High-priority La Osa / Vermaland proposal near Red Rock and Eloy. Pinal County planning records document the mixed data-center, generation, and battery-storage land-use request; the county's August 26, 2026 rejection blocks the reviewed proposal, while appeal or redesign status remains unresolved. The dataset's 3,000 MW is not confirmed IT load or energized capacity.
Blocked or pausedconfirmedMedium concern
Site Snapshot
Location
Red Rock, Pinal County, Arizona
Operator / sponsor
Vermaland LLC
Status / stage
Blocked or paused · blocked / paused
Scale
3000 MW reported; Mega campus (>1,000 MW); 3300 acres
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: Pinal County's La Osa planning materials place the site along Greene Canal and Santa Cruz Wash and identify floodplain/open-space constraints, but disclose no water-service quantity, cooling withdrawal, permit, or wastewater capacity. A September 2026 public report says the county rejected the rezoning after the proposal was scaled back; any future appeal or revised filing remains separate.
Source reviewed September 9, 2026: Pinal County planning materials describe data centers alongside a proposed natural-gas-fired power plant, battery storage, existing 115 kV WAPA lines, and a 230 kV APS line. A September 2026 report says the county rejected the La Osa rezoning after the proposal was reduced; the dataset's earlier 3,000 MW remains historical proposed project/power context, not confirmed requested, approved, energized, generation, or data-center IT-load capacity.