High-priority Red Wolf DCD Properties proposal in western Wyandotte County near Parallel Parkway. Wyandotte County approved master plans for a six-building campus in July 2025; later reporting documented litigation and utility-cost concerns. The project remains proposed, and its 600 MW figure is not an approved or operating capacity measure.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: The Beacon reports that BPU infrastructure and capacity costs must be balanced against data-center revenue, with any gap potentially affecting ratepayers. No reviewed bond, incentive, cost-recovery, or development-agreement record establishes a public subsidy or spent amount.
Source review: the reviewed public materials describe the campus and utility concerns but disclose no water source, cooling method, withdrawal permit, or wastewater quantity. Kansas City BPU water-service and wastewater records remain open leads.
Source reviewed September 9, 2026: Wyandotte County coverage records approved master plans for six proposed buildings totaling about 600 MW of energy demand, while The Beacon describes a possible 300 MW north / 300 MW south BPU system impact. The dataset's 600 MW remains proposed project-scale/utility-demand context, not confirmed requested, approved, energized, generation, or data-center IT-load capacity; interconnection, tariff, and ratepayer records remain separate review leads.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.