Proposed-site record

NE Edge Groton Data Center

The dataset pairs a Groton project name with a Waterford location. The reviewed newspaper editorial distinguishes an earlier Groton proposal from a separate Waterford/Millstone plan. Identity and current status remain unresolved; Blocked or paused is retained as the dataset status, not independent current-status verification. A Michigan moratorium does not establish a Connecticut restriction.

Blocked or pausedconfirmedMedium concern

Site Snapshot

Location
Waterford, New London County, Connecticut
Operator / sponsor
Unknown operator
Status / stage
Blocked or paused · identity / status unresolved
Scale
1500 MW reported; Mega campus (>1,000 MW); 1,500,000 sq ft; 25 acres
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.

Workload classification remains unknown in the reviewed record.

Data Fields

Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.

Public Money

No public funding record attached yet for the unresolved Groton/Waterford identity. A separate Waterford host-municipality agreement does not establish a paid amount, subsidy or completed public spending for this record.

Water

This dataset record pairs a Groton project name with a Waterford location. The Connecticut-hosted newspaper editorial discusses a separate Waterford/Millstone proposal after earlier Groton plans; it does not establish water source, cooling, withdrawal, consumption or wastewater quantities for this unresolved record.

Power

The dataset reports 1,500 MW, but project identity and the figure’s scope remain unresolved. Do not apply a Pennsylvania proposal’s capacity or a separate Waterford project’s status to this record. No requested, approved, energized, generation or IT-load capacity is verified here.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

NDA / Secrecy

No NDA reported

Missing NDA / secrecy, Public moneyFields with source leads: Water, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.