Comanche Circle has an approved Hood County concept plan but still requires later site-development review. Proposed private wells, private wastewater treatment, and the separate 2 GW Tolar generation plan are infrastructure context; NRG's generation permit withdrawal leaves the dataset's 600 MW as unclassified project/power context rather than confirmed facility service or IT load.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.
Water
Source reviewed September 9, 2026: KERA reports the Hood County concept plan involves proposed private groundwater wells and a private wastewater plant, while later approval reporting says water, wastewater, drainage, and environmental engineering remain for site-development review. These are proposed service concepts, not a measured withdrawal, service allocation, or wastewater quantity.
Source reviewed September 9, 2026: KERA reports NRG withdrew the application for the proposed 2 GW Tolar Power Center on June 18, 2026; the related Comanche Circle data-center concept remains active. The dataset's 600 MW remains unclassified project/power context, and the withdrawn generation proposal is not energized capacity or data-center IT load.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.