Sterling Data Center

Granite Renewables' Sterling-area lead remains an early-stage proposed project. Official Logan County minutes document the county's rulemaking context and an approximately 2 GW concept with separate planned generation, solar, and storage components; no formal application, facility water quantity, utility approval, energized capacity, IT load, or public funding amount is established.

ProposedconfirmedHigh concern

Site Snapshot

Location
Sterling, Logan County, Colorado
Operator / sponsor
Granite Renewables
Status / stage
Proposed · utility / power
Scale
2000 MW reported; Mega campus (>1,000 MW); 4198 acres
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.

Workload classification remains unknown in the reviewed record.

Public Money

Source lead: dataset project_cost field reports $15 billion. Logan County regulation and moratorium records show local governance activity, but incentive, abatement, infrastructure, land, and public-cost records still need review.

Water

Source reviewed September 9, 2026: Logan County's official October 14, 2025 commissioners minutes describe a proposed Granite Renewables project near County Road 9 but do not establish a cooling method, water source, water right, withdrawal, consumption, or wastewater quantity. Preserve the earlier regional-water concern as unresolved context, not facility use.

Power

Source reviewed September 9, 2026: Logan County minutes describe a proposal near County Road 9 with close to 2 GW nameplate capacity, including approximately 1 GW of onsite natural-gas generation, 630 MW of solar, and 1,800 MWh of storage. These are reported planned generation/project figures; no utility request, approval, energized capacity, or data-center IT load is established.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

NDA / Secrecy

No NDA reported

Missing NDA / secrecyFields with source leads: Public money, Water, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.