Media Monitoring lead with medium location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: AVAIO says the Taurus site has water infrastructure in place, recycled water is an available option, and a new sewer-line extension is under construction for long-term wastewater needs. Its water-efficient cooling and rainwater-recapture statements are design commitments, not measured withdrawal, consumption, or discharge quantities; local service records remain open.
Power
Source reviewed September 9, 2026: AVAIO announced an executed Entergy Mississippi electric-service agreement and a 116 MW first-phase power-capacity target for completion and energization in the first half of 2027. The developer separately advertises larger long-term baseload and grid figures for the campus; the dataset's 116 MW remains planned first-phase project-power context, not proof of energized or data-center IT-load capacity.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.