High-priority Port of Little Rock / Willowbend Capital proposal. The Corps notice improves provenance for the proposed five-building complex, environmental permitting, and applicant-provided power demand, but its factual inputs remain unverified and do not establish utility service or IT load. Google has been reported as the possible developer, while the Corps application names Willowbend Capital.
ProposedconfirmedHigh concern
Site Snapshot
Location
Little Rock, Pulaski County, Arkansas
Operator / sponsor
Willowbend Capital LLC
Status / stage
Proposed · approval / land-use
Scale
Unknown
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
The April 2026 USACE notice describes a proposed data center with AI among the uses under consideration. A City of Little Rock annexation and zoning record places the Project Boar site east of Fourche Bayou in the Little Rock Port area. The city's April 2025 resolution/MOU records a project evaluation and planned water, sewer and cooling-tower blowdown infrastructure; an August 2026 city agenda records a proposed exception for that MOU facility from the broader hyperscale application pause. Specific workloads and the training/inference split remain unresolved.
The City record supports Little Rock Port / east of Fourche Bayou as the project area but is a broad annexation and zoning record, not a precise parcel survey or workload disclosure. The April 2025 MOU describes an approximately 300,000-square-foot facility under evaluation and planned water, sewer and cooling-tower blowdown infrastructure. The August 4, 2026 agenda records a proposed ordinance clarifying that this MOU facility is excepted from the application pause; the agenda item was deferred and does not establish construction, operation or workload. Willowbend Capital LLC is the project company, not a confirmed operator or customer. Expected demand above 100 MW concerns the proposed project overall and is excluded from workload-capacity totals.
Source lead: dataset project_cost field reports $1 billion; The People Rule review of the Little Rock MOU reports a 30-year property-tax abatement target, bond ceilings, reduced electric/water/sewer franchise fees, a permit-fee cap, and annual city enrichment payments. Primary incentive, bond, and utility-fee records still need review.
Source reviewed September 9, 2026: the U.S. Army Corps of Engineers' April 6 public notice describes proposed impacts to unnamed tributaries and adjacent wetlands to Fourche Bayou, including about 16.8 acres of wetlands and 6,419 linear feet of streams. The notice does not disclose cooling-water source, withdrawal, water-service, or wastewater quantities; it also says the applicant's information has not been verified.
Source reviewed September 9, 2026: the Corps notice describes a proposed five-building data-center complex that may support AI and would likely draw more than 100 MW, with an electrical substation/switching station and transmission corridors. This is applicant-provided proposed demand, not requested, approved, energized, generation, or data-center IT-load capacity; utility tariff and interconnection records remain open.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.