Townsite Solar 2 LLC (same as Clearway project that is now canceled?)
Media Monitoring lead with medium location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.
Water
Boulder City's official TS2 page describes a proposed air-cooled closed-loop system with no evaporative cooling, potable water limited to restrooms and a small kitchen, and approximately 90% of potable use returned through a planned sewer line. It also says construction could seek up to 500,000 gallons per day of city-treated wastewater for dust control. These are proposal claims, not measured operating use or final permits.
Boulder City's official TS2 page describes a project-funded 230kV line from Mead, dedicated project infrastructure, and a proposed 167 MW peak demand. The proposal was withdrawn July 6, 2026; the dataset's 170 MW remains historical proposed project-demand context, not approved, energized, generation, or IT-load capacity.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.