Project Stratos Eastern

Stratos is a proposed Box Elder County project area backed by MIDA and O'Leary Ventures; the county says full construction is not approved and the exact plan is not finalized. Its 9,000 MW remains attributed ultimate project-scale context, while water rights, measured use, wastewater, energized capacity, IT load, and public-money records remain unresolved.

ProposedconfirmedHigh concern

Site Snapshot

Location
Snowville, Box Elder County, Utah
Operator / sponsor
Unknown operator
Status / stage
Proposed · approval / land-use
Scale
9000 MW reported; Mega campus (>1,000 MW); 40000 acres
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.

Workload classification remains unknown in the reviewed record.

Public Money

The Stratos project-area site says the development team committed to fund public infrastructure and $16.2 million in up-front county service-impact funding. This is a developer-site commitment claim, not verified public spending, subsidy, bond proceeds, or a completed payment; local agreements and disbursement records remain open.

Water

Source reviewed September 9, 2026: Box Elder County describes Stratos as a proposed development whose exact plan is not finalized; its background materials attribute closed-loop chilling, dry cooling, and existing agricultural-water-rights plans to the proposal, while later reporting says the initial water-rights application was withdrawn and may be resubmitted. These are planning statements, not a granted water right, measured use, service quantity, or wastewater capacity.

Power

Source reviewed September 9, 2026: Box Elder County's FAQ says full construction is not approved and describes Stratos as a proposed development that may include a data center and onsite power plant. The project's own site states 3 GW for Phase 1 and 9 GW at full buildout; the dataset's 9,000 MW remains attributed ultimate project-scale/generation-and-energy-user context, not confirmed data-center IT load or energized capacity.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

NDA / Secrecy

No NDA reported

Missing NDA / secrecyFields with source leads: Public money, Water, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.