Data
Graphics
Charts, key numbers and project fact sheets built from verified records. Each one states its date, units, sources and what it does not show. Every graphic has its own page and a data table.
Key number
Data-center projects in the proposal watch
1,418 project records
Proposed, under-construction and blocked or paused data-center projects in the United States that Data Center Watch tracks, each linked to its sources.
Sources: Data Center Watch project records; FracTracker Alliance, Open U.S. Data Centers Tracker; Ringmast4r ATLAS, Global Data Center Map
- These are records in Data Center Watch's proposal watch, compiled from FracTracker Alliance's tracker (927 records), Ringmast4r ATLAS city-level placements (462) and local reporting (29). It is not a census of every U.S. project.
- A source confirms the status of 955 records; the status of the other 463 is inferred from the dataset.
Chart
Projects in the proposal watch by status
Data table
| Category | project records |
|---|---|
| Proposed | 1,140 |
| Under construction | 134 |
| Blocked or paused | 144 |
Sources: Data Center Watch project records; FracTracker Alliance, Open U.S. Data Centers Tracker; Ringmast4r ATLAS, Global Data Center Map
- These are records in Data Center Watch's proposal watch, compiled from FracTracker Alliance's tracker (927 records), Ringmast4r ATLAS city-level placements (462) and local reporting (29). It is not a census of every U.S. project.
- A source confirms the status of 955 records; the status of the other 463 is inferred from the dataset.
Chart
Mapped location records by source dataset
Data table
| Category | location records |
|---|---|
| Curated local reporting and manual records | 104 |
| IM3 / OpenStreetMap baseline | 902 |
| FracTracker-derived project and facility records | 1,313 |
| Ringmast4r ATLAS leads | 1,349 |
| PeeringDB facility leads | 796 |
| ATLAS city-level approximate backlog placements | 2,898 |
Sources: IM3 Open Source Data Center Atlas; FracTracker Alliance, Data Centers in the United States; Ringmast4r ATLAS, Global Data Center Map; PeeringDB facilities; Data Center Watch map
- Counts are records as imported from each dataset after duplicates within that dataset were removed; the same facility can appear in more than one dataset.
- City-level placements (2,898) are approximate locations, not site coordinates. Ringmast4r ATLAS contributes 1,349 North American records with coordinates.
Fact sheet
Project Jupiter fact sheet
Project Jupiter, Santa Teresa, Doña Ana County, New Mexico
Status Under construction (confirmed by a source)
- Location
- Santa Teresa, Doña Ana County, New Mexico
- Company, as listed
- Open AI/Oracle
- Size, as listed in the source dataset
- 700 MW reported; Mega campus (>1,000 MW); 3,000,000 sq ft; 1400 acres; expected online 2026
- Power
- Source reviewed September 9, 2026: Oracle says an updated air-quality application replaces the earlier gas-turbine and diesel design with a Bloom fuel-cell microgrid. Bloom separately describes up to 2.45 GW of fuel-cell capacity for the campus. These are planned onsite-generation/project-power figures, not confirmed utility load, energized capacity, or data-center IT load; tariff, interconnection, fuel-supply, and ratepayer records remain separate questions.
- Water
- Source reviewed September 9, 2026: Oracle's updated Project Jupiter power-plan announcement says the fuel-cell microgrid is expected to avoid public drinking water for power generation and data-center cooling and requires only minimal water for power-generation startup fill. The company statement does not publish a facility withdrawal, consumption, cooling, service, or wastewater quantity; those records remain open.
- Money
- Source dataset project_cost field reports $165 billion; public funding records still need local review.
Sources: FracTracker Alliance: Open U.S. Data Centers Tracker; ArcGIS source row: Project Jupiter dataset attributes; El Paso Matters: Dona Ana Billion Dollar Data Center Santa Teresa El Paso Water Meta; El Paso Matters: Project Jupiter Data Center Santa Teresa New Mexico El Paso Texas Water Electricity; KFOX14: Residents Demands Transparency For 165 Billion Santa Teresa Data Center New Mexico NM Dona Ana County Project Jupiter Borderplex Digital; El Paso Matters: Project Jupiter Data Center Santa Teresa Approved Dona Ana Commissioners; Bloomberg: AI Data Center Gets Approval For 165 Billion Phantom Debt Deal; El Paso Matters: Stargate Open AI Oracle Project Jupiter Data Center Dona Ana New Mexico El Paso Texas; Data Center Dynamics: Groups Sue To Stall Data Center Project In Doña Ana County New Mexico; Data Center Dynamics: Oracle Revealed As Tenant Of Project Jupiter Data Center Campus In New Mexico; New Mexico Environmental Law Center: NM Orgs Demand Public Transparency And Access Concerning Project Jupiter Air Quality Permits; Empower New Mexico: Empower New Mexico source; Facebook community group: IndivisibleLASCRUCES; Bloom Energy: Communities Are Right to Ask About the Water Use of AI Infrastructure; Bloom Energy: Bloom Energy and Oracle expand partnership to deploy up to 2.8 GW; Oracle: Public Review Opens for Updated Project Jupiter Power Plan (June 3, 2026)
- Media Monitoring lead with medium location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
Fact sheet
Project Liberty fact sheet
Project Liberty, Marion, South Carolina
Status Blocked or paused (confirmed by a source)
- Location
- Marion, South Carolina
- Company, as listed
- Stream
- Size, as listed in the source dataset
- Hyperscale (100-999 MW); 2,000,000 sq ft; 400 acres; expected online 2027
- Power
- Source review September 9, 2026: Data Center Dynamics reported that Stream withdrew Project Liberty after community opposition and utility power-timing constraints. The dataset's scale label remains unclassified, not confirmed requested, approved, energized, generation, or data-center IT-load capacity.
- Water
- Source review September 9, 2026: public reporting describes environmental concerns, but no reviewed source discloses Project Liberty's water source, withdrawal, consumption, cooling, or wastewater quantities. The dataset's closed-loop label remains an unverified project-design lead.
- Money
- Source dataset project_cost field reports $2.4 billion; public funding records still need local review.
Sources: FracTracker Alliance: Open U.S. Data Centers Tracker; ArcGIS source row: Project Liberty dataset attributes; streamdatacenters.com: Project Liberty; Post and Courier: Article Fce64b6c 7e65 4d99 Ba9a 4d1dc70d28e5; wmbfnews.com: Marion County Data Center Qa Draws Concerns Over Energy Costs Local Hiring; capitalbnews.org: Secret Data Center Deal Marion County South Carolina; Data Center Dynamics: Stream Data Centers Pulls Out Of 800m South Carolina Data Center Says Utility Power Would Take Too Long; More Than Just Parks: Project Liberty: data center in Marion, SC
- Crowdsourced lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
The same graphics are available as structured data at /api/graphics.