Media Monitoring lead with medium location confidence. Use the linked sources to verify status, public money, NDA/secrecy, water, and power details before treating this as a fully documented local record.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area · Target online date
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.
Water
Water source, cooling method, withdrawal permits, and wastewater impacts need local sourcing.
Power
Source reviewed September 9, 2026: Green Data's May 2026 community FAQ described a proposed 2 GW renewable-powered data center with onsite solar, storage, and backup grid interconnection; Data Center Dynamics reported the earlier 10 GW solar / 2 GW data-center concept and no formal application at that time. New Mexico Tech later declined to proceed and Socorro County adopted a one-year moratorium, according to public reporting. The dataset's 2,000 MW remains proposed project-scale context, not confirmed utility load, generation, energized capacity, or data-center IT load.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.