Proposed-site record

Vermaland Data Center

High-priority La Osa / Vermaland proposal near Red Rock and Eloy. Pinal County planning records document the mixed data-center, generation, and battery-storage land-use request; the county's August 26, 2026 rejection blocks the reviewed proposal, while appeal or redesign status remains unresolved. The dataset's 3,000 MW is not confirmed IT load or energized capacity.

Blocked or pausedconfirmedMedium concern

Site Snapshot

Location
Red Rock, Pinal County, Arizona
Operator / sponsor
Vermaland LLC
Status / stage
Blocked or paused · blocked / paused
Scale
3000 MW reported; Mega campus (>1,000 MW); 3300 acres
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.

Workload classification remains unknown in the reviewed record.

Water

Source reviewed September 9, 2026: Pinal County's La Osa planning materials place the site along Greene Canal and Santa Cruz Wash and identify floodplain/open-space constraints, but disclose no water-service quantity, cooling withdrawal, permit, or wastewater capacity. A September 2026 public report says the county rejected the rezoning after the proposal was scaled back; any future appeal or revised filing remains separate.

Power

Source reviewed September 9, 2026: Pinal County planning materials describe data centers alongside a proposed natural-gas-fired power plant, battery storage, existing 115 kV WAPA lines, and a 230 kV APS line. A September 2026 report says the county rejected the La Osa rezoning after the proposal was reduced; the dataset's earlier 3,000 MW remains historical proposed project/power context, not confirmed requested, approved, energized, generation, or data-center IT-load capacity.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

NDA / Secrecy

No NDA reported

Missing NDA / secrecyFields with source leads: Public money, Water, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.