High-priority Applied Digital proposal with a South Dakota PUC facility-permit record for a separate 145 MW dual-fuel generation plant and 345 kV tie line near Toronto. The dataset's 430 MW remains unclassified project/power context; no reviewed source establishes data-center IT load, energized capacity, water quantity, workload, or customer allocation.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: the South Dakota PUC Toronto Power Plant application describes the proposed energy-conversion facility and transmission line but does not disclose a data-center water source, cooling method, withdrawal, consumption, or wastewater quantity. The 145 MW plant record is separate power-infrastructure context and should not be treated as facility water evidence.
Source reviewed September 9, 2026: South Dakota PUC docket EL25-028 identifies a proposed 145 MW dual-fuel Toronto Power Plant and approximately 4.9 miles of 345 kV generation-tie transmission to the Astoria substation, with commercial operation expected in 2029. This is proposed generation and transmission infrastructure, not confirmed requested, approved, energized, or data-center IT-load capacity; the dataset's 430 MW remains unclassified project/power context.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.