Media Monitoring lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.
Water
Source review September 9, 2026: the reviewed city planning materials and PowerConneX notices do not disclose a facility water source, cooling method, withdrawal permit, wastewater capacity, or operating-use quantity. Those remain unresolved.
Source review September 9, 2026: New Albany identifies PowerConneX as natural-gas-fired generation intended to supply EdgeConneX data-center operations; the first phase received an Ohio Power Siting Board construction certificate and construction began in September 2025. The dataset's 120–766 MW remains an unreconciled project/power range, not confirmed requested, approved, energized, generation, or data-center IT-load capacity for this record.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.