PowerHouse Data Centers' Grand Prairie campus is under construction and the developer publishes 810 acres, 8.5 million square feet, and up to 1.8 GW of maximum utility power with Q1 2027 delivery. The 1.8 GW remains planned utility/project context, not energized or IT-load capacity; facility water, wastewater, workload allocation, and public funding remain unresolved.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: the source dataset reports a $72 million project_cost field, but the reviewed developer and Texas permit sources do not identify whether it is spending, investment, land, infrastructure, or public funding. Preserve it as an attributed dataset lead rather than a verified subsidy or expenditure.
Source reviewed September 9, 2026: PowerHouse's project page describes the campus scale and sustainability program but does not publish a facility-specific water withdrawal, consumption, cooling, or wastewater quantity. Preserve water use as unresolved.
Source reviewed September 9, 2026: PowerHouse Data Centers lists 1.8 GW as maximum utility power for its 810-acre, 8.5-million-square-foot campus and gives Q1 2027 delivery. This is developer-stated planned utility/project capacity, not energized or data-center IT load; phase-specific delivery and interconnection evidence remain unresolved.