Proposed-site record

Red Wolf Properties

High-priority Red Wolf DCD Properties proposal in western Wyandotte County near Parallel Parkway. Wyandotte County approved master plans for a six-building campus in July 2025; later reporting documented litigation and utility-cost concerns. The project remains proposed, and its 600 MW figure is not an approved or operating capacity measure.

ProposedconfirmedHigh concern

Site Snapshot

Location
Kansas City, Wyandotte County, Kansas
Operator / sponsor
Unknown operator
Status / stage
Proposed · approval / land-use
Scale
600 MW reported; Hyperscale (100-999 MW); 1,980,000 sq ft; 540 acres
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area

Compute Workload

This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.

Undisclosed / unknownUnknown

No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.

Workload classification remains unknown in the reviewed record.

Public Money

Source reviewed September 9, 2026: The Beacon reports that BPU infrastructure and capacity costs must be balanced against data-center revenue, with any gap potentially affecting ratepayers. No reviewed bond, incentive, cost-recovery, or development-agreement record establishes a public subsidy or spent amount.

Water

Source review: the reviewed public materials describe the campus and utility concerns but disclose no water source, cooling method, withdrawal permit, or wastewater quantity. Kansas City BPU water-service and wastewater records remain open leads.

Power

Source reviewed September 9, 2026: Wyandotte County coverage records approved master plans for six proposed buildings totaling about 600 MW of energy demand, while The Beacon describes a possible 300 MW north / 300 MW south BPU system impact. The dataset's 600 MW remains proposed project-scale/utility-demand context, not confirmed requested, approved, energized, generation, or data-center IT-load capacity; interconnection, tariff, and ratepayer records remain separate review leads.

Bloom / Fuel Cells

No fuel-cell or Bloom Energy source is attached to this project yet.

NDA / Secrecy

No NDA reported

Missing NDA / secrecyFields with source leads: Public money, Water, Power
Discuss this project

Community Discussion

Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.

Start Project Thread

Sources and Leads

These links are the current public trail for this record. Treat broad dataset links as leads; local documents and reporting carry more weight.