High-priority Sullivan County proposal at Heartland Industrial Park. Public project materials and DCD reporting give unusually specific power and community-commitment claims; keep source-lead status until owner review attaches utility and county agreements.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area · Target online date
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source lead: DCD reported Fluidstack did not seek tax incentives for Phase I and committed $50 million to Sullivan County government through an enhancement agreement, split across phases. Agreement text and county records still need review.
Source lead: Sullivan County project materials say the campus uses a closed-loop cooling system designed for low water use. Water-source, withdrawal, sewer, wastewater, and permit records still need review.
Source reviewed September 9, 2026: Fluidstack's project page says it will pay for the energy and energy infrastructure, with WIN Energy as provider and energy already available; its target is operations in 2027. April 16, 2026 financing coverage describes a 245 MW IT-capacity turnkey data center and a separate 185 MW critical-IT-capacity turnkey data center, while DCD also reports a first 430 MW phase within a larger 2.1 GW plan. Keep the dataset's 430 MW as reported project context: these disclosed IT-capacity components and the broader phase figure must not be treated as energized capacity or as a single interchangeable total; utility contracts, interconnection, tariff, and ratepayer records remain separate review leads.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.