Charts, key numbers and project fact sheets built from verified records. Each one states its date, units, sources and what it does not show. Every graphic has its own page and a data table.

Key number

Data-center projects in the proposal watch

1,418 project records

Proposed, under-construction and blocked or paused data-center projects in the United States that Data Center Watch tracks, each linked to its sources.

As of · Unit: project records

Sources: Data Center Watch project records; FracTracker Alliance, Open U.S. Data Centers Tracker; Ringmast4r ATLAS, Global Data Center Map

  • These are records in Data Center Watch's proposal watch, compiled from FracTracker Alliance's tracker (927 records), Ringmast4r ATLAS city-level placements (462) and local reporting (29). It is not a census of every U.S. project.
  • A source confirms the status of 955 records; the status of the other 463 is inferred from the dataset.

Chart

Projects in the proposal watch by status

Projects in the proposal watch by statusBar chart comparing, Projects in the proposal watch by status, in project records. Proposed: 1,140; Under construction: 134; Blocked or paused: 144. As of September 15, 2026. Source: Data Center Watch project records; FracTracker Alliance, Open U.S. Data Centers Tracker; Ringmast4r ATLAS, Global Data Center Map. These are records in Data Center Watch's proposal watch, compiled from FracTracker Alliance's tracker (927 records), Ringmast4r ATLAS city-level placements (462) and local reporting (29). It is not a census of every U.S. project. A source confirms the status of 955 records; the status of the other 463 is inferred from the dataset.Proposed1,140Under construction134Blocked or paused144
Data table
Projects in the proposal watch by status, project records
Categoryproject records
Proposed1,140
Under construction134
Blocked or paused144

As of · Unit: project records

Sources: Data Center Watch project records; FracTracker Alliance, Open U.S. Data Centers Tracker; Ringmast4r ATLAS, Global Data Center Map

  • These are records in Data Center Watch's proposal watch, compiled from FracTracker Alliance's tracker (927 records), Ringmast4r ATLAS city-level placements (462) and local reporting (29). It is not a census of every U.S. project.
  • A source confirms the status of 955 records; the status of the other 463 is inferred from the dataset.

Chart

Mapped location records by source dataset

Mapped location records by source datasetBar chart comparing, Mapped location records by source dataset, in location records. Curated local reporting and manual records: 104; IM3 / OpenStreetMap baseline: 902; FracTracker-derived project and facility records: 1,313; Ringmast4r ATLAS leads: 1,349; PeeringDB facility leads: 796; ATLAS city-level approximate backlog placements: 2,898. As of September 8, 2026. Source: IM3 Open Source Data Center Atlas; FracTracker Alliance, Data Centers in the United States; Ringmast4r ATLAS, Global Data Center Map; PeeringDB facilities; Data Center Watch map. Counts are records as imported from each dataset after duplicates within that dataset were removed; the same facility can appear in more than one dataset. City-level placements (2,898) are approximate locations, not site coordinates. Ringmast4r ATLAS contributes 1,349 North American records with coordinates.Curated local reporting and manual records104IM3 / OpenStreetMap baseline902FracTracker-derived project and facility records1,313Ringmast4r ATLAS leads1,349PeeringDB facility leads796ATLAS city-level approximate backlog placements2,898
Data table
Mapped location records by source dataset, location records
Categorylocation records
Curated local reporting and manual records104
IM3 / OpenStreetMap baseline902
FracTracker-derived project and facility records1,313
Ringmast4r ATLAS leads1,349
PeeringDB facility leads796
ATLAS city-level approximate backlog placements2,898

As of · Unit: location records

Sources: IM3 Open Source Data Center Atlas; FracTracker Alliance, Data Centers in the United States; Ringmast4r ATLAS, Global Data Center Map; PeeringDB facilities; Data Center Watch map

  • Counts are records as imported from each dataset after duplicates within that dataset were removed; the same facility can appear in more than one dataset.
  • City-level placements (2,898) are approximate locations, not site coordinates. Ringmast4r ATLAS contributes 1,349 North American records with coordinates.

Fact sheet

Project Jupiter fact sheet

Project Jupiter, Santa Teresa, Doña Ana County, New Mexico

Status Under construction (confirmed by a source)

Location
Santa Teresa, Doña Ana County, New Mexico
Company, as listed
Open AI/Oracle
Size, as listed in the source dataset
700 MW reported; Mega campus (>1,000 MW); 3,000,000 sq ft; 1400 acres; expected online 2026
Power
Source reviewed September 9, 2026: Oracle says an updated air-quality application replaces the earlier gas-turbine and diesel design with a Bloom fuel-cell microgrid. Bloom separately describes up to 2.45 GW of fuel-cell capacity for the campus. These are planned onsite-generation/project-power figures, not confirmed utility load, energized capacity, or data-center IT load; tariff, interconnection, fuel-supply, and ratepayer records remain separate questions.
Water
Source reviewed September 9, 2026: Oracle's updated Project Jupiter power-plan announcement says the fuel-cell microgrid is expected to avoid public drinking water for power generation and data-center cooling and requires only minimal water for power-generation startup fill. The company statement does not publish a facility withdrawal, consumption, cooling, service, or wastewater quantity; those records remain open.
Money
Source dataset project_cost field reports $165 billion; public funding records still need local review.

As of

Sources: FracTracker Alliance: Open U.S. Data Centers Tracker; ArcGIS source row: Project Jupiter dataset attributes; El Paso Matters: Dona Ana Billion Dollar Data Center Santa Teresa El Paso Water Meta; El Paso Matters: Project Jupiter Data Center Santa Teresa New Mexico El Paso Texas Water Electricity; KFOX14: Residents Demands Transparency For 165 Billion Santa Teresa Data Center New Mexico NM Dona Ana County Project Jupiter Borderplex Digital; El Paso Matters: Project Jupiter Data Center Santa Teresa Approved Dona Ana Commissioners; Bloomberg: AI Data Center Gets Approval For 165 Billion Phantom Debt Deal; El Paso Matters: Stargate Open AI Oracle Project Jupiter Data Center Dona Ana New Mexico El Paso Texas; Data Center Dynamics: Groups Sue To Stall Data Center Project In Doña Ana County New Mexico; Data Center Dynamics: Oracle Revealed As Tenant Of Project Jupiter Data Center Campus In New Mexico; New Mexico Environmental Law Center: NM Orgs Demand Public Transparency And Access Concerning Project Jupiter Air Quality Permits; Empower New Mexico: Empower New Mexico source; Facebook community group: IndivisibleLASCRUCES; Bloom Energy: Communities Are Right to Ask About the Water Use of AI Infrastructure; Bloom Energy: Bloom Energy and Oracle expand partnership to deploy up to 2.8 GW; Oracle: Public Review Opens for Updated Project Jupiter Power Plan (June 3, 2026)

  • Media Monitoring lead with medium location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.

Fact sheet

Project Liberty fact sheet

Project Liberty, Marion, South Carolina

Status Blocked or paused (confirmed by a source)

Location
Marion, South Carolina
Company, as listed
Stream
Size, as listed in the source dataset
Hyperscale (100-999 MW); 2,000,000 sq ft; 400 acres; expected online 2027
Power
Source review September 9, 2026: Data Center Dynamics reported that Stream withdrew Project Liberty after community opposition and utility power-timing constraints. The dataset's scale label remains unclassified, not confirmed requested, approved, energized, generation, or data-center IT-load capacity.
Water
Source review September 9, 2026: public reporting describes environmental concerns, but no reviewed source discloses Project Liberty's water source, withdrawal, consumption, cooling, or wastewater quantities. The dataset's closed-loop label remains an unverified project-design lead.
Money
Source dataset project_cost field reports $2.4 billion; public funding records still need local review.

As of

Sources: FracTracker Alliance: Open U.S. Data Centers Tracker; ArcGIS source row: Project Liberty dataset attributes; streamdatacenters.com: Project Liberty; Post and Courier: Article Fce64b6c 7e65 4d99 Ba9a 4d1dc70d28e5; wmbfnews.com: Marion County Data Center Qa Draws Concerns Over Energy Costs Local Hiring; capitalbnews.org: Secret Data Center Deal Marion County South Carolina; Data Center Dynamics: Stream Data Centers Pulls Out Of 800m South Carolina Data Center Says Utility Power Would Take Too Long; More Than Just Parks: Project Liberty: data center in Marion, SC

  • Crowdsourced lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.

The same graphics are available as structured data at /api/graphics.