LandBridge and PowerBridge have a lease-development agreement for a proposed West Texas campus, with site entitlements, private power, interconnection, water, and customer details still subject to ongoing work. The dataset's 2,000 MW remains planned project/generation context rather than confirmed IT load or energized capacity.
ProposedconfirmedMedium concern
Site Snapshot
Location
Between Odessa and Pecos, Reeves County, Texas
Operator / sponsor
Unknown operator
Status / stage
Proposed · approval / land-use
Scale
2000 MW reported; Mega campus (>1,000 MW); 3400 acres
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.
Water
LandBridge describes West Texas as having significant water availability, but the April 2026 lease-development announcement does not disclose a project water allocation, cooling method, withdrawal permit, wastewater capacity, or operating-use quantity. Those remain unresolved.
LandBridge's April 2, 2026 announcement describes an option to lease up to approximately 3,400 acres for the Alpha Digital Campus and up to 2 GW of initial co-located power generation under development by PowerBridge and its partners. PowerBridge says it filed generation-interconnection and data-center-load details, but the announcement does not establish approved, energized, or data-center IT-load capacity; the dataset's 2,000 MW remains planned project/generation context.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.