Proposed-site record

Fibernet MercuryDelta Campus/Delta Gigasite

Millard County minutes and Utah's economic-development announcement add application and planned behind-the-meter power context to the Delta Gigasite lead. The 2,000-10,000 MW range remains unclassified project/power context; no energized or workload-specific capacity is established.

ProposedconfirmedMedium concern

Site Snapshot

Location
Delta, Millard County, Utah
Operator / sponsor
Fibernet MercuryDelta
Status / stage
Proposed · approval / land-use
Scale
2000-10000 MW reported; Mega campus (>1,000 MW); 20,000,000 sq ft; 1200 acres
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.

Workload classification remains unknown in the reviewed record.

Public Money

No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.

Water

Source reviewed September 9, 2026: Utah's economic-development announcement describes the Creekstone Gigasite as a planned AI/data-center campus with no evaporative water use for cooling. The developer/state description does not establish a water right, service quantity, withdrawal, consumption, cooling, or wastewater measurement.

Power

Source reviewed September 9, 2026: the Utah Governor's Office describes a 10 GW capacity target for the behind-the-meter power-and-AI campus, and Millard County minutes identify Fibernet MercuryDelta as an applicant pursuing a data-center project with a generation component. These are company/state planned power and project-scale claims plus county application context, not confirmed requested, approved, energized, generation nameplate, or data-center IT-load capacity.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

NDA / Secrecy

No NDA reported

Missing NDA / secrecy, Public moneyFields with source leads: Water, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.