain Power Data CenterVan Ormy/ San Antonio, Bexar County, Texas · Black Mountain PowerProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 432 acresProject-scale context · Site area
Midlothian 1 Data CenterVenus, Ellis County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Midlothian 2 Data CenterVenus, Ellis County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Midlothian 3 Data CenterVenus, Ellis County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Midlothian 4 Data CenterVenus, Ellis County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Midlothian 5 Data CenterVenus, Ellis County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Venus Data CenterVenus, Ellis County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 217 acresProject-scale context · Site area
Midlothian 6 Data CenterVenus, Johnson County, Texas · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Robins Air Force Base Data CenterWarner Robins, Houston County, Georgia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
CyrusOne Vint Hill Data CenterWarrenton, Fauquier County, Virginia · C1 Vint Hill LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 981,000 sq ft; 48 acresProject-scale context · Proposed floor area · Site area
Maple Tree FarmWarrenton, Fauquier County, Virginia · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 43 acresProject-scale context · Site area
Vint Hill CornersWARRENTON, Fauquier County, Virginia · Vint Hill Corners LLCProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 360,000 sq ft; 46 acresProject-scale context · Proposed floor area · Site area
Yankee Nuclear Power Plant Data CenterWicasset, Lincoln County, Maine · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknownProject-scale context
Blue Ladder Data Center \Wolcott, White County, Indiana · Blue LadderProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 1,310,448 sq ft; 322 acresProject-scale context · Proposed floor area · Site area
Mattameade Tech CampusWoodford, Caroline County, Virginia · AmazonProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 4,500,000 sq ft; 916 acresProject-scale context · Proposed floor area · Site area
CyrusOne Data CenterYorkville, Kendall County, Illinois · Unknown operatorProposedconfirmedutility / powerNDAMoneyWaterPowerUnknown; 740,000 sq ft; 128 acresProject-scale context · Proposed floor area · Site area
TeraWulf Abernathy CampusAbernathy, Texas, United States · TeraWulfProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Abilene - Building 1Abilene, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Abilene - Building 2Abilene, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Abilene - Building 3Abilene, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Abilene - Building 4Abilene, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Abilene - Building 5Abilene, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Abilene - Building 6Abilene, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Abilene - Building 7Abilene, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Abilene - Building 8Abilene, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stargate Abilene (Crusoe Abilene Campus)Abilene, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Springbank CampusAdairsville, Georgia, United States · Atlas Development LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS IAD - Quail CampusAldie, Virginia, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Growth Mindset CampusAldie, Virginia, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Yondr Loundoun County CampusAldie, Virginia, United States · Yondr GroupProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
STACK Infrastructure ATL01 CampusAlpharetta, Georgia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology CampusAppling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC1Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC10Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC11Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC12Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC13Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC14Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC15Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC16Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC17Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC18Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC2Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC3Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC4Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC5Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC6Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC7Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC8Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Byrd Farms Technology Campus DC9Appling, Georgia, United States · Byrd Farms LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Gravity - Building 1Archbald, Pennsylvania, United States · Western Hospitality PartnersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Gravity - Building 2Archbald, Pennsylvania, United States · Western Hospitality PartnersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Gravity - Building 3Archbald, Pennsylvania, United States · Western Hospitality PartnersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Gravity - Building 4Archbald, Pennsylvania, United States · Western Hospitality PartnersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Gravity - Building 5Archbald, Pennsylvania, United States · Western Hospitality PartnersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Gravity - Building 6Archbald, Pennsylvania, United States · Western Hospitality PartnersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Wildcat Ridge AI Data Center CampusArchbald, Pennsylvania, United States · Unknown CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
QTS Augusta CampusAugusta, Georgia, United States · QTS Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
8201 E. Riverside Drive, Building 4-6Austin, Texas, United States · Digital Realty TrustProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Austin (11501 Domain Dr.)Austin, Texas, United States · XO CommunicationsProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Candler BuildingBaltimore, Maryland, United States · Unknown CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Lake Mariner Data - Building 1Barker, New York, United States · TeraWulfProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Lake Mariner Data - Building 2Barker, New York, United States · TeraWulfProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Lake Mariner Data - Building 3Barker, New York, United States · TeraWulfProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Lake Mariner Data - Building 4Barker, New York, United States · TeraWulfProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Lake Mariner Data - Building 5Barker, New York, United States · TeraWulfProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Lake Mariner Data - Building 6Barker, New York, United States · TeraWulfProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS Susquehanna Hyperscale CampusBerwick, Pennsylvania, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Bowling Green CampusBowling Green, Kentucky, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gotspace Bozrah - Building 1Bozrah, Connecticut, United States · Gotspace Data PartnersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gotspace Bozrah - Building 2Bozrah, Connecticut, United States · Gotspace Data PartnersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gotspace Bozrah - Building 3Bozrah, Connecticut, United States · Gotspace Data PartnersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gotspace Bozrah CampusBozrah, Connecticut, United States · Gotspace Data PartnersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS IAD - Wellington Campus (Bristow)Bristow, Virginia, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Prince William County - Building 1Bristow, Virginia, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Prince William County - Building 2Bristow, Virginia, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Prince William County - Building 3Bristow, Virginia, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Prince William County - Building 4Bristow, Virginia, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Prince William County CampusBristow, Virginia, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
STACK Infrastructure NVA02 CampusBristow, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
The Pyramid CampusCaledonia, Michigan, United States · SwitchProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Pennsylvania Digital 1 CampusCarlisle, Pennsylvania, United States · PowerHouse Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Castroville CampusCastroville, Texas, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
CyrusOne Phoenix CampusChandler, Arizona, United States · CyrusOne Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS IAD - Clubber & Prediction CampusChantilly, Virginia, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS IAD - Virginia Mallory CampusChantilly, Virginia, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS IAD - Westfax CampusChantilly, Virginia, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
PointOne Richmond Data Center CampusCharles City, Virginia, United States · PointOneProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Chirisa DDC CampusChester, Virginia, United States · ChirisaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Goodnight CampusClaude, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Goodnight Campus DC1Claude, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Goodnight Campus DC2Claude, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Goodnight Campus DC3Claude, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Goodnight Campus DC4Claude, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Goodnight Campus DC5Claude, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Goodnight Campus DC6Claude, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Goodnight Campus DC7Claude, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Keith BuildingCleveland, Ohio, United States · K&D Real Estate ServicesProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Sterling Telecom Office BuildingCleveland, Ohio, United States · Sterling Telecom Office Building, LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Aggie - Building 1College Station, Texas, United States · Priority PowerProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Aggie - Building 2College Station, Texas, United States · Priority PowerProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
CloudHQ CLP CampusCulpeper, Virginia, United States · CloudHQProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
EdgeCore Culpeper CampusCulpeper, Virginia, United States · EdgeCoreProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
The 130 BuildingDayton, Ohio, United States · The 130 BuildingProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
KARIS DeKalb CampusDeKalb, Illinois, United States · KARIS CriticalProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta DeKalb - Building 1DeKalb, Wyoming, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta DeKalb - Building 2DeKalb, Wyoming, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta DeKalb - Building 3DeKalb, Wyoming, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta DeKalb - Building 4DeKalb, Wyoming, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta DeKalb - Building 5DeKalb, Wyoming, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta DeKalb - Building 6DeKalb, Wyoming, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta DeKalb CampusDeKalb, Wyoming, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS CMH - Crosby CampusDublin, Ohio, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS IAD - Fadeley & Woodside CampusDulles, Virginia, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS IAD - Kipper CampusDulles, Virginia, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS IAD - Light Speed Plz CampusDulles, Virginia, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS IAD - Platform & Old Ox CampusDulles, Virginia, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Digital Dulles CampusDulles, Virginia, United States · Digital RealtyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
SDC Columbia CampusEast Wenatchee, Washington, United States · Sabey Data Center Properties LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft East Wenatchee CampusEast Wenatchee, Wyoming, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta El Paso CampusEl Paso, Texas, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prime Chicago Data Center CampusElk Grove Village, Connecticut, United States · Prime Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Elk Grove - Building 1Elk Grove Village, Illinois, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Elk Grove - Building 2Elk Grove Village, Illinois, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Elk Grove - Building 3Elk Grove Village, Illinois, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Elk Grove CampusElk Grove Village, Illinois, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prime Chicago - Building 1Elk Grove Village, Illinois, United States · Prime Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prime Chicago - Building 2Elk Grove Village, Illinois, United States · Prime Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prime Chicago - Building 3Elk Grove Village, Illinois, United States · Prime Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS SAT - Bitter Blue CampusElmendorf, Texas, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Farmington Technology Park - Building 1Farmington, Minnesota, United States · TractProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Farmington Technology Park - Building 10Farmington, Minnesota, United States · TractProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Farmington Technology Park - Building 11Farmington, Minnesota, United States · TractProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Farmington Technology Park - Building 12Farmington, Minnesota, United States · TractProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Farmington Technology Park - Building 2Farmington, Minnesota, United States · TractProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Farmington Technology Park - Building 3Farmington, Minnesota, United States · TractProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Farmington Technology Park - Building 4Farmington, Minnesota, United States · TractProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Farmington Technology Park - Building 5Farmington, Minnesota, United States · TractProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Farmington Technology Park - Building 6Farmington, Minnesota, United States · TractProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Farmington Technology Park - Building 7Farmington, Minnesota, United States · TractProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Farmington Technology Park - Building 8Farmington, Minnesota, United States · TractProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Farmington Technology Park - Building 9Farmington, Minnesota, United States · TractProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
EdgeCore Florence Tech Park - Building 1Florence, Arizona, United States · EdgeCoreProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
EdgeCore Florence Tech Park - Building 10Florence, Arizona, United States · EdgeCoreProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
EdgeCore Florence Tech Park - Building 2Florence, Arizona, United States · EdgeCoreProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
EdgeCore Florence Tech Park - Building 3Florence, Arizona, United States · EdgeCoreProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
EdgeCore Florence Tech Park - Building 4Florence, Arizona, United States · EdgeCoreProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
EdgeCore Florence Tech Park - Building 5Florence, Arizona, United States · EdgeCoreProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
EdgeCore Florence Tech Park - Building 6Florence, Arizona, United States · EdgeCoreProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
EdgeCore Florence Tech Park - Building 7Florence, Arizona, United States · EdgeCoreProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
EdgeCore Florence Tech Park - Building 8Florence, Arizona, United States · EdgeCoreProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
EdgeCore Florence Tech Park - Building 9Florence, Arizona, United States · EdgeCoreProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Forsyth Technology CampusForsyth, Georgia, United States · Trammell Crow CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Rumble Technology CampusForsyth, Georgia, United States · Cloverleaf InfrastructureProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Fort Stockton Clean CampusFort Stockton, Texas, United States · LanciumProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
ACS Fort Worth CampusFort Worth, Texas, United States · Grupo ACSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Aligned Maryland Hyperscale CampusFrederick, Maryland, United States · Aligned Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS BWI - Building 1Frederick, Maryland, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS BWI - Building 2Frederick, Maryland, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS BWI - Building 3Frederick, Maryland, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS BWI - Building 4Frederick, Maryland, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS BWI CampusFrederick, Maryland, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Rowan Bauxite II - Building 1Frederick, Maryland, United States · Rowan Digital InfrastructureProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Rowan Bauxite II - Building 2Frederick, Maryland, United States · Rowan Digital InfrastructureProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Rowan Bauxite II - Building 3Frederick, Maryland, United States · Rowan Digital InfrastructureProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Rowan Bauxite II - Building 4Frederick, Maryland, United States · Rowan Digital InfrastructureProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Rowan Bauxite II CampusFrederick, Maryland, United States · Rowan Digital InfrastructureProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Rowan Bauxite III - Building 1Frederick, Maryland, United States · Rowan Digital InfrastructureProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Rowan Bauxite III - Building 2Frederick, Maryland, United States · Rowan Digital InfrastructureProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Rowan Bauxite III - Building 3Frederick, Maryland, United States · Rowan Digital InfrastructureProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Rowan Bauxite III CampusFrederick, Maryland, United States · Rowan Digital InfrastructureProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS IAD - Carters Store Tech CampusFredericksburg, Virginia, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
PowerHouse 95 - Building 1Fredericksburg, Virginia, United States · PowerHouse Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
PowerHouse 95 - Building 2Fredericksburg, Virginia, United States · PowerHouse Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
PowerHouse 95 - Building 3Fredericksburg, Virginia, United States · PowerHouse Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
PowerHouse 95 - Building 4Fredericksburg, Virginia, United States · PowerHouse Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
PowerHouse 95 - Building 5Fredericksburg, Virginia, United States · PowerHouse Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
PowerHouse 95 - Building 6Fredericksburg, Virginia, United States · PowerHouse Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
PowerHouse 95 CampusFredericksburg, Virginia, United States · PowerHouse Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Sisson CampusFredericksburg, Virginia, United States · Peterson CompaniesProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Gallatin - Building 1Gallatin, Tennessee, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Gallatin - Building 2Gallatin, Tennessee, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Gallatin - Building 3Gallatin, Tennessee, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Gallatin - Building 4Gallatin, Tennessee, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Gallatin - Building 5Gallatin, Tennessee, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Gallatin - Building 6Gallatin, Tennessee, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Gallatin CampusGallatin, Tennessee, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Digital Realty Garland CampusGarland, Texas, United States · Digital RealtyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
NTT Garland CampusGarland, Texas, United States · NTT DATA, Inc.Proposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Compass Goodyear - Building 1Goodyear, Arizona, United States · Compass DatacentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Compass Goodyear - Building 2Goodyear, Arizona, United States · Compass DatacentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Compass Goodyear - Building 3Goodyear, Arizona, United States · Compass DatacentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Compass Goodyear - Building 4Goodyear, Arizona, United States · Compass DatacentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Compass Goodyear - Building 5Goodyear, Arizona, United States · Compass DatacentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Compass Goodyear - Building 6Goodyear, Arizona, United States · Compass DatacentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Compass Goodyear - Building 7Goodyear, Arizona, United States · Compass DatacentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Compass Goodyear - Building 8Goodyear, Arizona, United States · Compass DatacentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Compass Goodyear CampusGoodyear, Arizona, United States · Compass DatacentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Goodyear Airpark CampusGoodyear, Arizona, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Goodyear CampusGoodyear, Arizona, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stream DC Phoenix I - VI , Goodyear CampusGoodyear, Arizona, United States · Stream Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Vantage Phoenix Campus (AZ1)Goodyear, Arizona, United States · Vantage Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Wallace Jackson Data Center CampusGriffin, Georgia, United States · Unknown CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Equinix Hampton CampusHampton, Georgia, United States · EquinixProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Henderson Farms CampusHampton, Georgia, United States · Southeast Property Holdings LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Henderson Farms Campus DC1Hampton, Georgia, United States · Southeast Property Holdings LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Henderson Farms Campus DC2Hampton, Georgia, United States · Southeast Property Holdings LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Henderson Farms Campus DC3Hampton, Georgia, United States · Southeast Property Holdings LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Pumpkin Technology CampusHarlem, Georgia, United States · Cloverleaf InfrastructureProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Pumpkin Technology Campus DC1Harlem, Georgia, United States · Cloverleaf InfrastructureProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Pumpkin Technology Campus DC2Harlem, Georgia, United States · Cloverleaf InfrastructureProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Pumpkin Technology Campus DC3Harlem, Georgia, United States · Cloverleaf InfrastructureProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Pumpkin Technology Campus DC4Harlem, Georgia, United States · Cloverleaf InfrastructureProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS IAD - John Marshall CampusHaymarket, Virginia, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Hermantown - Building 1Hermantown, Minnesota, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Hermantown - Building 2Hermantown, Minnesota, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Hermantown - Building 3Hermantown, Minnesota, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Hermantown - Building 4Hermantown, Minnesota, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Hermantown CampusHermantown, Minnesota, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS CMH - Cosgray CampusHilliard, Ohio, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS CMH - Hayden CampusHilliard, Ohio, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS CMH - Scioto CampusHilliard, Ohio, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
The Homer City Energy CampusHomer City, Pennsylvania, United States · Homer City Redevelopment LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Digital Houston CampusHouston, Texas, United States · Digital RealtyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Nexus Hubbard CampusHubbard, Texas, United States · Nexus Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Iron Mountain Data Centers Hutto CampusHutto, Texas, United States · Iron Mountain Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Nebius Independence CampusIndependence, Missouri, United States · NebiusProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Edged Dallas-Fort Worth DFW01 CampusIrving, Texas, United States · Edged EnergyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
PowerHouse Irving CampusIrving, Texas, United States · PowerHouse Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
QTS Irving CampusIrving, Texas, United States · QTS Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
NTT Chicago CampusItasca, Illinois, United States · NTT DATA, Inc.Proposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS CMH - Beech North CampusJohnstown, Ohio, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS CMH - Beech South CampusJohnstown, Ohio, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS CMH - Newton CampusJohnstown, Ohio, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Cologix Johnstown CampusJohnstown, Ohio, United States · CologixProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
EdgeConneX New Albany - Phase IIJohnstown, Ohio, United States · EdgeConneXProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Vantage OH1 - Building 1Johnstown, Ohio, United States · Vantage Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Vantage OH1 - Building 2Johnstown, Ohio, United States · Vantage Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Vantage OH1 - Building 3Johnstown, Ohio, United States · Vantage Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Vantage OH1 - New Albany CampusJohnstown, Ohio, United States · Vantage Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
EdgeConneX New Albany - Phase IJohnstown, Wyoming, United States · EdgeConneXProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS IAD - Birchwood Drive CampusKing George, Virginia, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Dahlgren West CampusKing George, Virginia, United States · Oasis Digital PropertiesProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
DataBank MCI3 - South Lake CampusLenexa, Kansas, United States · DataBankProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Douglas County CampusLithia Springs, Georgia, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Douglasville - Building 1Lithia Springs, Georgia, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Douglasville - Building 2Lithia Springs, Georgia, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Douglasville - Building 3Lithia Springs, Georgia, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Douglasville - Building 4Lithia Springs, Georgia, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Douglasville CampusLithia Springs, Georgia, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Switch Atlanta - The KEEP CampusLithia Springs, Georgia, United States · SwitchProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Switch The KEEP Campus - Building 1Lithia Springs, Georgia, United States · SwitchProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Switch The KEEP Campus - Building 2Lithia Springs, Georgia, United States · SwitchProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Switch The KEEP Campus - Building 3Lithia Springs, Georgia, United States · SwitchProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Switch The KEEP Campus - Building 4Lithia Springs, Georgia, United States · SwitchProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
T5 Data Centers - T5@Atlanta CampusLithia Springs, Georgia, United States · T5 Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Quinby BuildingLos Angeles, California, United States · Quinby BuildingProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS - Desper Creek Technology CampusLouisa, Virginia, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS - Northeast Creek Technology CampusLouisa, Virginia, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Bolingbroke Technology CampusMacon, Georgia, United States · Bolingbroke Technology Center, LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Bolingbroke Technology Campus - Bldg 1Macon, Georgia, United States · Bolingbroke Technology Center, LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Bolingbroke Technology Campus - Bldg 2Macon, Georgia, United States · Bolingbroke Technology Center, LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Bolingbroke Technology Campus - Bldg 3Macon, Georgia, United States · Bolingbroke Technology Center, LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Bolingbroke Technology Campus - Bldg 4Macon, Georgia, United States · Bolingbroke Technology Center, LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Bolingbroke Technology Campus - Bldg 5Macon, Georgia, United States · Bolingbroke Technology Center, LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Bolingbroke Technology Campus - Bldg 6Macon, Georgia, United States · Bolingbroke Technology Center, LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Bolingbroke Technology Campus - Bldg 7Macon, Georgia, United States · Bolingbroke Technology Center, LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Bolingbroke Technology Campus - Bldg 8Macon, Georgia, United States · Bolingbroke Technology Center, LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Bolingbroke Technology Campus - Bldg 9Macon, Georgia, United States · Bolingbroke Technology Center, LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
GrindCap Marietta CampusMarietta, Georgia, United States · Grind Capital GroupProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS CMH - Project Cosmo CampusMarysville, Ohio, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS PHX - Pecos Road CampusMesa, Arizona, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
EdgeCore Phoenix CampusMesa, Arizona, United States · EdgeCoreProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Mesa - Phase 1Mesa, Arizona, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Mesa - Phase 2Mesa, Arizona, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Mesa - Phase 3Mesa, Arizona, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Mesa CampusMesa, Arizona, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Mesa - Building 1Mesa, Arizona, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Mesa - Building 2Mesa, Arizona, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Mesa - Building 3Mesa, Arizona, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Mesa - Building 4Mesa, Arizona, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Mesa - Building 5Mesa, Arizona, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Mesa CampusMesa, Arizona, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
NTT Elliot Road CampusMesa, Arizona, United States · NTT DATA, Inc.Proposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
NTT Pecos Road CampusMesa, Arizona, United States · NTT DATA, Inc.Proposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS - Lake Anna Tech CampusMineral, Kentucky, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
511 BuildingMinneapolis, Minnesota, United States · Unknown CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS - Project Green CampusNew Florence, Missouri, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Spade CampusNew Florence, Missouri, United States · Unknown CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Flex CampusNew Hudson, Michigan, United States · VerrusProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
The Starrett-Lehigh BuildingNew York, New York, United States · WindstreamProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Niagara Digital CampusNiagara Falls, New York, United States · Urbacon Data Centre SolutionsProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Aligned Chicago CampusNorthlake, Illinois, United States · Aligned Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Omaha - Building 1Omaha, Nebraska, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Omaha - Building 2Omaha, Nebraska, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Omaha - Building 3Omaha, Nebraska, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Omaha - Building 4Omaha, Nebraska, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Omaha CampusOmaha, Nebraska, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
DataBank Orangeburg CampusOrangeburg, New York, United States · DataBankProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Papillion - Building 1Papillion, Nebraska, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Papillion - Building 2Papillion, Nebraska, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Papillion - Building 3Papillion, Nebraska, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Papillion - Building 4Papillion, Nebraska, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Papillion CampusPapillion, Nebraska, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Sarpy CampusPapillion, Nebraska, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Menlo Digital MD-DC3 - Building 1Petersburg, Virginia, United States · Menlo DigitalProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Menlo Digital MD-DC3 - Building 2Petersburg, Virginia, United States · Menlo DigitalProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Menlo Digital MD-DC3 - Building 3Petersburg, Virginia, United States · Menlo DigitalProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Menlo Digital MD-DC3 - Building 4Petersburg, Virginia, United States · Menlo DigitalProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Menlo Digital MD-PX1 - Building 1Phoenix, Arizona, United States · Menlo DigitalProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Menlo Digital MD-PX1 - Building 2Phoenix, Arizona, United States · Menlo DigitalProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Menlo Digital MD-PX1 - Building 3Phoenix, Arizona, United States · Menlo DigitalProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Menlo Digital MD-PX1 - Building 4Phoenix, Arizona, United States · Menlo DigitalProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Menlo Digital MD-PX1 - Building 5Phoenix, Arizona, United States · Menlo DigitalProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
QTS Phoenix CampusPhoenix, Arizona, United States · QTS Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Aligned Plano CampusPlano, Texas, United States · Aligned Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Plano Skies CampusPlano, Texas, United States · Savion Renewable EnergyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Skybox Legacy CampusPlano, Texas, United States · Skybox DatacentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Laurel - Building 1Pottstown, Pennsylvania, United States · Unknown CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Laurel - Building 2Pottstown, Pennsylvania, United States · Unknown CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Laurel - Building 3Pottstown, Pennsylvania, United States · Unknown CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Laurel - Building 4Pottstown, Pennsylvania, United States · Unknown CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Laurel - Building 5Pottstown, Pennsylvania, United States · Unknown CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Laurel - Building 6Pottstown, Pennsylvania, United States · Unknown CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Laurel - Building 7Pottstown, Pennsylvania, United States · Unknown CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Laurel - Building 8Pottstown, Pennsylvania, United States · Unknown CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Laurel CampusPottstown, Pennsylvania, United States · Unknown CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Centeris South Hill CampusPuyallup, Washington, United States · Centeris Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Querétaro 5Queretaro, Mexico · KIO NetworksProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
SDC Quincy CampusQuincy, Nebraska, United States · Sabey Data Center Properties LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
DataBank Red Oak CampusRed Oak, Texas, United States · DataBankProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Lincoln Red Oak CampusRed Oak, Texas, United States · Lincoln Property CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Atlas Agro Richland CampusRichland, Washington, United States · Atlas AgroProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
SDC Austin CampusRound Rock, Texas, United States · Sabey Data Center Properties LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Switch THE ROCK CampusRound Rock, Texas, United States · SwitchProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS SAT - Potranco CampusSan Antonio, Texas, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Equinix Great Oaks South CampusSan Jose, California, United States · EquinixProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Alviso-Milpitas - Building 1San Jose, California, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Alviso-Milpitas - Building 2San Jose, California, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Alviso-Milpitas CampusSan Jose, California, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Orchard Pkwy CampusSan Jose, California, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis San Jose CampusSan Jose, California, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
STACK Infrastructure SVY01 CampusSan Jose, California, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS SFO - Mission College CampusSanta Clara, California, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
EdgeCore Silicon Valley CampusSanta Clara, California, United States · EdgeCoreProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Vantage CA2 - Building 1Santa Clara, California, United States · Vantage Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Vantage CA2 - Building 2Santa Clara, California, United States · Vantage Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Vantage CA2 - Building 3Santa Clara, California, United States · Vantage Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Vantage CA2 -Santa Clara II CampusSanta Clara, California, United States · Vantage Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Santa Clara Campus IISanta, California, United States · Vantage Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
SeattleSeattle, Washington, United States · EdgeConneXProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Dorothy CampusSilverton, Colorado, United States · Soluna ComputingProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Stanton Springs - Building 1Social Circle, Georgia, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Stanton Springs - Building 2Social Circle, Georgia, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Stanton Springs - Building 3Social Circle, Georgia, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Stanton Springs - Building 4Social Circle, Georgia, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Stanton Springs - Building 5Social Circle, Georgia, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Meta Stanton Springs CampusSocial Circle, Georgia, United States · MetaProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Rackspace New York 2Somerset, New Jersey, United States · Rackspace HostingProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Somerset Data CenterSomerset, New Jersey, United States · Carter Validus Mission Critical REITProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Hillcrest CampusSouth Hill, Virginia, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS IAD - Sutton Bay CampusSouth Riding, Virginia, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
TRG Houston CampusSpring, Texas, United States · TRG DatacentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
The Globe BuildingSt. Louis, Missouri, United States · The Globe BuildingProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology CampusStafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 1Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 10Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 11Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 12Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 13Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 14Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 15Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 16Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 17Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 18Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 19Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 2Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 20Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 21Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 22Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 23Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 3Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 4Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 5Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 6Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 7Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 8Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Stafford Technology Campus - Building 9Stafford, Virginia, United States · STACK INFRASTRUCTUREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
KannapolisStates, North Carolina, United States · DataChambersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Coldstream Research CampusStates, United States · CBREProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
EnglewoodStates, United States · Charter CommunicationsProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Tallmadge - Building 1Strasburg, Virginia, United States · Takanock, LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Tallmadge - Building 2Strasburg, Virginia, United States · Takanock, LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
QTS Suwanee 1 CampusSuwanee, Georgia, United States · QTS Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Perkins BuildingTacoma, Washington, United States · Unknown CompanyProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Comal CampusTaylor, Texas, United States · KDCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Mila CampusTrenton, Ohio, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
SDC Seattle CampusTukwila, Washington, United States · Sabey Data Center Properties LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Seattle 1Tukwila, Washington, United States · ZenlayerProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Project Rita - Building 1Tyrone, Georgia, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Project Rita - Building 2Tyrone, Georgia, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Project Rita CampusTyrone, Georgia, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Union City - Building 1Union City, Georgia, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Union City - Building 2Union City, Georgia, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Microsoft Union City - Building 3Union City, Georgia, United States · MicrosoftProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
The Crossings CampusUnion City, Georgia, United States · Link LogisticsProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Van Buren - Building 1Van Buren Township, Michigan, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Van Buren - Building 2Van Buren Township, Michigan, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Van Buren - Building 3Van Buren Township, Michigan, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Google Van Buren CampusVan Buren Township, Michigan, United States · GoogleProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Crusoe Port of Victoria CampusVictoria, Texas, United States · Crusoe CloudProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gateway Digital CampusVilla Ridge, Missouri, United States · Provident Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gateway Digital Campus - Building 1Villa Ridge, Missouri, United States · Provident Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gateway Digital Campus - Building 10Villa Ridge, Missouri, United States · Provident Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gateway Digital Campus - Building 11Villa Ridge, Missouri, United States · Provident Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gateway Digital Campus - Building 12Villa Ridge, Missouri, United States · Provident Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gateway Digital Campus - Building 13Villa Ridge, Missouri, United States · Provident Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gateway Digital Campus - Building 2Villa Ridge, Missouri, United States · Provident Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gateway Digital Campus - Building 3Villa Ridge, Missouri, United States · Provident Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gateway Digital Campus - Building 4Villa Ridge, Missouri, United States · Provident Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gateway Digital Campus - Building 5Villa Ridge, Missouri, United States · Provident Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gateway Digital Campus - Building 6Villa Ridge, Missouri, United States · Provident Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gateway Digital Campus - Building 7Villa Ridge, Missouri, United States · Provident Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gateway Digital Campus - Building 8Villa Ridge, Missouri, United States · Provident Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Gateway Digital Campus - Building 9Villa Ridge, Missouri, United States · Provident Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Baccara - Building 1Waddell, Arizona, United States · Takanock, LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Baccara - Building 2Waddell, Arizona, United States · Takanock, LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Baccara CampusWaddell, Arizona, United States · Takanock, LLCProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
CyrusOne Whitney CampusWhitney, Texas, United States · CyrusOne Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Amazon AWS IAD - Mattermeade CampusWoodford, Virginia, United States · Amazon AWSProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
CyrusOne Yorkville - Building 1Yorkville, Illinois, United States · CyrusOne Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
CyrusOne Yorkville - Building 2Yorkville, Illinois, United States · CyrusOne Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
CyrusOne Yorkville - Building 3Yorkville, Illinois, United States · CyrusOne Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
CyrusOne Yorkville - Building 4Yorkville, Illinois, United States · CyrusOne Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
CyrusOne Yorkville - Building 5Yorkville, Illinois, United States · CyrusOne Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
CyrusOne Yorkville - Building 6Yorkville, Illinois, United States · CyrusOne Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
CyrusOne Yorkville - Building 7Yorkville, Illinois, United States · CyrusOne Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
CyrusOne Yorkville - Building 8Yorkville, Illinois, United States · CyrusOne Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
CyrusOne Yorkville - Building 9Yorkville, Illinois, United States · CyrusOne Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
CyrusOne Yorkville CampusYorkville, Illinois, United States · CyrusOne Data CentersProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Cardinal - Building 1Yorkville, Illinois, United States · Pioneer DevelopmentProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Cardinal - Building 10Yorkville, Illinois, United States · Pioneer DevelopmentProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Cardinal - Building 11Yorkville, Illinois, United States · Pioneer DevelopmentProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Cardinal - Building 12Yorkville, Illinois, United States · Pioneer DevelopmentProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Cardinal - Building 13Yorkville, Illinois, United States · Pioneer DevelopmentProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Cardinal - Building 14Yorkville, Illinois, United States · Pioneer DevelopmentProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Cardinal - Building 2Yorkville, Illinois, United States · Pioneer DevelopmentProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Cardinal - Building 3Yorkville, Illinois, United States · Pioneer DevelopmentProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Cardinal - Building 4Yorkville, Illinois, United States · Pioneer DevelopmentProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Cardinal - Building 5Yorkville, Illinois, United States · Pioneer DevelopmentProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Cardinal - Building 6Yorkville, Illinois, United States · Pioneer DevelopmentProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Cardinal - Building 7Yorkville, Illinois, United States · Pioneer DevelopmentProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Cardinal - Building 8Yorkville, Illinois, United States · Pioneer DevelopmentProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Project Cardinal - Building 9Yorkville, Illinois, United States · Pioneer DevelopmentProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 1Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 10Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 11Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 12Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 13Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 14Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 15Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 16Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 17Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 18Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 19Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 2Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 20Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 21Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 22Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 23Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 24Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 3Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 4Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 5Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 6Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 7Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 8Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
Prologis Project Steel - Building 9Yorkville, Illinois, United States · PrologisProposedinferredutility / powerNDAMoneyWaterPowerATLAS backlog city-level location lead; coordinates are approximate.Project-scale context
How to use this page
Treat confirmed records as immediate research targets. Treat inferred records as location leads that need a local source before publication as a precise proposal. The next enrichment pass should attach public agenda packets, incentive documents, utility filings, water permits, and local reporting to the top-priority rows.
Money: tax abatements, land discounts, bonds, state exemptions, infrastructure reimbursements.