High-priority Moberly / Randolph County lead with jurisdiction caveat: KRCG reported the City of Moberly said it had no data center proposals inside city limits as of June 2026, while MAEDC materials referenced Project Tiger / data-center due diligence and directory/satellite sources continue to list Project Tiger Zou near Moberly. Treat as a county/economic-development confirmation target, not a city-approved project.
ProposedconfirmedHigh concern
Site Snapshot
Location
Moberly, Randolph County, Missouri
Operator / sponsor
Unknown operator
Status / stage
Proposed · approval / land-use
Scale
Unknown; 1000 acres
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source lead: Moberly Area EDC's data-center FAQ says projects may request negotiated, time-limited tax abatements or PILOT agreements, but no Project Tiger Zou incentive agreement is attached. Local subsidy, tax-abatement, land, bond, and utility records still need follow-up.
Source lead: Moberly Area EDC's Randolph County data-center FAQ says local water utilities retain authority over capacity, limits, and rates, but it does not disclose a Project Tiger Zou water source or cooling design. Water-service, withdrawal, wastewater, and engineering records still need project-specific review.
Source lead: Moberly Area EDC's FAQ says Missouri large-load customers must pay for needed utility infrastructure, while Tilebox lists Project Tiger Zou as proposed at 5223 State Hwy AA. Utility tariff, interconnection, infrastructure-cost, and ratepayer records still need project-specific sourcing.