Related Digital's The Barn is an under-construction Saline Township campus for Oracle and its customer OpenAI. The developer's current project page distinguishes closed-loop cooling from a proposed treated-sanitary-wastewater discharge under EGLE permit MI0060445; neither source establishes cooling water quantity or data-center IT load.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: Related Digital says The Barn uses closed-loop air cooling rather than evaporative cooling, with ongoing water use described as comparable to a normal office building. Its project page also identifies EGLE permit MI0060445 for treated sanitary wastewater from restrooms and sinks, explicitly separating that discharge from cooling-system water and industrial coolant. No reviewed source publishes a cooling withdrawal, consumption, or wastewater-service quantity.
Source reviewed September 9, 2026: the Michigan Public Service Commission's December 18, 2025 conditional approval describes a 1,383 MW contracted data-center load for Green Chile Ventures in Saline Township and a matching 1,383 MW energy-storage obligation; Related Digital's project page describes a campus with more than one gigawatt of gross capacity. These are contracted utility-service and project-scale figures, not proof of energized capacity or data-center IT load, and the 1,400 MW dataset value remains a rounded project-context figure.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.