Google's Botetourt campus has county zoning and August 2026 grading authorization, with fall 2026 grading expected. County and utility materials disclose planned water and wastewater reservations and attributed infrastructure/incentive terms, but not energized or data-center IT-load capacity.
ProposedconfirmedMedium concern
Site Snapshot
Location
Troutville (Botetourt County), Botetourt County, Virginia
Operator / sponsor
Google
Status / stage
Proposed · utility / power
Scale
Hyperscale (100-999 MW); 900,000 sq ft; 344 acres
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: Botetourt County reports a $14 million land purchase, a $4 million commitment to county initiatives over five years, discounted land pricing, and a tax-bill stabilization grant. These are attributed project commitments/incentives, not verified public spending; the $14 million dataset cost is not reclassified as public funding.
Source reviewed September 9, 2026: Botetourt County says Google must connect to Western Virginia Water Authority water and sewer, with a Day 1 reservation of no more than 2,000,000 gallons/day of water and 570,000 gallons/day of wastewater capacity. These are planned utility reservations, not measured consumption or final operating use; the county says Google will fund project infrastructure and share of broader improvements.
Source reviewed September 9, 2026: Botetourt County says grading plans and a land-disturbance permit were issued in August 2026, with on-site grading expected in fall 2026 and the first structure expected fit for use in 2028. The dataset's hyperscale label remains unclassified; no reviewed source establishes requested, approved, energized, generation, or data-center IT-load capacity.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.