Kingsboro Data Center Project

Media Monitoring lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.

Blocked or pausedconfirmedHigh concern

Site Snapshot

Location
Tarboro, Edgecombe County, North Carolina
Operator / sponsor
Energy Storage Solutions
Status / stage
Blocked or paused · blocked / paused
Scale
900 MW reported; Hyperscale (100-999 MW); 155 acres; expected online Buildout by 2028
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area · Target online date

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

Data Center Dynamics reports that Energy Storage Solutions withdrew the proposed Kingsboro development after a special-use permit denial, and Sound Rivers reports the developer withdrew its offer to purchase more than 100 acres at the business park. The developer's project material describes an eight-phase data-center campus, but the reviewed sources do not identify a tenant, facility workload, hardware or training/inference split.

Energy Storage Solutions is the developer, not a disclosed compute customer or operator. The reported $19.2B value, eight phases and varying 300 MW/900 MW project figures are proposal context and not workload capacity; AI wording does not establish training, inference, hardware or allocation.

Sources reviewed; workload unresolved · Reviewed 2026-09-09Training/inference: unknown · class: unknownData Center Dynamics: North Carolina AI data center proposal withdrawn as county officials mull moratoriumEnergy Storage Solutions: Kingsboro Data Center ProjectSound Rivers: Developer withdraws offer for data-center land purchase

Water

Source review September 9, 2026: the reviewed Energy Storage Solutions project summary does not disclose water source, cooling, withdrawal, consumption, or wastewater quantities. The dataset's water fields remain unknown.

Power

Source review September 9, 2026: Energy Storage Solutions' project summary describes a proposed 300 MW AC / 1,200 MWh behind-the-meter generation-and-storage system, with four 25 MW AI data centers and four 50 MW mobile data centers. Data Center Dynamics reports the Kingsboro proposal was withdrawn in July 2026. These source figures are project and generation/storage context; the dataset's 900 MW remains unverified requested, approved, energized, generation, or data-center IT-load capacity.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

NDA / Secrecy

No NDA reported

Missing NDA / secrecyFields with source leads: Public money, Water, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread