SRBC records an approved 0.1290-MGD 30-day-average consumptive-use quantity for Amazon's PHL100 campus and identifies evaporative cooling and public-sewer discharge in the application. The 960 MW remains unclassified project/power context, separate from energized or IT-load capacity; total withdrawal, workload allocation, and public subsidy remain unresolved.
Under constructionconfirmedHigh concern
Site Snapshot
Location
Wapwallopen, Luzerne County, Pennsylvania
Operator / sponsor
Amazon
Status / stage
Under construction · under construction
Scale
960 MW reported; Hyperscale (100-999 MW); 1582 acres; part of Amazon's $20B Pennsylvania investment
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area · Investment context
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: Amazon and Pennsylvania describe at least $20 billion of planned private investment across Pennsylvania campuses, including Salem Township. No reviewed source establishes a project-specific public subsidy or completed public spending amount.
Source reviewed September 9, 2026: the Susquehanna River Basin Commission approved Amazon Data Services' PHL100 Data Center Campus for 0.1290 million gallons per day of 30-day-average consumptive use on March 12, 2026; the application identifies evaporative cooling, added water sources, and public-sewer discharges. This is an approved consumptive-use quantity, not total withdrawal, facility consumption, or proof of cooling operations at every campus phase.
Source reviewed September 9, 2026: Amazon's Salem Township page describes a campus expected to contain 20 data centers and identifies Talen's existing infrastructure and withdrawal docket for water. The dataset's 960 MW nuclear-backed figure remains unclassified project/power context; no reviewed source establishes energized or data-center IT-load capacity.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.