Cloverleaf's Carlton proposal near the former Kewaunee Power Station is a historical, no-longer-pursued lead. The 100 MW dataset figure remains unclassified project context; public water, utility-service, energized, IT-load, and funding records were not established.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
No public funding record attached yet. Local subsidy, tax-abatement, land, bond, and utility records need follow-up.
Water
Source review September 9, 2026: the reviewed Carlton/Cloverleaf public trail does not disclose a water source, cooling method, withdrawal permit, wastewater capacity, or operating-use quantity. The dataset's water/cooling fields remain unresolved.
Source review September 9, 2026: town and developer officials said Cloverleaf stopped pursuing the Carlton site near the decommissioned Kewaunee Power Station after local opposition. The dataset's 100 MW remains historical proposed project context, not confirmed requested, approved, energized, generation, or data-center IT-load capacity.