Joliet's proposed 795-acre Hillwood/PowerHouse campus is moving through public zoning, annexation, utility, and development-agreement processes. The planned 1.8 GW and developer tax-impact claims remain separate from approved or energized capacity, measured water, wastewater, workload, and public spending.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: the developer describes about $20 billion of private investment and projects about $2.1 billion in property taxes over 30 years. These are attributed investment and tax-impact projections, not recorded spending or a public subsidy; the City's posted tax and development-agreement materials remain the relevant public-money trail.
Source reviewed September 9, 2026: the developer's project page describes closed-loop cooling and no process-water discharge, but the City's transparency page links a water-and-sewer narrative without establishing a final service quantity, withdrawal, measured consumption, or wastewater capacity. Preserve the design claim as attributed and the facility quantities as unresolved.
Source reviewed September 9, 2026: the developer describes a planned, phased 1.8 GW campus to be served by ComEd with no planned onsite generation, while the City of Joliet says the 795-acre proposal remains in public zoning, annexation, utility, and development-agreement processes. This is planned campus and utility-service context, not an approved, energized, or confirmed data-center IT-load figure.