High-priority Wilsonville / Shelby County proposal from Northpoint Development. The prior display name incorrectly conflated this site with the separate VoltCore bitcoin-mine proposal in Somerville / Morgan County; this record now tracks the Wilsonville data center.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.
Water
Source reviewed September 9, 2026: Inside Climate News reported that the Wilsonville feasibility plan said developers still needed to verify available water volume and wastewater-treatment capacity. No reviewed source discloses a withdrawal, consumption, service, or discharge quantity; water and wastewater remain unresolved.
Power
Source reviewed September 9, 2026: Inside Climate News reported the feasibility plan's projected peak power demand of 1,008 MW and said the power source, substation size, and location were still subject to verification or adjustment. The dataset's 1,008 MW therefore remains reported planned peak/project context, not approved utility load, generation capacity, energized capacity, or data-center IT load.