El Paso confirms the Meta/Wurldwide project is a five-phase hyperscale campus with Phase 1 underway and publishes tiered water-allocation ceilings plus a separate proposed 366 MW generation bridge. The dataset's 1,000 MW remains unclassified project/power context; energized capacity, IT load, measured water and wastewater, workload allocation, and direct public subsidy remain unresolved.
Reported project context; confirm whether any MW figure is requested, approved, energized, IT load, generation, or ultimate buildout before comparing it with another record.Capacity reading: Project-scale context · MW type not established · Proposed floor area · Site area · Target online date
Compute Workload
This panel tracks what the facility is for without assuming that every project is AI training, inference, or cloud capacity.
Undisclosed / unknownUnknown
No source-backed workload, customer, hardware, or training/inference allocation is attached to this record yet.
Workload classification remains unknown in the reviewed record.
Data Fields
Source leads point to attached records or reporting. They still need field-level review before being treated as verified evidence.
Source reviewed September 9, 2026: El Paso describes approved land, Chapter 380, and tax-abatement agreements, projected tax revenue, and up to $5 million in non-taxpayer roadway/intersection funding benefiting the wider Northeast community. These are agreements, projections, and infrastructure funding—not verified project spending or a direct subsidy amount attributable to the facility.
Source reviewed September 9, 2026: the City of El Paso's data-center resource hub describes tiered water allocations for the Meta/Wurldwide project, including a Tier III maximum of 2.5 million gallons per day and average of 1.5 million gallons per day at full buildout. These are agreement/allocation ceilings, not measured facility consumption or wastewater discharge; the project's actual phase, source, cooling use, and wastewater quantities remain unresolved.
Source reviewed September 9, 2026: the City of El Paso says the five-phase Meta/Wurldwide project has Phase 1 underway. The city's June 2026 filing describes a separate proposed 366 MW McCloud natural-gas facility intended to serve the project during a bridge period, while its policy framework identifies another 525 MW of Meta-related generation capacity still to be defined. The dataset's 1,000 MW remains unclassified project/power context, not energized or data-center IT load.
Start a moderated thread for local questions, meeting notes, public-records coordination, or context that should not be treated as verified evidence yet.