Walterboro's proposed Eagle Rock campus remains an early-stage, speculative nine-building proposal. A county-hosted planning packet reproduces developer statements of about 12,000 gallons/day, closed-loop cooling, and 1,000 MW electricity demand; those are attributed planning estimates, not permits, measured use, energized capacity, or IT load.

ProposedconfirmedHigh concern

Site Snapshot

Location
Walterboro, Colleton County, South Carolina
Operator / sponsor
Eagle Rock Partners
Status / stage
Proposed · approval / land-use
Scale
1,000 MW reported; Mega campus (>1,000 MW); 859 acres
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.

Workload classification remains unknown in the reviewed record.

Public Money

The project article reports a developer-stated $6 billion project context, not completed spending or a public subsidy. The reviewed materials do not establish itemized incentives, abatements, public infrastructure contributions, or ratepayer charges.

Water

Source reviewed September 9, 2026: a project article reproduced in an Oconee County planning packet attributes an approximately 12,000-gallons-per-day estimate and closed-loop cooling description to Eagle Rock co-founder Ken Loeber. The estimate is a developer statement, not a permit, service agreement, measured use, or final withdrawal/wastewater quantity; preserve those distinctions.

Power

Source reviewed September 9, 2026: the same project article attributes a 1,000 MW electricity estimate to Eagle Rock's co-founder and says the proposal was speculative without a specific tenant, while the related 2,200 MW Canadys generation project remained in permitting. The dataset's 1,000 MW remains proposed project/utility-demand context, not confirmed requested, approved, energized, generation, or data-center IT-load capacity.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

NDA / Secrecy

No NDA reported

Missing NDA / secrecyFields with source leads: Public money, Water, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.