High-priority Homer City redevelopment with a Pennsylvania DEP permit library and reported onsite natural-gas generation plan. The 4,500 MW dataset figure remains generation/project-scale context; the reviewed sources do not establish energized service, data-center IT load, workload allocation, or facility water quantity.
Under constructionconfirmed
Site Snapshot
Location
Homer City, Indiana County, Pennsylvania
Operator / sponsor
Homer City Redevelopment (with Kiewit as contractor/partner)
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area · Target online date
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: Pennsylvania DEP's Homer City redevelopment page lists the campus site, active air-quality and water-permit materials, NPDES applications, and related records, but the reviewed page does not establish a data-center water source, cooling quantity, withdrawal, consumption, or wastewater-service amount. Permit records concern the broader redevelopment and power infrastructure and should not be treated as data-center water use.
Source reviewed September 9, 2026: Pennsylvania DEP describes a more than 3,200-acre natural-gas-powered data-center campus at the former 2 GW coal plant and lists current air-quality permits; Axios reports the planned plant's initial 4,500 MW output, including about 3,700 MW for data centers and 700–800 MW for the grid, with first generation expected in early 2028. These are planned generation/campus-output figures, not confirmed energized capacity or data-center IT load; the dataset's 4,500 MW remains unclassified project/power context.