Salem Township Amazon Data Center

SRBC records an approved 0.1290-MGD 30-day-average consumptive-use quantity for Amazon's PHL100 campus and identifies evaporative cooling and public-sewer discharge in the application. The 960 MW remains unclassified project/power context, separate from energized or IT-load capacity; total withdrawal, workload allocation, and public subsidy remain unresolved.

Under constructionconfirmedHigh concern

Site Snapshot

Location
Wapwallopen, Luzerne County, Pennsylvania
Operator / sponsor
Amazon
Status / stage
Under construction · under construction
Scale
960 MW reported; Hyperscale (100-999 MW); 1582 acres; part of Amazon's $20B Pennsylvania investment
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area · Investment context

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.

Workload classification remains unknown in the reviewed record.

Public Money

Source reviewed September 9, 2026: Amazon and Pennsylvania describe at least $20 billion of planned private investment across Pennsylvania campuses, including Salem Township. No reviewed source establishes a project-specific public subsidy or completed public spending amount.

Water

Source reviewed September 9, 2026: the Susquehanna River Basin Commission approved Amazon Data Services' PHL100 Data Center Campus for 0.1290 million gallons per day of 30-day-average consumptive use on March 12, 2026; the application identifies evaporative cooling, added water sources, and public-sewer discharges. This is an approved consumptive-use quantity, not total withdrawal, facility consumption, or proof of cooling operations at every campus phase.

Power

Source reviewed September 9, 2026: Amazon's Salem Township page describes a campus expected to contain 20 data centers and identifies Talen's existing infrastructure and withdrawal docket for water. The dataset's 960 MW nuclear-backed figure remains unclassified project/power context; no reviewed source establishes energized or data-center IT-load capacity.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

NDA / Secrecy

No NDA reported

Missing NDA / secrecyFields with source leads: Public money, Water, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.