OpenAI selected SB Energy to build and operate the Milam County site, whose first phase is in construction. The 1.2 GW initial lease/buildout and separate 1,500 MW dataset figure remain project-scale context; no energized or IT-load capacity is established.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
OpenAI and SoftBank each announced a $500 million investment in SB Energy's platform; this is platform investment, not proof of project spending or public subsidy. The dataset's $3 billion project-cost field remains separately unverified.
Water source, cooling method, withdrawal permits, and wastewater impacts need local sourcing.
Power
OpenAI and SB Energy describe a 1.2 GW initial data-center lease/buildout in Milam County and planned new generation to support the site. The dataset's 1,500 MW remains reported project-scale context, separate from energized or IT-load capacity.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.