Proposed-site record

Fermi America HyperGrid/ Project Matador

Fermi's current materials document site progress and a planned private-energy campus intended to serve hyperscale AI and advanced computing. The NRC reactor application is under review rather than a reactor operating license; the 11,000-17,000 MW remains generation/project context, and no reviewed source establishes data-center IT load, energized capacity, workload allocation, measured water use, or public funding.

Under constructionconfirmedHigh concern

Site Snapshot

Location
Amarillo, Carson County, Texas
Operator / sponsor
Fermi America and Texas Tech
Status / stage
Under construction · under construction
Scale
11,000-17,000 MW reported; Mega campus (>1,000 MW); 18,000,000 sq ft; 5769 acres; expected online 2026
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area · Target online date

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.

Workload classification remains unknown in the reviewed record.

Public Money

No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.

Water

Fermi says Project Matador will pay twice the standard Amarillo municipal water rate and build water infrastructure at its own cost; the source does not establish a measured withdrawal, final service quantity, or operating use.

Power

Source reviewed September 9, 2026: Fermi's current progress materials describe Project Matador as a planned private power and AI campus projected at 17 GW, with approximately 2 GW of secured long-lead gas-generation assets. The NRC records a partially submitted, docketed combined-license application for four AP1000 reactors, with remaining licensing milestones unresolved. The dataset's 11,000-17,000 MW remains planned private-power/generation and campus context, not confirmed data-center IT load or energized capacity.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

NDA / Secrecy

No NDA reported

Missing NDA / secrecy, Public moneyFields with source leads: Water, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.