Crowdsourced lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
Proposedconfirmed
Site Snapshot
Location
Point Pleasant, Mason County, West Virginia
Operator / sponsor
Nscale (acquired American Intelligence & Power; site formerly associated with Fidelis)
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area · Target online date
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Nscale's current Monarch page reports more than $20 billion in planned capital investment and $80 million-plus in annual West Virginia tax revenue, including a projected $40 million for Mason County schools. These are company-stated plans/projections, not completed spending, public subsidy, or verified receipts; the source dataset's $5 billion project-cost lead remains historical context.
Nscale's current Monarch page describes closed-loop cooling and says no municipal drinking water is used for operations. This is a company operating-design claim; the reviewed public material does not establish a water withdrawal, discharge, permit quantity, or measured consumption.
Nscale's March 16, 2026 release describes an onsite microgrid with 2 GW expected online in the first half of 2028 and expansion to approximately 8 GW planned for 2031. Its Monarch page separately describes 1.35 GW of Phase 1 AI computing capacity. These are company-stated planned generation/power and compute-capacity contexts, not energized capacity or an independently verified IT-load measurement; the dataset's 2,000-8,000 MW remains unclassified.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.