Proposed-site record

Project Lincoln: OC Data Center

Media Monitoring lead with high location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.

Blocked or pausedconfirmedHigh concern

Site Snapshot

Location
La Grange, Oldham County, Kentucky
Operator / sponsor
Unknown operator
Status / stage
Blocked or paused · blocked / paused
Scale
600 MW reported; Hyperscale (100-999 MW); 267 acres
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

Oldham County's official Project Lincoln page links withdrawal documents submitted by Western Hospitality Partners. Data Center Dynamics reports that the 150-day moratorium put the project on hold, while Kentucky Public Service Commission testimony describes the revised project as a 100 MW prospect without an EPC; the earlier concept was 600 MW. These status and project-scale records do not identify a tenant or facility workload.

Western Hospitality Partners is identified as the developer/proponent, not a disclosed compute customer or operator. The official county page confirms that withdrawal documents were submitted, but does not add a workload disclosure. Keep the record's reported 600 MW project-scale figure distinct from the PSC testimony's 100 MW prospect entry; neither is workload capacity or an operating measurement.

Sources reviewed; workload unresolved · Reviewed 2026-09-09Training/inference: unknown · class: unknownKentucky Public Service Commission: Direct Testimony of Elizabeth A. Stanton, PhD — Case No. 2025-00045Data Center Dynamics: Kentucky’s Oldham County passes 150-day data center moratoriumOldham County Fiscal Court: Project Lincoln Data Center withdrawal documents

Water

Source review September 9, 2026: the withdrawn Highway 53 proposal's reviewed record does not disclose water source, cooling, withdrawal, consumption, or wastewater quantities. A smaller Commerce Parkway application is a separate project path and should not be merged into this record.

Power

Source review September 9, 2026: LG&E/KU regulatory filings identify Project Lincoln as an anticipated 600 MW data-center demand lead, while Data Center Dynamics reports the original Highway 53 application was withdrawn and replaced by a smaller site. The 600 MW remains proposed project/utility-demand context, not confirmed requested, approved, energized, generation, or data-center IT-load capacity.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

NDA / Secrecy

No NDA reported

Missing NDA / secrecyFields with source leads: Public money, Water, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.