El Segundo's current official project page records that Eight Form's 750 N. Nash Street data-center application was withdrawn and will not move forward. The proposed 49.5 MW/rounded 50 MW demand and dedicated substation remain historical project context; facility water, wastewater, energized capacity, IT load, workload allocation, and public funding remain unresolved.
Blocked or pausedconfirmedHigh concern
Site Snapshot
Location
El Segundo, Los Angeles County, California
Operator / sponsor
Unknown operator
Status / stage
Blocked or paused · blocked / paused
Scale
50 MW reported; Medium (11-50 MW); 230,780 sq ft
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.
Water
Source reviewed September 9, 2026: El Segundo's official pending-projects page says the 750 N. Nash Street application was withdrawn and will no longer move forward. The reviewed city record does not disclose facility water source, cooling method, withdrawal, consumption, or wastewater quantity; those fields remain unresolved.
Source reviewed September 9, 2026: El Segundo's official page documents the withdrawn proposal for a 230,780-square-foot data center and a dedicated 66/12-kV substation. A contemporaneous project summary reports up to 49.5 MW of daily demand, but that figure is proposed project demand, not approved, energized, generation, or data-center IT-load capacity. The dataset's rounded 50 MW remains unclassified proposed context.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.