Alaska DNR's May 12, 2026 preliminary decision documents a proposed 715.4-acre state-land lease for STAK's industrial energy campus, including modular HPC buildings and 1–3 GW of behind-the-meter natural-gas generation. The lease, generation, construction timeline, water, and workload capacity remain subject to unresolved approvals and evidence gaps.

ProposedconfirmedMedium concern

Site Snapshot

Location
North Slope Borough, North Slope County, Alaska
Operator / sponsor
Stak
Status / stage
Proposed · utility / power
Scale
3000 MW reported; Mega campus (>1,000 MW); 715 acres; expected online 2028
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area · Target online date

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.

Workload classification remains unknown in the reviewed record.

Public Money

No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.

Water

Source reviewed September 9, 2026: Alaska DNR's May 12, 2026 preliminary decision describes a proposed 715.4-acre lease area and associated industrial infrastructure but does not establish a water source, withdrawal quantity, cooling-water use, or wastewater capacity.

Power

Source reviewed September 9, 2026: Alaska DNR's May 12, 2026 preliminary decision says the proposed STAK Energy Campus would include natural-gas generation designed for 1–3 GW, with all generated electricity consumed onsite by HPC facilities in a fully integrated behind-the-meter configuration and no utility-grid interconnection. The dataset's 3,000 MW remains proposed generation/project context, not confirmed energized or IT-load capacity.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

NDA / Secrecy

No NDA reported

Missing NDA / secrecy, Public moneyFields with source leads: Water, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.