Status correction: Project Alpaca / Volt Edge Energy in Union County appears paused. FOX Carolina reported Union County tabled first reading of the proposed FILOT ordinance on April 28, 2026, canceled the May 12 public hearing, and said tax breaks would not move forward for now.
ProposedconfirmedHigh concern
Site Snapshot
Location
Union, South Carolina
Operator / sponsor
Volt Edge Energy
Status / stage
Proposed · utility / power
Scale
49 MW reported; Medium (11-50 MW); expected online 2027
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Target online date
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source lead: FOX Carolina reported the proposed FILOT / fee-in-lieu-of-tax agreement was tabled, with the more-than-$400 million project no longer under consideration for now. Keep this as a paused public-money record until reintroduced.
Water source, cooling method, withdrawal permits, and wastewater impacts were not resolved before the county tabled the proposal; reopen local sourcing only if Project Alpaca is reintroduced.
Source lead: dataset reports 49 MW, and Cleanview lists Volt Edge Energy as the planned developer. Utility tariff, interconnection, and ratepayer records should be reviewed only if the project returns.