The Hogansville / Project West proposal has a documented February 2026 90-day moratorium covering the Hightower Road property, and the city has published draft data-center zoning amendments. The reviewed sources do not establish whether a moratorium remains in effect as of September 9, 2026. The 600 MW and reported MEAG cost figures remain proposed utility and planning context, not energized or IT-load capacity or verified public spending.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: GPB reported a MEAG study estimating approximately $300 million in local power-system cost and $153.75 million borne by the customer. These are attributed planning/cost-allocation figures, not verified spending, public subsidy, or an executed rate arrangement.
Source reviewed September 9, 2026: Hogansville's February 2, 2026 council minutes document a 90-day all-inclusive data-center moratorium applying to the Hightower Road property, while the city's comprehensive-plan materials identify the former spray-field/wastewater site. Neither source discloses a facility withdrawal, consumption, cooling method, or wastewater-service quantity.
Source reviewed September 9, 2026: GPB reported that MEAG studied how a 600 MW load could be brought online, while the February city minutes record a temporary moratorium and the city has published draft data-center zoning amendments. The 600 MW remains proposed load context; no approved, energized, generation, or data-center IT-load capacity is established.