Missouri DNR air and wastewater records now provide a dated regulatory trail for Amazon's New Florence Project Green. The dataset's scale remains unclassified; emergency generation and wastewater review do not establish normal utility load, energized capacity, or IT load.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.
Water
Source reviewed September 9, 2026: Missouri DNR opened a public antidegradation review for a proposed domestic wastewater discharge associated with Project Green, and the project's air-permit application identifies Amazon's proposed emergency-generator equipment. These filings establish environmental-review and backup-power context, not a final water withdrawal, cooling consumption, wastewater operating quantity, utility service, or IT load.
Source reviewed September 9, 2026: Missouri DNR's March 2026 construction-permit application is for Amazon's New Florence data-center facility and covers diesel emergency generators; it does not establish the facility's normal utility load or energized service. The existing size label remains unclassified project-scale context pending claim-specific load or interconnection evidence.