Proposed-site record

Cetronia Road Data Center

Air Products' Cetronia Road proposal reached township land-development and zoning review, but the preliminary plan was tabled at the applicant's request and the zoning decision remains the latest official trail. The 2.6-million-square-foot scale does not establish utility, water, energized, or IT-load capacity.

Blocked or pausedconfirmedHigh concern

Site Snapshot

Location
Upper Macungie, Lehigh County, Pennsylvania
Operator / sponsor
Unknown operator
Status / stage
Blocked or paused · blocked / paused
Scale
Hyperscale (100-999 MW); 2,600,000 sq ft; 194 acres
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.

Workload classification remains unknown in the reviewed record.

Data Fields

Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.

NDA / secrecyMissing / needs review
Public moneyMissing / needs review
WaterSource lead attached
PowerSource lead attached

Public Money

No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.

Water

Source reviewed September 9, 2026: Upper Macungie's December 17, 2025 planning minutes describe an application for a 2,600,100-square-foot data-center use with associated waterline, storm sewer, sanitary sewer, and stormwater facilities. The record does not disclose a water-service quantity, cooling withdrawal, consumption, permit, or wastewater capacity.

Power

Source reviewed September 9, 2026: Upper Macungie posted a July 7, 2026 zoning-hearing decision for Air Products' request to permit a data center as a similar use in the LI district; the December planning minutes say the preliminary land-development plan was tabled at the applicant's request. The dataset's hyperscale label remains unclassified project context, not confirmed requested, approved, energized, generation, or IT-load capacity.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

NDA / Secrecy

No NDA reported

Missing NDA / secrecy, Public moneyFields with source leads: Water, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.