Lacy Lakeview's proposed 520-acre data district has a city annexation and water/sewer MOU trail and developer-stated 925 MW planned capacity, with a 170 MW Phase 1 target. Construction was still planned for November 2026 in the reviewed project timeline, so this record is labeled proposed; no energized or IT-load capacity is confirmed.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area · Target online date
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: the City of Lacy Lakeview's December 2025 agenda concerns a prospective annexation and water/sewer MOU, while the developer describes reclaimed water through the city's wastewater system. These sources do not establish final water service, withdrawal, consumption, or wastewater capacity.
Source reviewed September 9, 2026: Infrakey describes a 925 MW total planned district and a 170 MW Phase 1, including 150 MW of transmission-side capacity associated with a HILCO cooperative MOU and 20 MW distribution-side capacity. These are developer-stated planned/contractual targets; the dataset's 1,000 MW remains unclassified and is not confirmed energized or data-center IT-load capacity.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.