Proposed-site record

Edged Data Center \

Edged's proposed 8 MW Project Gateway in Prichard remains a proposal under evaluation. The developer describes waterless cooling and self-funded power infrastructure, while August 2026 reporting says a proposed temporary city moratorium could affect the project; enacted status, utility service, facility IT load, measured water, wastewater, workload allocation, and public funding remain unresolved.

ProposedconfirmedHigh concern

Site Snapshot

Location
Prichard, Mobile County, Alabama
Operator / sponsor
Edged
Status / stage
Proposed · approval / land-use
Scale
8 MW reported; Small (0-10 MW); expected online 2026
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Target online date

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.

Workload classification remains unknown in the reviewed record.

Public Money

Source reviewed September 9, 2026: Project Gateway's current page attributes a $93 million private investment and says Edged would pay for its own power and equipment upgrades. These are developer-stated investment and cost commitments, not verified public spending, subsidy, or completed infrastructure payment; local tax-abatement, permit, road, and agreement records remain unresolved.

Water

Source reviewed September 9, 2026: Project Gateway's current project page describes Edged's proposed closed-loop waterless cooling and says daily cooling would use zero community water, with an attributed comparison of about 23 million gallons saved annually. These are developer design and projected-comparison claims, not measured withdrawal, consumption, wastewater, or permit quantities; local service and permit records remain unresolved.

Power

Source reviewed September 9, 2026: Project Gateway's current page describes an 8 MW proposed facility and says the developer would manage and pay for its power use and equipment upgrades. Data Center Dynamics reported on August 10, 2026 that Prichard was considering a temporary moratorium that could affect the project, but the reviewed sources do not establish enacted-moratorium terms, utility interconnection, energized capacity, or data-center IT load.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

NDA / Secrecy

No NDA reported

Missing NDA / secrecyFields with source leads: Public money, Water, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.