Proposed-site record

Project Liberty

Crowdsourced lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.

Blocked or pausedconfirmedHigh concern

Site Snapshot

Location
Marion, South Carolina
Operator / sponsor
Stream
Status / stage
Blocked or paused · blocked / paused
Scale
Hyperscale (100-999 MW); 2,000,000 sq ft; 400 acres; expected online 2027
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area · Target online date

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

Stream says utility power could not be sourced within the required timeframe and Project Liberty will not move forward. Its project FAQ says the ultimate use had not been determined and that customers decide what technology and workloads are processed; secondary reporting adds the approved project's proposed water-demand and community-funding context. None discloses a facility-specific workload, hardware or training/inference split.

Stream's cancellation statement establishes a development-status update, not a workload disclosure. Its FAQ expressly leaves ultimate use undetermined and describes cloud/AI capability at the facility level; customer choice of technology does not establish a customer, operator workload, training/inference split, hardware or capacity allocation. Do not treat the project's prior scale as workload capacity.

Sources reviewed; workload unresolved · Reviewed 2026-09-09Training/inference: unknown · class: unknownStream Data Centers: Marion County Data Center Campus — Project LibertyData Center Dynamics: Stream Data Centers pulls out of $800m South Carolina data center

Water

Source review September 9, 2026: public reporting describes environmental concerns, but no reviewed source discloses Project Liberty's water source, withdrawal, consumption, cooling, or wastewater quantities. The dataset's closed-loop label remains an unverified project-design lead.

Power

Source review September 9, 2026: Data Center Dynamics reported that Stream withdrew Project Liberty after community opposition and utility power-timing constraints. The dataset's scale label remains unclassified, not confirmed requested, approved, energized, generation, or data-center IT-load capacity.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

Core tracking fields have source leads attachedFields with source leads: NDA / secrecy, Public money, Water, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.