Taylor approved Project Comal's employment-center plan for KDC's proposed six-building campus, but the city says water needs and a water-service agreement remain unresolved. The 360 MW remains project-scale power context; energized capacity, IT load, facility water, wastewater, workload, and public-money amounts remain unknown.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: Taylor's project page presents projected future city and school-district tax revenue if the project proceeds. These projections are not completed spending, a subsidy, or a verified project-specific incentive amount.
Source reviewed September 9, 2026: Taylor's official Project Comal page says the property is within the city's water-service area, but KDC had not requested a water-service agreement and the city did not know the project's water requirement. KDC's proposed air-cooled chillers and closed-loop system are design context, not a measured withdrawal, consumption, or wastewater-service quantity.
Source reviewed September 9, 2026: Taylor approved the employment-center plan on March 26, 2026, and city materials describe KDC's proposed six-building project with two substations; the city's council presentation identifies Oncor as the planned utility. The dataset's 360 MW remains proposed project/power context, not confirmed energized or data-center IT-load capacity.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.