Thunderbird Commerce Center Project

Indianapolis records document DC BLOX's variance and replat path for the Thunderbird site, while the developer's plan describes phased buildings and an existing substation. The dataset's reported 100 MW remains unclassified project/power context; no facility IT load, energized capacity, or measured water/wastewater quantity is established.

Under constructionconfirmedHigh concern

Site Snapshot

Location
Indianapolis, Marion County, Indiana
Operator / sponsor
DC Blox
Status / stage
Under construction · under construction
Scale
100 MW reported; Hyperscale (100-999 MW); 320,000 sq ft; expected online 2028
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Target online date

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.

Workload classification remains unknown in the reviewed record.

Water

Source reviewed September 9, 2026: DC BLOX's public Indianapolis materials describe an air-cooled system and a community protection pledge, while the Metropolitan Development Commission packet includes water-conservation and air-cooled-water-system documents. The reviewed record does not establish a water-service agreement, withdrawal, consumption, cooling, or wastewater quantity.

Power

Source reviewed September 9, 2026: Indianapolis's July 15, 2026 hearing record approved the variance and replat path for a data center of up to 420,000 square feet, and DC BLOX's May plan of operation identifies an existing substation for reliable power delivery. The dataset's 100 MW remains reported project/power context, not a confirmed requested, approved, energized, generation, or data-center IT-load figure.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

NDA / Secrecy

No NDA reported

Missing NDA / secrecyFields with source leads: Public money, Water, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.