Media Monitoring lead with medium location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Target online date
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: TigerDC's project page describes the proposed facility as LEED-aligned but does not publish a water source, withdrawal, consumption, cooling, service, or wastewater quantity. The dataset's closed-loop label remains an unverified design lead, and the project was reported withdrawn from Spartanburg County in February 2026.
Source reviewed September 9, 2026: TigerDC's project page described up to 100 MW for Phase I and up to 250 MW total only if a future expansion were pursued; Data Center Dynamics reported the project was withdrawn from Spartanburg County on February 27, 2026. These are historical proposal/power-plan figures, not approved, energized, generation, or data-center IT-load capacity; the dataset's 100-500 MW range remains unreconciled context.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.