Prometheus Hyperscale's Evanston campus has a Uinta County conditional-use approval and a stated closed-loop, no-local-water design. The developer describes behind-the-meter generation supporting up to 1.5 GW of Phase 1 data halls and a possible 5 GW scale-up, but these remain planned figures distinct from energized or operating IT load; public-money and facility water quantities remain unresolved.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area · Target online date
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: Prometheus materials describe a flagship project and local infrastructure arrangements, but the reviewed sources do not establish a public subsidy, tax abatement, public spending amount, or completed investment. Keep public-money fields unknown.
Source reviewed September 9, 2026: Prometheus Hyperscale says the Evanston campus will use closed-loop liquid cooling with no draw from local water supplies and projects annual campus water consumption roughly equivalent to 15 homes. This is a developer projection and design claim, not a measured operating quantity, water right, wastewater-service amount, or final permit condition.
Source reviewed September 9, 2026: Uinta County approved the campus conditional-use permit, while Prometheus describes behind-the-meter dual-fuel generation designed to support up to 1.5 GW of Phase 1 data-hall capacity and a longer-term opportunity to scale to 5 GW. These are planned generation and company-stated data-hall figures; the dataset's 1,250 MW remains unclassified project/power context rather than confirmed energized or operating IT load.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.