Stratos is a proposed Box Elder County project area backed by MIDA and O'Leary Ventures; the county says full construction is not approved and the exact plan is not finalized. Its 9,000 MW remains attributed ultimate project-scale context, while water rights, measured use, wastewater, energized capacity, IT load, and public-money records remain unresolved.
ProposedconfirmedHigh concern
Site Snapshot
Location
Snowville, Box Elder County, Utah
Operator / sponsor
Unknown operator
Status / stage
Proposed · approval / land-use
Scale
9000 MW reported; Mega campus (>1,000 MW); 40000 acres
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
The Stratos project-area site says the development team committed to fund public infrastructure and $16.2 million in up-front county service-impact funding. This is a developer-site commitment claim, not verified public spending, subsidy, bond proceeds, or a completed payment; local agreements and disbursement records remain open.
Source reviewed September 9, 2026: Box Elder County describes Stratos as a proposed development whose exact plan is not finalized; its background materials attribute closed-loop chilling, dry cooling, and existing agricultural-water-rights plans to the proposal, while later reporting says the initial water-rights application was withdrawn and may be resubmitted. These are planning statements, not a granted water right, measured use, service quantity, or wastewater capacity.
Source reviewed September 9, 2026: Box Elder County's FAQ says full construction is not approved and describes Stratos as a proposed development that may include a data center and onsite power plant. The project's own site states 3 GW for Phase 1 and 9 GW at full buildout; the dataset's 9,000 MW remains attributed ultimate project-scale/generation-and-energy-user context, not confirmed data-center IT load or energized capacity.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.