STAMP / Project Double Reed has a dated county-development source describing three proposed Stream buildings, a 20,000-gallons-per-day water-use estimate, and project-funded electrical infrastructure. The 500 MW dataset figure remains unclassified project/power context, and the proposed tax terms remain distinct from spent money or a cash subsidy.
Proposedconfirmed
Site Snapshot
Location
Alabama, Genesee County, New York
Operator / sponsor
Genesee County Economic Development Corporation (GCEDC)/Plug Power/Edwards Vaccum
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: GCEDC describes proposed sales-tax exemptions and property-tax payments, including estimated future local tax revenues, while stating the requested incentives would not transfer current or future taxpayer funds as cash. These are proposed incentive and revenue terms, not completed spending or a cash subsidy.
Source reviewed September 9, 2026: Genesee County Economic Development Corporation says Stream's proposed three-building project would use 20,000 gallons per day of water already available at STAMP. This is a developer/project planning estimate, not measured operating use or a published withdrawal, cooling, sewer, or wastewater-service quantity.
Source reviewed September 9, 2026: GCEDC says the project would use a portion of electrical capacity previously approved for STAMP and that Stream would pay for project-related electrical infrastructure and improvements. The dataset's 500 MW remains proposed project/power context, not confirmed requested, approved, energized, generation, or data-center IT-load capacity.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.