Proposed-site record

Google Abernathy Data Center

Media Monitoring lead with low location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.

Blocked or pausedconfirmedMedium concern

Site Snapshot

Location
Abernathy, Hale County, Texas
Operator / sponsor
Fluidstack/TeraWulf/Google
Status / stage
Blocked or paused · blocked / paused
Scale
168-240 MW reported; Hyperscale (100-999 MW); 120 acres; expected online 2026
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area · Target online date

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.

Workload classification remains unknown in the reviewed record.

Water

Water source, cooling method, withdrawal permits, and wastewater impacts need local sourcing.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

NDA / Secrecy

No NDA reported

Missing NDA / secrecy, WaterFields with source leads: Public money, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.