La Pine's city council unanimously closed the proposed Boxminer industrial-land sale matter on May 27, 2026 after staff reported unsupported revenue, employment, and utility-system assumptions. The 20 MW remains proposed load context; facility water, wastewater, energized capacity, IT load, workload allocation, and public funding remain unresolved.
Blocked or pausedconfirmedHigh concern
Site Snapshot
Location
La Pine, Deschutes County, Oregon
Operator / sponsor
Box Miner
Status / stage
Blocked or paused · blocked / paused
Scale
20 MW reported; Unknown; 20 acres
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: Boxminer described a proposed closed-loop design in public reporting, but the City of La Pine's May 27 council packet does not disclose a permitted withdrawal, consumption, cooling-service quantity, or wastewater discharge. Preserve the closed-loop description as attributed proposal context, not measured water performance.
Source reviewed September 9, 2026: the City of La Pine's May 27, 2026 council packet says Midstate Electric had no established rate schedule for a 20 MW load and that any rate would require negotiation and board approval. The city's unanimous decision closed the proposed property-sale matter. The dataset's 20 MW remains proposed load context, not approved, energized, generation, or data-center IT-load capacity.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.