Media Monitoring lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
Under constructionconfirmedHigh concern
Site Snapshot
Location
Independence, Jackson County, Missouri
Operator / sponsor
Patmos
Status / stage
Under construction · under construction
Scale
880 MW reported; Hyperscale (100-999 MW); 2,500,000 sq ft
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: Nebius describes a closed-loop cooling design, a one-time fill of about 1 million gallons per 200 MW system, and recurring annual use of 400,000-640,000 gallons for staff and process support. These are company project-design statements, not a substitute for local water, wastewater, or permit records.
Source reviewed September 9, 2026: Nebius describes a facility sized up to 1.2 GW, with 800 MW of power associated with Independence Power & Light and 400 MW of planned onsite generation; the City of Independence says the project is outside its later moratorium because it was already submitted, authorized, or approved. These remain planned utility/generation and project-scale contexts, not confirmed energized capacity or data-center IT load; the dataset's 880 MW remains unclassified.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.